Letter Sequence Request |
|---|
|
|
MONTHYEARML20009E8641981-05-31031 May 1981 Revised Main Control Room Habitability Study Project stage: Other ML20009E8541981-07-20020 July 1981 Forwards Revised Main Control Room Habitability Study, Per NUREG-0737,Item III.D.3.4.Revision Corrects Errors in Radiological Analysis Assumptions.Mods Recommended in Toxic Chemical Study Will Be Scheduled for Completion by 830101 Project stage: Other ML20024B0851983-07-0101 July 1983 Application to Amend Licenses DPR-42 & DPR-60,revising Tech Specs Re Containment Sys Recombiners,Control Room Air Treatment Sys & Ref to FSAR Table 7.7-2 Project stage: Request ML20024B0831983-07-0101 July 1983 Forwards Application to Amend Licenses DPR-42 & DPR-60, Revising Tech Specs Re Containment Sys Recombiners,Control Room Air Treatment Sys & Ref to FSAR Table 7.7-2.Changes Do Not Constitute Significant Hazards Consideration Project stage: Request ML20024B0871983-07-0101 July 1983 Proposed Tech Specs Re Containment Sys Recombiners,Control Room Air Treatment Sys & Ref to FSAR Table 7.7-2 Project stage: Other ML20077N9441983-08-26026 August 1983 Application for Amend to Licenses DPR-42 & DPR-60, Changing Tech Specs Re Addition of Instruments to Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Request ML20077N9221983-08-26026 August 1983 Forwards Application for Amend to Licenses DPR-42 & DPR-60, Changing Tech Specs Re Addition of Instruments to Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Request ML20077N9561983-08-26026 August 1983 Proposed Tech Specs Re Event Monitoring Instrumentation & Chlorine Detection Sys Project stage: Other ML20079G0381984-01-13013 January 1984 Forwards Application for Amend to Licenses DPR-42 & DPR-60, to Provide Assurance of Reactor Coolant Vent Sys Operability & Reliability,Implementing Requirements of NUREG-0737,Item II.B.1 Project stage: Request ML20079G0461984-01-13013 January 1984 Application for Amend to License DPR-42 & DPR-60,providing Assurance of Reactor Coolant Vent Sys Operability & Reliability,Implementing Requirements of NUREG-0737,Item II.B.1 Project stage: Request ML20079G0541984-01-13013 January 1984 Proposed Tech Spec Changes Providing Assurance of Reactor Coolant Vent Sys Operability & Reliability Project stage: Other ML20088A2551984-03-27027 March 1984 Safety Evaluation Supporting Amends 69 & 63 to Licenses DPR-42 & DPR-60,respectively Project stage: Approval ML20088A8861984-04-10010 April 1984 Forwards Application to Amend Licenses DPR-42 & DPR-60, Revising Tech Specs in Response to Generic Ltr 83-37,to Implement Requirements of NUREG-0737,Items II.B.3,II.F.1.2 & III.D.3.4 Project stage: Request ML20088A8931984-04-10010 April 1984 Application to Amend Licenses DPR-42 & DPR-60,revising Tech Specs in Response to Generic Ltr 83-37 to Implement Requirements of NUREG-0737,Items II.B.3,II.F.1.2 & III.D.3.4 Project stage: Request ML20088A8961984-04-10010 April 1984 Proposed Tech Specs in Response to Generic Ltr 83-37, Implementing Requirements of NUREG-0737,Items II.B.3, II.F.1.2 & III.D.3.4 Project stage: Other ML20090D3981984-06-20020 June 1984 Toxic Chemical Study Project stage: Other ML20090D3761984-07-0909 July 1984 Suppl 1 to 840410 Application for Amend to Licenses DPR-42 & DPR-60,changing Tech Specs to Delete Requirement for Ammonia,Hydrocloric Acid & Formaldehyde Gas Detection Sys in Main Control Room,Per NUREG-0737,Item III.D.3.4 Project stage: Request ML20090D3651984-07-0909 July 1984 Forwards Suppl 1 to 840410 Application for Amend to Licenses DPR-42 & DPR-60,changing Tech Specs to Delete Requirement for Ammonia,Hydrocloric Acid & Formaldehyde Gas Detection Sys in Main Control Room,Per NUREG-0737,Item III.D.3.4 Project stage: Request ML20108B1621984-10-25025 October 1984 Corrected Amends 70 & 64 to Licenses DPR-42 & DPR-60, Respectively,Adding Tech Spec 3.14-4 Re Operator Action for Inoperable Containment Ventilation Isolation Sys, Inadvertently Omitted from 840912 Amends Project stage: Other ML20106J8841984-10-26026 October 1984 Advises That Manual Isolation Valves in Unit 1 Vent Line Blocked & Tagged in Accordance W/Requirements of Tech Spec 4.18.Tech Spec for Reactor Coolant Vent Sys Implemented Project stage: Other 1984-10-25
[Table View] |
Text
_ _ _ _ _ _ _ _
UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket No. 50-282 50-306 REQUEST FOR AMENDMENT TO OPERATING LICENSE NOS. DPR-42 & DPR-60 License Amendment Request Dated July 1, 1983, Revision 1 Northern States Power Company, a Minnesota corporation, request authorization for changes to the Te:hnical Specifications as shown on the attachments labeled Exh!. bit A and Exhibit L Exhibit A describes the proposed changes along with reasons for the change.
Exhibit B is a set of Technical Specification pages incorporating the proposed changes.
This letter contains no restricted or other defense information.-
NORTHERN STATES POWER COMPANY O k s.,
By David Musolf L
Manager - Nuclear Support Services J[7 day of MM-
/883 before me a notary public in and On this for said County, personally appeared David Musolf, Manager - Nuclear Support Services, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay.
Yi Q.
gu
- I
< (( otanv evauc.umcsora 85 TTY J DEAN j
2 s
RAMSEY COUNTY a
{
u, comm oa s o c w mj
~~
F309130256 830826
~~~
~
PDR ADOCK 05000282 P
PDR
4 EXHIBIT A Prairie Island Nuclear Generating Plant License Amendment Request Dated July 1,1983 Revision 1 Proposed Changes to the Technical Specifications Appendix A of Operating Licenses DPR-42 and DPR-60 Pursuant to 10 CFR 50.59 and 50.90, the holders of operating licenses DPR-42 and DPR-60 hereby propose the following changes to Appendix A, Technical Specifications:
1.
Specification: Event Monitoring Table TS.3.15-1 PROPOSED CHANGE Table 3.15-1 is to be revised as noted in Exhibit B.
REASON FOR CHANGE These changes revise the Technical Specifications to reflect the containment pressure, level and hydrogen monitors installed in response to NUREG-0737, Item II.F.1-(4)(5) & (6).
SIGNIFICANT HAZARDS EVALUATION The proposed limiting conditions for operation and surveillance requirements constitute additional limitations, restrictions and controls not presently included in the Technical Specifications.
We believe none of the requested changes constitute a Significant Hazards consideration since they do not:
1) involve a significant increase in the probability of consequences of an accident previously evaluated; or
- 2) create the possibility of a new or different kind of accident from any accident previously evaluated; or 3) involve a significant reduction in a margin of safety.
2.
Specification: TS page TS.3.13-1A See the original License Amendment Requeat dated July 1, 1983 for Proposed Change Reason for change and Significant Hazards Evaluation.
Only the wording on page TS.3.13-1A was changed.
4-EXHIBIT B License Amendment Request Dated July 1, 1983 Revision 1 Exhibit B, attached, consists of the following revised pages of the Appendix A Technical Specifications which incorporate the proposed changes.
PAGES Table TS.3.15-1
~
4 TS.3.13-1A i
4