U.S. NUCLEAR REGULATORY COMMISSloN NHC FOIA HEOULS1 NOVBEH(S)
NODb F OlA 375 RESPONSE TYPE
)
[
.i RESPONSE TO FREEDOM OF l FINAL l X l PARTI AL jSt i
INFORMATION ACT (FOlA) REQUEST DATE j
%...../
SEP 141993 DOCKET NUMBER (S)(//applicablef REQUE STE R Ms. Judith A. Lockhart PART l.-AGENCY RECORDS RELEASED OR NoT LOCATED fSee checkedboxes/
No agency records subject to the request have been located.
l No additional agency records subject to the request have been located, Requested records are available through another public distribution program. See Comments section.
Agency records subject to the request that are identified in Append;x(es) are already available for public inspection and copying at the f
NRC Public Document Room,2120 L Street, N.W., Washington, DC.
A Agency records subject to the request that are identified in Appendix (es) are being made available for pubt;c inspection and copying X
st the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this FolA number.
The nonproprietary version of the proposal (s) that you agreed to accept in a telephone conversation with a member of my staff is now being made available l
for pubhc inspection and copying at the NRC Public Document Room,2120 L Street, N.W., Washington, DC, in a folder under this Fot A number.
Agency records subject to the request that are identified in Appendix (es) may be inspected and copied at the NRC Local Public Document Room identified in the Comments section.
j Enclosed is information on how you may obta;n access to and the charges for copying records located at the NRC Public Document Room,2120 L Street, M N.W., Washington, DC.
X Agency records subject to the request are enclosed.
Records subiect to the request have been referred to another Federal agency (ies) for review and direct response to you.
Fees You will be billed by the NRC for fees totaling $
You will receive a refund from the NRC in the amount of $
in view o' W RC's response to this request, no further action is being taken on appeal letter dated
, No.
~
PART ll. A-INFORMATION WITHHELD FROM PUBLIC DISCLOSURE Certal information in the requested records is being withheld from public disclosure pursuant to the exemptions described in and for the reasons stated in Par,11. 8, C, and D. Any released portions of the documents for which only part of the record is being withheld are being made available for public inspection d copying in the NRC Public Document Room,2120 L Street, N.W., Washington, DC in a folder under this FOI A number.
COMMENTS In a telephone conversation with Ms. Carol Ann Reed on September 13, 1993, you agreed to scope out of your request the following record in view of the fact that you already have a copy- " Plant Design Assessment for SRV and LOCA Loads, Shoreham Nuclear Power Station Unit 1, Proprietary Supplement, Revision 3, November 1978."
The review of additional records is ongoing. As soon as our review is completed, we will notify you.
/)
O' DOM Of thFORMATION AND PUBLICATIONS SEF: VICES ON OFpF SIGNA U DIR ECT OR, Di Ngis N [Myf hdb
/
[ * % q s ; Q % < j f Q i f f % Qf l % f.
W 7%
+
+
, &v m& + g MJ % + m &m J M y;g a x n' e w '
@ q!
J%'
n A
. QMkd:,
.a x W.
~
9409280259 930914 w 5"%n sMM~
MM pg -
A #
~,MfWW-iWMMM 4
S y +- y
, f 9 g, y ; g' g.4 %
M "M
. g
' l{w LOCKHART93-375 PDR,
- Q
L 4
Re:
F0!A-93-375 APPENDIX A
{
RECORDS BEING PLACED INTO l'E PDR UNDER THE AB0VE REQUEST NUMBER NUMBER DATE DESCRIPTION 1.
1/3/73 Memo to All Water Reactors re: Review of Consequences of a Pipe Failure Outside of Containment (1 page) 2.
9/26/75 Memo to V. A. Moore from R. R. Maccary re:
Acceptance Review of FSAR for Shoreham Nuclear
]
Plant Unit No. I with attachments (7 pages) i 3.
3/26/76 Memo to J. P. Knight from S. Hou re: Meeting with Bechtel Regarding Main Steam Tunnel Design with attachment (3 pages) 4.
11/9/76 U.S. Court of Appeals, District of Columbia Circuit, re: Orders case of Lloyd Harbor Study Group vs NRC (w/Long Island Lighting Co. as intervenor) to be remanded to NRC for further consideration of environ impact of nuclear fuel cycle (2pages) 5.
2/14/78 Memo to D. B. Vassallo from R. L. Tedesco re:
Davis-Besse, Unit Nos. 2 & 3 - Protection Against Main Steam Line Break with attachment (3 pages) 6.
9/12/78 Memo to D. B. Vassallo from D. R. Ross re:
Request for Additional Information - Shoreham Nuclear Power Station (2 pages) 7.
10/25/78 Memo to R. L.Baer'from R. A. Clark re:
Safeguards Input for Shoreham Nuclear Power Station Unit No. 1 (2 pages) 8.
10/30/78 Memo to S. A. Varga from W. P. Haass re: Review of LILCO's Amendment for QA to Shoreham FSAR (1 page) 9.
11/29/78 District of Columbia Circuit, U.S. Court of Appeals re: Petition of Lloyd Harbor Study Group is denied.
" Class 9" accident contention is w/o merit. Remainder of petition on environmental impact shall remain in abeyance, pending issuance of final fuel cycle rule (2pages) 10.
12/4/78 Memo to Distribut. ion from J. N. Wilson re:
ShorehamSERIssues(9pages) l i
u m.
w f
I t
Re:
F0!A-93-375 APPENDIX A l
(continued)
RECORDS BEING PLACED INTO THE PDR UNDER THE AB0VE REQUEST NUMBER NUMBER DATE DESCRIPTION 11.
12/5/78 Note Reactor Safety EC's/SL's from R. L. Tedesco re: Shoreham Draft SER (2pages) 12.
12/6/78 Note to W. Butler from T. M. Su re: Status of Shoreham Open Items (2pages) 13.
12/8/78 Memo to T. M. Novak from W. R. Mills re:
Shoreham Open Item - Protection Against Passive Failures During the Long-Term Post-LOCA Period (2pages) 14.
12/12/78 Note to E. Case from R. S. Boyd re: Shoreham SER l
(2 pages) 15.
12/22/78 Memo to D. B. Vassallo from R. L. Tedesco re:
SER Input - Shoreham (15 pages) 16.
4/23/81 Memo-to R. L. Tedesco from J. P. Knight re: SER Input for Shoreham with attachment (13 pages) 17.
7/81 Branch Technical Position MEB 3-1, Postulated Rupture Locations in Fluid System Piping Inside and Outside Containment (9 pages) 1 4