Form NEL 012 RSC Approval:5/2598 SEn5 ANNUAL THERMAL POWER CAUBRATION CALCULATION SHEET 1.
Water level before power run (rneasured from the top of the tar.k).
L=
cm 1
2.
Two sets of thermocouple readings taken before the power run.
TC#0 TC#1 TC#2 TC#3 Reading 1 T=
- C Sum au readings and divide by 8.
t 3.
Time when power run was started (decimal hours) t=
i 4.
Power meter readingo during the run
% Pows =
Unear Power =
kW Log Power =
kW 5.
Time when the reactor was scrammed (decimal hours) 1" 2
6.
Water level aher power run L=
cm 2
7.
Two sets of thermocouple readings taken after the power run.
TC#0 TC#1 TC#2 TC#3 Reading 1 T=
- C Sum au readings and divide by 8 2
8.
Vj = (731.52 L ) 4.2895 x Id Vj =
cm.
3 1
4 3
9.
Vj = (731.52 L ) 4.2895 x 10 V=
cm 2
2 M = V /(apoeirc volume at T )*
vt -
My =
grams 10.
t t
I M
- V /(apoeircvolume at T )
V2 "
11.
M=
grams 2
2 2
2 12.
M Mj M2 3
13.
Oevap = (M)(2.003 x 10 ) 4 (4.184)(M)(T T ).
O, yap =
Joules 2I cap"(M T ' MjT )(4.184)
O 14.
O 21 1
cap =
}oulos 3
time = (1
- 1 )(3.6 x 10 )
time =
sec 15.
2 1 16.
Power = (Ocap + Owap)/ time Power =
kW 17.
Power meter caibration required 7 (if yes, use Form NEL-013.)
18.'
Attach datalogger output if used.
I 19.
Date power calibration completed:
20.
Senior Operator signature:
- Interpolate from table on back side of calculation sheet.
l l
Form approved by Reactor Safety Committee:
R8 actor Administrator:
M F
Dab: May 25.128 e-s 9101310216 880831 PDR ADOCK 05000407 Q