MONTHYEARML20009E8641981-05-31031 May 1981 Revised Main Control Room Habitability Study Project stage: Other ML20009E8541981-07-20020 July 1981 Forwards Revised Main Control Room Habitability Study, Per NUREG-0737,Item III.D.3.4.Revision Corrects Errors in Radiological Analysis Assumptions.Mods Recommended in Toxic Chemical Study Will Be Scheduled for Completion by 830101 Project stage: Other ML20024B0831983-07-0101 July 1983 Forwards Application to Amend Licenses DPR-42 & DPR-60, Revising Tech Specs Re Containment Sys Recombiners,Control Room Air Treatment Sys & Ref to FSAR Table 7.7-2.Changes Do Not Constitute Significant Hazards Consideration Project stage: Request ML20024B0851983-07-0101 July 1983 Application to Amend Licenses DPR-42 & DPR-60,revising Tech Specs Re Containment Sys Recombiners,Control Room Air Treatment Sys & Ref to FSAR Table 7.7-2 Project stage: Request ML20024B0871983-07-0101 July 1983 Proposed Tech Specs Re Containment Sys Recombiners,Control Room Air Treatment Sys & Ref to FSAR Table 7.7-2 Project stage: Other ML20077N9441983-08-26026 August 1983 Application for Amend to Licenses DPR-42 & DPR-60, Changing Tech Specs Re Addition of Instruments to Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Request ML20077N9221983-08-26026 August 1983 Forwards Application for Amend to Licenses DPR-42 & DPR-60, Changing Tech Specs Re Addition of Instruments to Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Request ML20077N9561983-08-26026 August 1983 Proposed Tech Specs Re Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Other ML20079G0381984-01-13013 January 1984 Forwards Application for Amend to Licenses DPR-42 & DPR-60, to Provide Assurance of Reactor Coolant Vent Sys Operability & Reliability,Implementing Requirements of NUREG-0737,Item II.B.1 Project stage: Request ML20079G0461984-01-13013 January 1984 Application for Amend to License DPR-42 & DPR-60,providing Assurance of Reactor Coolant Vent Sys Operability & Reliability,Implementing Requirements of NUREG-0737,Item II.B.1 Project stage: Request ML20079G0541984-01-13013 January 1984 Proposed Tech Spec Changes Providing Assurance of Reactor Coolant Vent Sys Operability & Reliability Project stage: Other ML20088A2551984-03-27027 March 1984 Safety Evaluation Supporting Amends 69 & 63 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML20088A8861984-04-10010 April 1984 Forwards Application to Amend Licenses DPR-42 & DPR-60, Revising Tech Specs in Response to Generic Ltr 83-37,to Implement Requirements of NUREG-0737,Items II.B.3,II.F.1.2 & III.D.3.4 Project stage: Request ML20088A8931984-04-10010 April 1984 Application to Amend Licenses DPR-42 & DPR-60,revising Tech Specs in Response to Generic Ltr 83-37 to Implement Requirements of NUREG-0737,Items II.B.3,II.F.1.2 & III.D.3.4 Project stage: Request ML20088A8961984-04-10010 April 1984 Proposed Tech Specs in Response to Generic Ltr 83-37, Implementing Requirements of NUREG-0737,Items II.B.3, II.F.1.2 & III.D.3.4 Project stage: Other ML20090D3981984-06-20020 June 1984 Toxic Chemical Study Project stage: Other ML20090D3761984-07-0909 July 1984 Suppl 1 to 840410 Application for Amend to Licenses DPR-42 & DPR-60,changing Tech Specs to Delete Requirement for Ammonia,Hydrocloric Acid & Formaldehyde Gas Detection Sys in Main Control Room,Per NUREG-0737,Item III.D.3.4 Project stage: Request ML20090D3651984-07-0909 July 1984 Forwards Suppl 1 to 840410 Application for Amend to Licenses DPR-42 & DPR-60,changing Tech Specs to Delete Requirement for Ammonia,Hydrocloric Acid & Formaldehyde Gas Detection Sys in Main Control Room,Per NUREG-0737,Item III.D.3.4 Project stage: Request ML20108B1621984-10-25025 October 1984 Corrected Amends 70 & 64 to Licenses DPR-42 & DPR-60, Respectively,Adding Tech Spec 3.14-4 Re Operator Action for Inoperable Containment Ventilation Isolation Sys, Inadvertently Omitted from 840912 Amends Project stage: Other ML20106J8841984-10-26026 October 1984 Advises That Manual Isolation Valves in Unit 1 Vent Line Blocked & Tagged in Accordance W/Requirements of Tech Spec 4.18.Tech Spec for Reactor Coolant Vent Sys Implemented Project stage: Other 1984-10-25
[Table View] |
Text
.
TABLE TS.3.5-4 INSTRUMENT OPERATING CONDITIONS FOR ISOLATION FUNCTIONS i
ee
$E
[
1 2
3 4.
MH MINIMUM MINIMUM PERMISSIBLE. OPERATOR ACTION IF 8 8 OPERABLE DEGREE OF BYPASS CONDITIONS OF_ COLUMN l '
y g FUNCTIONAL UNIT CHANNELS REDUNDANCY CONDITIONS l'OR 2 CANNOT BE MET
+
l E$
I g g 1.
CONTAINMENT ISOLATION kk a.
Safety Injection (See Item No. 1 of Table TS.3.5-3) Hot shutdown **
b.
Manual 2
1 Hot shutdown gg 2.
CONTAINMENT VENTILATION ISOLATION
~
a.
Safety Injection (See Item No. 1 of Table TS.3.5-3) Maintain Purge <
aervice Purge Valves-closed if inditions b.
liigh Radiation in Exhaust Air 2
1 s
of a, b, or c canno, met above c.
Manual 2
1 Cold Shutdown or (2) if coaditions of b,or c cannot b'e met during fuel handling in' containment.
umtn 3.
STEAM LINE ISOLATION
>C a.
Hi-Hi Steam Flow with Safety 2
1 Hot shutdown **
E$
Injection ou
- p:u b.
Hi Steam Flow and 2 of 4 Low T 2
1 Hot shutdown **
with Safety Injection uto c.
Hi Containment Pressure 1/ loop 1
Hot shutdown **
@g uOO d.
Manual 1/ loop
. flot shutdown **
L 4.
EMERGENCY.C00LDOWN EQUIPMENT ROOM ISOLATION a.
liigh temperature in ventilation 2
1 Hot shutdown **
system ducts
- If minimum conditions are not met within 24' hours, steps'shall be taken un the affected unit to place'the unit in cold shutdown conditions.
0
o r,
TS.3.14-4 i
F.
Yard Hydrant Hose Houses 1.
Whenever equipment in the'following buildings is required to be operable, the yard hydrant hose houses in the main yard. loop adjacent to each building shall be operable:
j 1
L a.
Unit No. 1 Reactor Building l
b.
Unit No. 2 Reactor Building c.
Turbine Building d ' ' Jbuciliary, Building
~~~
l e.
Screen House -
'2.
If Specification 3.14.F.1 cannot be met, within one hour have sufficient additional lengths of 2-1/2 inch diameter hose located in adjacent operable yard hydrant -hose house (s) to provide service to'the unprotected area (s).
1 i
Restore the yard hydrant hose house (s) to Operable status within
,I 14 days or submit a 30-day written report outlining the cause of the '
l inoperability and the plans and schedule for restoring the houses to i
Operable status.
+
i G.
Penetration Fire Barriers
[
I 1.
All penetration fire barriers -in-fire. area boundaries protecting i
equipment required to be operable shall be operable, j
2.
If Specification 3.14.G.1 cannot be met, a continuous fire watch shall be established on at least one side of the affected penetra-tion (s) within one hour.
4 Restore the inoperable penetration fire barriers to Operable status within 14 days or submit a 30-day written report outlining the cause
' of the inoperability and the plans and schedule for restoring the barriers to Operable status.
Prairie Island Unit 1 Amendment No. 26, /S, 70 Prairie Island Unit 2 Amendment No. 26, AA, 64