ML20072P531

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Pages for 940325 LAR Administrative Changes
ML20072P531
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/24/1994
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20072P529 List:
References
NUDOCS 9409080022
Download: ML20072P531 (21)


Text

_.

~

~

2.2 LIMITING SAFETY SYSTEM SETTINGS-BASES 2.2.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION'SETo0lNTS The Reactor Protection System Instrumentation Setpoints specified in Table 2.2.1-1 are the values at which the Reactor Trips are set for each parameter.

The Trip Setpoints have been selected to ensure that the reactor core and reactor coolant system are prevented from exceeding their safety limits.

1.

Intermediate Ranoe Monitor. Neutron Flux - Hiah The IRM system consists of 8 chambers. 4 in each of the reactor trip systems The IRM is a 5-decade 10-range instrument. The trip setpoint of 120 divisions is active in each of the 10 ranges.

Thus as the IRM is ranged up to accommodate the increase in power level, the trip setpoint is also ranged up.

Range 10 allows the IRM instruments to remain on scale at higher power levels to provide for additional overlap and also permits calibration at these higher powers.

The most significant source of reactivity change during the power increase is due-to control rod withdrawal.

In order to ensure that the IRM 3rovides the required protection. a range of rod withdrawal accidents have 3een analyzed. Section 7.5 of the FSAR.

The most severe case involves an initial condition in which the reactor is just subtritical r ' the IRMs are not yet on scale. Additional conservatism was taken in ' % s analysis by assuming the IRM channel closest to the rod being withdravm is bypassed.

The results of this analysis show that the reactor is shut down and peak power is limited to 1% of RATED THERMAL POWER, thus maintaining MCPR above the Safety Limit MCPR of Specification 2.1.2.

Based on.this analysis, the IRM provides protection against local control rod errors and continuous withdrawal of control rods in sequence and provides backup protection for the APRM.

2.

Average Power Range Monitor For operation at low pressure and low flow during STARTUP. the. APRM scram setting of 15% of RATED THERMAL POWER provides adequate thermal margin between the setpoint and the Safety Limits.

This margin accommodates the anticipated maneuvers associated with power plant startup.

Effects of increasing pressure at zero or low void content are minor, cold water from-sources available during startup is not much colder than that already in the system. temperature coefficients are small, and control rod patterns are constrained by the RWM. Of all the possible sources of reactivity input.

I uniform control rod withdrawal is the nost probable cause of significant power increase. Because the flux distribution associated with uniform rod withdrawals does not involve high local peaks and because several rods must be moved te change power by a significant amount, the rate of power rise is very slow. Generally, the heat flux is in near equilibrium with the fission rate.

In an assumed uniform rod withdrawal approach to the trip level, the rate of power rise is not more than 5% of RATED THERMAL POWER per minute and the APRM

. system would 9409080022 940924 PDR ADOCK 05000324 P

PDR BRUNSWICK - UNIT 1-B 2-4 Amendment No.

i J

' 2'. 2 LIMITING SAFETY SYSTEM SETTINGS.

BASES (Continued) 4.

Reactor Vessel Water Level-Low. Level #1 The reactor water level trip point was chosen far enough below the normal operating level to avoid spurious scrams but high enough above the' fuel to assure that there is adequate water to account for evaporation losses and displacement of cooling following the most severe transients. This setting was also used to develop the thermal-hydraulic limits of power versus flow.

5.

Main Steam Line Isolation Valve-Closure The low-pressure isolation of the main steamline trip was provided to give protection against rapid depressurization and resulting cooldown of the reactor vessel. Advantage was taken of the shutdown feature in the run mode which occurs when the main steam line isolation valves are closed, to provide for reactor shutdown so that high Jower operation at low pressures does not occur.

Thus. the combination of tle low-pressure isolation and isolation valve closure reactor trip with the mode switch in the Run position assures

-the availability of neutron flux protection over the entire range of the Safety Limits.

In addition, the isolation valve closure trip with the mode switch in the Run position anticipates the pressure and flux transients which occur during normal or inadvertent isolation valve closure.

6.

Main Steam Line Radiation - Hiah The Main Steam Line Radiation detectors are provided to detect a gross failure of the fuel cladding.

When the high radiation is detected, a scram-is initiated to reduce the continued failure of fuel cladding, At the same time the Main Steam Line Isolation Valves are closed to limit the release of fission products.

The trip setting is high enough above background radiation level to prevent spurious scrams yet low enough to promptly detect gross failures in the fuel cladding.

The Main Steam Line Radiation detectors setpoints may be adjusted prior to placing the hydrogen water chemistry (HWC) system in service.

If the I

setpoints are adjusted, the HWC system shall be placed in service or the setpoints shall be returned to the normal full power values within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

If the HWC system is not placed in service and the setpoints are not readjusted within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. control rod motion shall be suspended (except for scram or other emergency action) until the necessary adjustments are made.

Hydrogen injection may cause the radiation levels in the main steam lines to increase.

After shutting off the HWC system or decreasing power, the setpoints shall be returned to the normal full power values The Technical Specification wording was derived using the EPRI

" Guidelines for Permanent BWR Hydrogen Water Chemistry Installations. 1987 Revision" 7.

Drywell Pressure. Hiah High pressure in the drywell could indicate a break in the nuclear process systems. The reactor is tripped in order to minimize the possibility of fuel damage and reduce the amount of energy being added to the coolant.

The trip setting was selected as low as possible without causing spurious trips.

BRUNSWICK - UNIT 1 B 2-6 Amendment No.

~

REACTIVITY CONTROL SYSTEMS 3/4 1.4 ' CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER LIMITING CONDITION FOR OPERATION 3.1.4.1 The Rod Worth Minimizer (RWM) shall be OPERABLE when THERMAL POWER is less than 10% of RATED THERMAL POWER.

APPLICABILITY:

OPERATIONAL CONDITIONS 1 and 2*

ACTIQL{:

a.

With the RWM inoperable after the first 12 control rods have been fully withdrawn on a startup. operation may continue provided that control rod movement and compliance with the pr e ibed BPWS control rod pattern are verified by a second lic ^> sed operator or qualified member of the plant technical staff.

b.

With the RWM inoperable before the first 12 control rods are withdrawn on a startup, one startup per calender year may be performed provided that control rod movement and compliance with the prescribed BPWS control rod pattern are verified by a second licensed operator or qualified member of the plant technical staff.

c.

With RWM inoperable on a shutdown shutdown may continue arovided that control rod movement and com)liance with the prescri aed BPWS control rod pattern are verified )y a second licensed operator or qualified member of.the plant technical staff.

d.

With RWM operable but individual control rod (s) declared inoperable, operation and control rod movement below the preset I

power level of the RWM may continue provided:

1.

No more than three (3) control rods are declared inoperable in any one BPWS group and.

I 2.

The inoperable control rod (s) is bypassed on the RWM and control rod movement of the bypassed rod (s) is verified by a second licensed operator or qualified member of the plant l

technical staff.

e.

With RWM inoperable. the provisions of Specification 3.0.4 are not applicable.

Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpose of determining'the OPERABILITY of the RWM prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

BRUNSWICK - UNIT 1 3/4 1-14 Amendment No.

TABLE 4.3.4-1 (Continued) r CONTROL R0D WITHDRAWAL BLOCK INSTRUMENTATION SURVEILLANCE REQUIREMENTS

)

NOTES (a)

CHANNEL CALIBRATIONS are electronic.

f (b)

This calibration shall consist of the adjustment of the APRM flow biased setpoint to conform to a calibrated flow signal.

(c)

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, if not performed within the previous 7 days.

l (d)

When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2 if not performed within the previous 7 days.

(e)

Placement of Reactor Mode Switch into Startup/ Hot Standby position is permitted for the purpose of performing the required surveillance prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

(f)

Placement of Reactor Mode Switch into the Shutdown or Refuel position is permitted for the purpose of performing the required surveillance provided all control rods are fully inserted and the vessel head bolts are tensioned.

(g)

When THERMAL POWER is greater than the preset power level of the RWM.

l (h)

With any control rod withdrawn.

Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2.

(i)

When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, i

perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2. if not performed within the previous 92' days.

l

.)

BRUNSWICK - UNIT 1 3/4 3-52 Amendment No.

l rg_

TABLE 3.3.5.5-1 n

CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION Ep REQUIRED NUMBER APPLICABLE OF DETECTORS OPERATIONAL ALARM / TRIP FUNCTION PER TRIP SYSTEM CONDITIONS ACTION SETPOINT 1.

CHLORINE ISOLATION:

a.

Control Building Air 4 (a)

(b) 90 s 5 ppm Intake (Local) Trip System 1

g 2

b.

Chlorine Tank Car Area 4 (a)

(b) 90 s 5 ppm I

y (Remote) Trip System i

b 2.

RADIATION PROTECTION:

Control Building Air Intake 2

1.2.3.4 91 s 7mR/hr (d)

5. and (c) i 3.

CONTROL PAOM ENVELOPE SM0KE I

PROTECTION:

a.

Zone 4 2

1,2.3.4 92 NA

5. and (c) b.

Zone 5-2 1,2.3.4 92 NA

5. and (c)

.N 3

(a)

Four OPERABLE detectors per trip system. consisting of two detectors per trip subsystem.

(b)

With the chlorine tank car within the exclusion area.

(c)

During movement of irradiated fuel assemblies in the secondary containment.

(d)

- Allowable-value of s 10mR/hr

i I

TABLE 4.3.5.5-1 i

CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION SURVElLLANCE REQUIREMENTS CHANNEL CHANNEL FUNCTIONAL CHANNEL FUNCTION CHECK TEST CALIBRATION 1.

CHLORINE ISOLATION:

a.

Local NA M

A Detection Trip System b.

Remote NA M

A I

Detection Trip System

2. RADIATION PROTECTION:

Control Building D

M R

Air Intake

3. CONTROL ROOM ENVELOPE I

SM0KE PROTECTION:

a.

Zone 4 NA 6 months (a)

I b.

Zone 5 NA 6 months (a) l (a)

See Surveillance Requirement 4.7.2.d.2 i

L 1

' BRUNSWICK UNIT 1 3/4 3-64c Amendment No.

INS'TRUMENTATION 3/4.3.6 ATWS RECIRCULATION PUMP TRIP (RPT) SYSTEM INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.6.1 The ATWS-RPT system instrumentation trip systems shown in Table 3.3.6.1-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.6.1-2.

APPLICABILITY: OPERATIONAL CONDITION 1.

ACTION:

a.

With an ATWS-RPT system instrumentation trip setpoint less conservative than the value shown in the Allowable Values column of Table 3.3.6.1-2. declare the instrument channel inoperable until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value.

b.

With the number of OPERABLE channels one less than required by the Minimum OPERABLE Channels per Trip System requirement for one or both tri) systems. place the inoperable channel (s) in the tripped condition witlin one hour, c,

With the total number of OPERABLE channels less than 3 as required by the Minimum OPERABLE Channels per Trip System requirement for one trip system and:

1.

If the inoperable channels consist of one reactor vessel water level channel and one reactor vessel pressure channel, place both inoperable channels in the tripped conditiori within one hour.

2.

If the inoperable channels include two reactor vessel water level channels or two reactor vessel pressure channels, declare the trip system inoperable.

d.

With one trip system inoperable, restore the inoperable trip system to OPERABLE status within 14 days or be in at least STARTUP within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

e.

With both trip systems inoperable, restore at least one trip system.to OPERABLE status within one hour or be in at least STARTUP within the next 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.3.6.1.1 Each ATWS-RPT system instrumentation channel shall be demonstrated OPERABLE by the performance of the CHANNEL CHECK. CHANNEL FUNCTIONAL TEST. and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3.6.1-1.

I 4.3.6.1.2 LOGIC SYSTEM FUNCTIONAL TESTS and simulated automatic operation of all channels shall be performed at least once per 18 months and shall include calibration of time delay relays and timers necessary for proper functioning of the trip system.

BRUNSWICK - UNIT 1 3/4 3-88 Amendment No.

~

-REACTOR COOLANT SYSTEM 3/4.4.2 ' SAFETY / RELIEF VALVES LIMITING CONDITION FOR OPERATION 3.4.2 The safety valve function of all reactor coolant system safety / relief valves shall be OPERABLE with lift settings within 1% of the following values.*

I 4 Safety-relief valves @ 1105 psig.

4 Safety-relief valves @ 1115 psig.

3 Safety-relief valves @ 1125 psig.

APPLICABILITY:

OPERATIONAL CONDITIONS 1. 2, and 3.

ACTION:

a.

With the safety valve function of one safety / relief valve inoperable, restore the inoperable safety valve function of the valve to OPERABLE status within 31 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With the safety valve function of two safety / relief valves inoperable.

restore the ino)erable safety valve function of at least one of the valves to OPERA 3LE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following:

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c.

With the safety valve function of more than two safety / relief valves inoperable be in at least HOT SHUTDOWN within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD ~

SHUTDOWN wi'.hin the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.4.2 The safety valve function of each of the above required safety / relief valves shall be' demonstrated OPERABLE in accordance with the Surveillance Requirements of Specification 4.0.5.

The lift setting pressure shall correspond to ambient conditions of the valves at normal operating temperature and pressure.

i l

BRUNSWICK - UNIT 1 3/4 4-4 Amendment No.

j l

ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENT ADMINISTRATIVE CHANGES TYPED PAGES BRUNSWICK UNIT 2 TYPED TECHNICAL SPECIFICATION PAGES

TABLE 2.2.1-1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SETPOINTS

.E h

ALLOWABLE

$i FUNCTIONAL UNIT TRIP SETPOINT VALUES n^

1.

Intermediate Range Monitor. Neutron s 120 divisions of full scale s 120 divisions of y

Flux - High

  • full scale 2.

Average Power Range Monitor N

a.

Neutron Flux - High, 15%*

s 15% of RATED THERMAL POWER s 15% of RATED THERMAL POWER b.

Flow Biased Simulated Thermal s (0.66 W + 64%) with a maximum s (0.66 W + 67%) with Power - High "

s 113.5% of RATED THERMAL POWER a maximum s 115.5% of I RATED THERMAL POWER c.

Fixed Neutron Flux - High*

s 120% of RATED THERMAL POWER s 120% of RATED THERMAL POWER 3.

Reactor Vessel Steam Dome Pressure -

s 1045 psig s 1045 psig High y

A 4.

Reactor Vessel Water Level - Low, 2 +162.5 inches (')

2 +162.5 inches (S)

Level 1 5.

Main Steam Line Isolation Valve -

s 10% closed 5 10% closed Closure

  • 6.

Main Steam Line Radiation High" s 3 x full s 3.5 x full power power background background 7.

Drywell Pressure - High.

s 2 psig s 2 psig 8.

Scram Discharge Volume Water Level -

s 109 gallons s 109 gallons High

- i 9.

Turbine Stop Valve-Closure'"

s 10% closed s 10% closed N

<o 10.

Turbine Control Valve Fast. Closure, a 500 psig 2 500 psig i

[

Control Oil Pressure-Low ("

r o

1 a

\\-,,

-,ve

s. v

.w.~

w s

4 2.2 LIMITING SAFETY SYSTEM SETTINGS BASES 2.2.1 REACTOR PROTECTION SYSTEM INSTRUMENTATION SETPOINTS The Reactor Protection System Instrumentation Setpoints specified in Table 2.2.1-1 are the values at which the Reactor Trips are set for each parameter, i

The Trip Setpoints have been selected to ensure that the reactor core and reactor i

coolant system are prevented from exceeding their safety limits.

1.

Intermediate Ranae Monitor. Neutron Flux - Hiah The IRM system consists of 8 chambers, 4 in each of the reactor trip systems.

The IRM is a 5-decade, 10-range instrument.

The trip setpoint of 120 divisions is active in each of the 10 ranges. Thus, as the IRM is ranged up to accommodate the increase in power level, the trip setpoint is also ranged up.

Range 10 allows the IRM instruments to remain on scale at higher power levels to provide for additional overlap and also permits calibration at these higher l

powers.

The most significant source of reactivity change during the power increase is due to control rod withdrawal.

In order to ensure that the IRM provides the required protection, a range of rod withdrawal accidents have been analyzed in Section 7.5 of the FSAR. The most severe case involves an initial condition in 1

which the reactor is just subcritical and the IRMs are not yet on scale.

Additional conservatism was taken in this analysis by assuming the IRM channel closest to the rod being withdrawn is bypassed. The results of this analysis show that the reactor is shut down and peak )ower is limited to 1% of RATED THERMAL POWER, thus maintaining MCPR above tie Safety Limit MCPR of Specification 2.1.2.

Based on this analysis, the IRM provides protection against local control rod errors and continuous withdrawal of control rods in sequence and provides backup protection for the APRM.

2.

Averaae Power Range Monitor For operation at low 3ressure and low flow during STARTUP. the APRM scram setting of 15% of RATED THERMAL POWER 3rovides an adequate thermal margin between the setpoint and the Safety Limits. T1is margin accommodates the anticipated maneuvers associated with power plant startup.

Effects of increasing pressure at zero or low void content are minor: cold water from sources available during startup is not much colder than that already in the system, temperature coefficients are small and control rod patterns are constrained by the RWM.

Of I all' the possible sources of reactivity input, uniform control rod withdrawal is the most probable cause of significant power increase.

Because the flux distribution associated with uniform rod withdrawals does not involve high local peaks and because several rods must be moved to cnange power by a significant amount the rate of power rise is very slow.

Generally, the heat flux is in near equilibrium with the fission rate.

In an assumed uniform rod withdrawal aaproach to the trip level, the rate of power rise is not more than 5% of RATED THERMAL POWER per BRUNSWICK - UNIT 2 B 2-4 Amendment No.

a

-LIM'ITING SAFETY SYSTEM SETTING BASES (Continued) 7.

Drywell Pressure-High High pressure in the drywell could indicate a break in the nuclear process systems.

The reactor is tripped in order to minimize the possibility of fuel damage and reduce the amount of energy being added to the coolant.

The trip setting was selected as low as possible without causing spurious trips.

8.

Scram Discharae Volume Water Level-Hiqh The scram discharge tank receives the water displaced by the motion of the control rod drive pistons during a reactor scram.

Should this tank fill up to a point where there is insufficient volume to accept the displaced water. control rod movement would be hindered. The reactor is therefore tripped when the water level has reached a point high enough to indicate that it is indeed filling up, but the volume is still great enough to accommodate the water from the movement of the rods when they are tripped.

9.

Turbine Stoo Valve-Closure The turbine stop valve closure trip anticipates the pressure, neutron flux, and heat flux increases that would result from closure of the stop valves. With a trip setting of 10% of valve closure from full open, the resultant increase in heat flux is such that adequate thermal margins are maintained even during the.

worst case transient that assumes the turbine bypass valves remain closed.

This scram is bypassed when the turbine steam flow is below that corresponding to 30%

of RATED THERMAL POWER, as measured by the turbine first-stage pressure.

10.

Turbine Control Valve Fast Closure. Control Oil Pressure - Low Low turbine control valve hydraulic pressure will initiate the Select Rod Insert function and the preselected group of control rods will be fully inserted.

Select Rod Insert is an operational aid designed to insert a predetermined group of control rods immediately following either a generator load rejection, loss of turbine control valve hydraulic pressure, or by manual operator action using a switch on the R-T-G board.

The assignment of control rods to the Select Rod Insert function is based on the start-up and fuel warranty service associated with each control rod pattern, on RWM consideration.s. and on a dynamic function I

of both time and core patterns.

Approximately ten percent of the control rods in the reactor will be assigned to the Select Rod Insert function by the operator. This selection will be accomplished by moving the rod scram test switch for those rods from the Normal position to the Select Rod Insert position.

i BRUNSWICK - UNIT 2 B 2-7 Amendment No.

i LIMITING SAFETY SYSTEM SETTINGS BASES (Continued) 10.

Turbine Control Valve Fast Closure. Control Oil Pressure - Low (Continued)

Any rod selected for Select Rod Insert shall also have other rods in its BPWS' group selected to ensure that the RWM criteria is met when THERMAL POWER

< 10% of RATED THERMAL POWER.

It is possible that a rod pattern within these limits may occur after the Select Rod Insert function operates.

In order to reduce the number of reactor scrams, a 200 millisecond time i

delay, referenced from the low turbine control valve hydraulic pressure and Select Rod Insert signals. was incorporated to determine turbine bypass valve status via limit switches prior to initiating a reactor scram.

If thc turbine bypass valves opened in < 200 milliseconds, the reactor scram was bypassed.

It was found that during certain reload cycles the MCPR penalties involved with this i

time delay were more penalizing than the number of scrams saved: therefore, CP&L requested and received NRC approval to set this time at "0" in Amendment No. 14.

With the timer set at "0", Select Rod Insert and RPS trip will be initiated simultaneously.

The control valve closure time is approximately twice as long as that for the stop valves which means that resulting transients, while similar, are less severe than for stop valve closure.

No fuel damage occurs, and reactor' system pressure does not exceed the safety relief valve setpoint.. This is an anticipatory scram and results in reactor shutdown before any significant increase in pressure or neutron flux occurs.

Thi.s scram is bypassed when turbine steam flow is below that corresponding to 30 percent of RATED THERMAL POWER, as measured by turbine first-stage pressure.

i j

i BRUNSWICK - UNIT 2-B 2-8 Amendment No.

l REA'CTIVITY CONTROL SYSTEMS 3/4 1.4 CONTROL ROD PROGRAM CONTROLS ROD WORTH MINIMIZER LIMITING CONDITION FOR OPERATION 3.1.4.1 The Rod Worth Minimizer (RWM) shall be OPERABLE when THERMAL POWER is less than 10% of RATED THERMAL POWER.

i APPLICABILITY: OPERATIONAL CONDITIONS 1 and 2*

ACTION:

a.

With the RWM inoperable after the first 12 control rods have been fully withdrawn on a startup, operation may continue provided that controi red movement and compliance with the prescribed BPWS control rod pattern are verified by a second licensed operator or qualified member of the plant technical staff, b.

With the RWM inoperable before the first 12 control rods are withdrawn on a startup, one startup per calender year may be performed provided that control rod movement and compliance with the prescribed BPWS control rod pattern are verified by a second licensed 3

operator or qualified member of the plant technical staff.

3 c.

With RWM inoperable on a shutdown shutdown may continue 3rovided that control rod movement and comaliance with the prescri)ed BPWS i

control rod pattern are verified ay a second licensed operator or qualified member of the plant technical staff.

d.

With RWM operable but individual control rod (s) declared inoperable.

0)eration and control rod movement below the preset power-level of t1e RWM may continue provided:

1.

No more than three (3) control rods are declared inoperable in i

any one BPWS group and.

I 2.

The inoperable control rod (s) is bypassed on the RWM and control rod movement of the bypassed rod (s) is verified by a second licensed operator or qualified member of the plant technical staff.

1 e.

With RWM inoperable. the provisions of Specification 3.0.4 are not applicable Entry into OPERATIONAL CONDITION 2 and withdrawal of selected control rods is permitted for the purpose of determining the OPERABILITY of the RWM prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

I BRUNSWICK - UNIT 2 3/4 1-14 Amendment No.

~

TABLE 4.3.1-1 (Continued)

RfACTOR PROTECTION SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS NOTES (a)

Neutron detectors may be excluded from CHANNEL CALIBRATION.

(b)

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, if not performed within the previous 7 days.

(c)

The IRM channels shall be compared to the APRM channels and the SRM instruments for overlap during each startup, if not performed within the previous 7 days.

(d)

When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2.

perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2, if not performed within the previous 7 days.

(e)

This calibration shall consist of the adjustment of the APRM readout to conform to the power values calculated by a heat balance during OPERATIONAL CONDITION 1 when THERMAL POWER is greater than or equal to 25% of RATED l

THERMAL POWER.

(f)

This calibration shall consist of the adjustment of the APRM flow-biased setpoint to conform to a calibrated flow signal.

(g)

The LPRMs shall be calibrated at least once per effective full power month (EFPM) using the TIP system.

(h)

This calibration shall consist of a physical inspection and actuation.of these position switches.

(i)

Instrument alignment using a standard current source.

(j)

Calibration using a standard radiation source.

(k)

The transmitter channel check is satisfied by the trip unit channel check.

A separate transmitter check is not required.

(1)

Transmitters are exempted from the monthly channel calibration.

l (m)

Placement of Reactor Mode Switch into the Startup/ Hot Standby position is permitted for the purpose of performing the required surveillance prior to withdrawal of control rods for the purpose of bringing the reactor to criticality.

(n)

Placement of Reactor Mode Switch into the Shutdown or Refuel position is permitted for the purpose of performing the required surveillance provided all control rods are fully inserted and the vessel head bolts are j

tensioned.

~

]

(o)

Surveillance is not required when THERMAL POWER is less than 30% of RATED THERMAL POWER.

BRUNSWICK - UNIT 2 3/4 3-9 Amendment No.

b e

e

- -- --- - - ' - +

~

TABLE 4.3.4-1 (Continued)

CONTROL ROD WITHDRAWAL BLOCK INSTRUMENTATION SURVEILLANCE REOUIREMENTS NOTES (a)

CHANNEL CALIBRATIONS are electronic.

(b)

This calibration shall consist of the adjustment of the APRM flow biased setpoint to conform to a calibrated flow signal.

(c)

Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to startup, if not performed within the previous 7 days.

(d)

When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2, perform the required surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL CONDITION 2. if not performed within the previous 7 days.

(e)

Placement of Reactor Mode Switch into Startup/ Hot Standby position is permitted for the purpose of performing the required surveillance prior to withdrawal of control rods for the purpose of bringing the. reactor to criticality.

(f)

Placement of Reactor Mode Switch into the Shutdown or Refuel position is permitted for the purpose of performing the required surveillance provided all control rods are fully inserted and the vessel head bolts are tensioned.

(g)

When THERMAL POWER is greater than the preset power level of the RWM.

l (h)

With any control rod withdrawn.

Not applicable to control rods removed per Specification 3.9.10.1 or 3.9.10.2 (1)

When changing from OPERATIONAL CONDITION 1 to OPERATIONAL CONDITION 2.

perform the recuired surveillance within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering OPERATIONAL C0bDITION 2. if not performed within the previous 92 days.

s BRUNSWICK - UNIT 2 3/4 3-52 Amendment No.

~.

e m

ll TABLE 3.3.5.5-1 r,

CONTROL ROOM EMERGENCY VENTILATION SYSTEM INSTRUMENTATION

' 5E Q

no REQUIRED NUMBER APPLICABLE t

0F DETECTORS-OPERATIONAL ALARM / TRIP FUNCTION PER TRIP SYSTEM CONDITIONS ACTION SETPOINT 1.

CHLORINE ISOLATION:

a.

Control Room Air 4 (a)

(b) 90 s 5 ppm Intake (Local) Trip System b.

Chlorine Tank Car 4 (a)

(b) 90 s 5 ppm I

kf Area (Remote) Trip

]

System g

2.

RADIATION PROTECTION:

Control Room Air Intake 2

1. 2. 3. 4. 5. and 91 s 7mR/hr (d)

(c) 3.

CONTROL ROOM ENVELOPE SMOKE PROTECTION:

a.

Zone 4 2

1. 2. 3. 4, 5. and 92 NA (c) b.

Zone 5 2

1, 2. 3. 4. 5. and 92 NA I

(c) f (a)

Four OPERABLE detectors per trip system. consisting of two detectors per trip subsystem.

.!I (b)

With the chlorine tank car within the exclusion area.

A (c)

During movement of irradiated fuel assemblies in the secondary containment.

g-(d).

~ Allowable ~value of s 10mR/hr.

j

L TABLE 4.3.5.5-1 CONTROL ROOM EMERGENCY VENTILATION SYSTEM i

INSTRUMENTATION SURVEILLANCE REQUIREMENTS j

CHANNEL CHANNEL FUNCTIONAL CHANNEL FUNCTION CHECK TEST CALIBRATION 1.

CHLORINE ISOLATION:

a.

Local Detection NA M

A Trip System b.

Remote Detection NA M

A l

Trip System 2.

RADIATION PROTECTION:

Control Room Air Intake D

M R

3.

CONTROL ROOM ENVELOPE SMOKE i

PROTECTION:

a.

Zone 4 NA 6 months (a)

I b.

Zone 5 NA 6 months (a)

(a)

See Surveillance Requirement 4.7.2.d.2 BRUNSWICK - UNIT 2 3/4 3-64c Amendment No.

u-

INSTRUMENTATION END-0F-CYCLE RECIRCULATION PUMP 1 RIP SYSTEM INSTRUMENTATIOR LIMITING CONDITION FOR OPERATION 3.3.6.2 The end-of-cycle recirculation pump trip (EOC-RPT) system instrumentation channels shown in Table 3.3.6.2-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.6.2-2 and with the END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM RESPONSE TIME as shown in Table 3.3.6.2-3.

i APPLICABILITY:

OPEPATIONAL CONDITION 1 when THERMAL POWER is greater than or equal to 30% of RATED THERMAL POWER and the MCPR limits obtained from the COLR for ose witn Specification 3.2.2.1 require EOC-RPT.*

ACTION:

a.

With an end-of-cycle recirculation pump trip system instrumentation channel trip setpoint less conservative than the value shown in the Allowable Values Column of Table 3.3.6.2-2, declare the channel inoperable until the channel is restored to OPERABLE status with the channel setpoint adjusted consistent with the Trip Setpoint value.

b.

With the number of OPERABLE channels one less than required t'y the Minimum OPERABLE Channels per Trip System requirement for one or both trip systems, place the inoperable channel (s) in the tripped i

condition within one hour.

e c.

With the number of OPERABLE channels two or more less than required by the Minimum OPERABLE Channels per Trip System requirement for one trip system and:

1.

If the operable channels consist of one turbine control valve channel and one turbine stop valve channel, place both inoperable channels in the tripped condition within one hour.

j 2.

If the inoperable channels include two turbine control valve channels or two turbine stop valve channels, declare the trip system operable.

{

d.

With one trip system inoperable, restore the inoperable trip system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or take the ACTION required by Specification 3.2.2.1.

I-e.

With both trip systems inoperable, cehore at least one trip system to OPERABLE status within one hour or take the ACTION required by Specification 3.2.2.1.

I The provisions of Specification 3.0.4 are not applicable.

3 BRUNSWICK - UNIT 2 3/4 3-93 Amendment No.

^

REACTIVITY CONTROL SYSTEM BASES CONTROL ROD PROGRAM CONTROLS (Continued)

The RWM as a backup to procedural control provides an. automatic control rod pattern monitoring function to ensure adherence to the BPWS control movement sequences from 100% control rod density to 10% RATED THERMAL POWER and, thus, eliminates the postulated control rod drop accident from resulting in a peak fuel enthalpy greater than 280 cal /gm (Reference 6).

l The requirement that RWM be operable for the withdrawal of the first 12 control rods on a startup is to ensure that the RWM system maintains a high degree of availability.

1 Deviation from the BPWS control rod pattern may be allowed for the performance of Shutdown Margin Demonstration tests.

The analysis of the rod drop accident is presented in Section 15.4.6 of the Updated FSAR and the techniques of the analysis are presented in a topical report' (Reference 1) and two supplements (References 2 and 3).

The RBM is designed to automatically prevent fuel damage in the event of erroneous rod withdrawal from locations of high Jower density during high power i

operation.

The RBM is only required to be operaale when the limiting condition described in Specification 3.1.4.3 exists.

Two channels are provided.

Tripping one of the channels will block erroneous rod withdrawal soon enough to prevent fuel damage. This system backs u) the written sequence used by the operator for

+

withdrawal of control rods.

Furtler discussion of the RBM system is provided in Reference 5.

l 3/4.1.5 STANDBY LIOUID CONTROL SYSTEM The standby liquid control system provides a backup capability for maintaining the reactor subcritical in the event that insufficient rods are inserted in the core when a scram is called for. The volume and weight percent of poison material in solation is based on being able to bring the reactor to the subtritical condition as the plant cools to ambient condition.

The temaerature requirement is necessary to keep the sodium pentaborate in solution. C1ecking the volume and temperature once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> assures that the solution is available for use.

With redundant pumps and a highly reliable control rod scram system, operation-of tho reactor is permitted to continue for short periods of time with the system inoperable or for longer periods of time with one of the redundant components inoperable.

4 Surveillance requirements are established on a frequency that assures a high i

reliability of the system. Once the solution is established, boron concentration will not vary unless more boron or water is added, thus a check on the temperature and volume once each 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> assures that the solution is available for use.

Replacement of the explosive charges in the valves at regular intervals will assure that these valves will not fail because of deterioration of the charges.

BRUNSWICK - UNIT 2 B 3/4 1-4 Amendment No.

..