Form NEL-012, Semiannual Thermal Power Calibr Calculation Sheet
ML20070B523
Person / Time
Site: University of Utah
Issue date: 05/25/1988
From:
UTAH, UNIV. OF, SALT LAKE CITY, UT
To:
Shared Package
ML20070B459 List:
References
NEL-012, NEL-12, NUDOCS 9101310216
Download: ML20070B523 (1)


Text

.

..__ - ~ _. --

Form NEL 012 RSC Approval:5/2598 SEn5 ANNUAL THERMAL POWER CAUBRATION CALCULATION SHEET 1.

Water level before power run (rneasured from the top of the tar.k).

L=

cm 1

2.

Two sets of thermocouple readings taken before the power run.

TC#0 TC#1 TC#2 TC#3 Reading 1 T=

  • C Sum au readings and divide by 8.

t 3.

Time when power run was started (decimal hours) t=

i 4.

Power meter readingo during the run

% Pows =

Unear Power =

kW Log Power =

kW 5.

Time when the reactor was scrammed (decimal hours) 1" 2

6.

Water level aher power run L=

cm 2

7.

Two sets of thermocouple readings taken after the power run.

TC#0 TC#1 TC#2 TC#3 Reading 1 T=

  • C Sum au readings and divide by 8 2

8.

Vj = (731.52 L ) 4.2895 x Id Vj =

cm.

3 1

4 3

9.

Vj = (731.52 L ) 4.2895 x 10 V=

cm 2

2 M = V /(apoeirc volume at T )*

vt -

My =

grams 10.

t t

I M

  • V /(apoeircvolume at T )

V2 "

11.

M=

grams 2

2 2

2 12.

M Mj M2 3

13.

Oevap = (M)(2.003 x 10 ) 4 (4.184)(M)(T T ).

O, yap =

Joules 2I cap"(M T ' MjT )(4.184)

O 14.

O 21 1

cap =

}oulos 3

time = (1

  • 1 )(3.6 x 10 )

time =

sec 15.

2 1 16.

Power = (Ocap + Owap)/ time Power =

kW 17.

Power meter caibration required 7 (if yes, use Form NEL-013.)

18.'

Attach datalogger output if used.

I 19.

Date power calibration completed:

20.

Senior Operator signature:

  • Interpolate from table on back side of calculation sheet.

l l

Form approved by Reactor Safety Committee:

R8 actor Administrator:

M F

Dab: May 25.128 e-s 9101310216 880831 PDR ADOCK 05000407 Q

PDR

.. _, - - _....