Lists Actions to Be Taken by DPM in Preparing Addl Work Inputs to Complete SER for Subj Facil.Areas in Which Actions Are to Be Taken Incl Generic Items,Regulations & Gen Design Criteria & Bd Notification
ML20071G062
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/05/1978
From: Tedesco R
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20071F735 List:
References
FOIA-93-375 NUDOCS 7812200150
Download: ML20071G062 (2)


Text

hs-g r-he l

l l

}

e...

DISTRIBUTION:

DEC 0 51978 Central Files /

NRR R/F A/DRS R/F

\\

NOTE FOR: Reactor Safety B/Cs Reactor Safety S/Ls FROM:

R. L. Tede.sco l

SUBJECT:

SHORDW1 S'ER.(DRAFT)

I Efforts are currently undenray to complete the SER for Shoreham. As part of these efforts, OEl.D has indicated that certain additional inputs will be needed. These will be described below in detail but I want to encourage your cooperation in resolving them. Should you find that a major impact or pboblem is developing, please see me im-mediately so we may work out a plan to deal with any of the problems.

As I understand the plan, DPH is taking the lead in preparing addi-tional work inputs. Upon completion, the PM will contact the reviewer to ensure his. concurrences as appropriate. The actions are as follows:

i (1) Generic Items _

DPH to prepare an appendix to include M.AB-444 type l

. write-ups on the generic

.i tems. Each reviewer will be asked to review the' write-ups

' that apply to his area of review to ensure his support.

and ability to testify on their correctness. This appendix say be issued later.

(2) Regulations / General Design There are a nteber of GDC not criteria specifically identified in the SER. OPM will identify them per section and contact the reviewer to work in suit-1 able inclusions into each appropriate SER section. This will be part of the present SER.

WW8 >

woes a es >

eats >

i.........................

Mac posud 3:s aNo) NECM 0140 kh.* -

p-7 H I.' ' () () f Sr '

7 7/L 2D O /YD M L l~

t

T.l

.i

%gl i

1 2

.e MC45 83 2

f (3) Board Notification _

DPM will identify these since January.'76 through December

'78 to ensure that they.have been included in the Shoreham review Each reviewer will s

be co'ntacted.to verify such I

action. This may not be part of the SER but will be available to the Bqard if' asked.

1 Ortdnal Signed by

{

Bobert L. Terlese.

e R. L. Tedesco 1

1 i

1 l

. 05.i.. A/MC....

-.e*

owsuname >

,.h.f.$.d.9.k.h. @,f.,........................

1.2../.c/../.7.8..................................................,................................

8 * *. * * * *a a*

  • a' ***a"a* ** *'s a e e e e s e e e e e Pe C POELad )t3 (p.74) feLOd Olet

.