MONTHYEARML20155F5281998-11-0202 November 1998 Proposed Tech Specs 5.3.3,changing Word Biennual to Annually & 5.4,changing Language to Indicate Particulate Collection Is Done in Exhaust Stack ML20107H1181996-03-29029 March 1996 Univ of UT Ctr for Excellence in Nuclear Technology Engineering & Research Reactor Operation Requalification Plan ML20117D9191996-02-28028 February 1996 Editorial Changes to Reactor Operator Requalification Plan ML20101L4591996-02-28028 February 1996 University of Utah Center for Excellence in Nuclear Technology Engineering & Research Reactor Operator Requalification Plan ML20101L4681996-02-28028 February 1996 University of Utah Center for Excellence in Nuclear Technology Engineering & Research Audit & Review Plan ML20063M1931994-03-0101 March 1994 Rev 1 to Univ of Utah Nuclear Engineering Lab Reactor Operation Requalification Plan ML20101F9871992-05-20020 May 1992 Proposed Tech Specs Re Visual Insp of Fuel Elements for Damage or Deterioration ML20070B4981988-07-27027 July 1988 Form NEL-004 Sheets 1 & 2, Procedure for Biennial Fuel Rod Insp ML20070B5301988-07-27027 July 1988 Form NEL-016, Nuclear Engineering Lab Agreement for Off- Hours Access ML20070B5341988-07-27027 July 1988 Form NEL-019, Univ of Utah Nuclear Engineering Lab Maint Log ML20070B5211988-05-25025 May 1988 Form NEL-011 Sheets 1 & 2, Semiannual Thermocouple Calibr Procedure ML20070B5191988-05-25025 May 1988 Form NEL-009 Sheets 1 & 2, Heavy Water Reflector Element & Tank Insp Procedure ML20070B5161988-05-25025 May 1988 Form NEL-008, Procedure for Adding Water to Reactor Tank ML20070B5091988-05-25025 May 1988 Form NEL-007, Procedure to Change Central Irradiator ML20070B5041988-05-25025 May 1988 Form NEL-006, Procedure for Changing Filters in Water Demineralizer Circuit ML20070B5011988-05-25025 May 1988 Form NEL-005, Approach to Critical Procedure ML20070B4961988-05-25025 May 1988 Form NEL-003 Sheets 1 & 2, Procedure for Semiannual Control Rod Worth Determination ML20070B4881988-05-25025 May 1988 Form NEL-002,Sheets 1 & 2, Biennel Control Rod Insp ML20070B5231988-05-25025 May 1988 Form NEL-012, Semiannual Thermal Power Calibr Calculation Sheet ML20070B5271988-05-25025 May 1988 Form NEL-014 Sheet 1 & 2, Control Rod Movement or Repair Procedure ML20023D1931983-05-12012 May 1983 Proposed Tech Specs & Bases for Triga Reactor 1998-11-02
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20107H1181996-03-29029 March 1996 Univ of UT Ctr for Excellence in Nuclear Technology Engineering & Research Reactor Operation Requalification Plan ML20117D9191996-02-28028 February 1996 Editorial Changes to Reactor Operator Requalification Plan ML20101L4591996-02-28028 February 1996 University of Utah Center for Excellence in Nuclear Technology Engineering & Research Reactor Operator Requalification Plan ML20101L4681996-02-28028 February 1996 University of Utah Center for Excellence in Nuclear Technology Engineering & Research Audit & Review Plan ML20063M1931994-03-0101 March 1994 Rev 1 to Univ of Utah Nuclear Engineering Lab Reactor Operation Requalification Plan ML20070B5341988-07-27027 July 1988 Form NEL-019, Univ of Utah Nuclear Engineering Lab Maint Log ML20070B4981988-07-27027 July 1988 Form NEL-004 Sheets 1 & 2, Procedure for Biennial Fuel Rod Insp ML20070B5301988-07-27027 July 1988 Form NEL-016, Nuclear Engineering Lab Agreement for Off- Hours Access ML20070B5161988-05-25025 May 1988 Form NEL-008, Procedure for Adding Water to Reactor Tank ML20070B5091988-05-25025 May 1988 Form NEL-007, Procedure to Change Central Irradiator ML20070B5041988-05-25025 May 1988 Form NEL-006, Procedure for Changing Filters in Water Demineralizer Circuit ML20070B5011988-05-25025 May 1988 Form NEL-005, Approach to Critical Procedure ML20070B5191988-05-25025 May 1988 Form NEL-009 Sheets 1 & 2, Heavy Water Reflector Element & Tank Insp Procedure ML20070B4961988-05-25025 May 1988 Form NEL-003 Sheets 1 & 2, Procedure for Semiannual Control Rod Worth Determination ML20070B4881988-05-25025 May 1988 Form NEL-002,Sheets 1 & 2, Biennel Control Rod Insp ML20070B5211988-05-25025 May 1988 Form NEL-011 Sheets 1 & 2, Semiannual Thermocouple Calibr Procedure ML20070B5231988-05-25025 May 1988 Form NEL-012, Semiannual Thermal Power Calibr Calculation Sheet ML20070B5271988-05-25025 May 1988 Form NEL-014 Sheet 1 & 2, Control Rod Movement or Repair Procedure 1996-03-29
[Table view] |
Text
- _ -_ _ _ _ _ _ . . _ . . _ . _ _ _ - . . . _ . _ . _ _ . _ _ _ _ _ _ . _
. .. Form NEL 009 sheet 1 Rsc Approvat: s7s48 Heavy Water Reflector Element and Tank inspection Procedure Objective: To assure the proper procedure is followed for the removal, I inspection, venting, and reassembly of heavy water reflector vessels in the reactor during the biennial core inspections and at other times as necessary.
Procedure:
- 1. Check out the reactor and withdraw the safety rod but do not go to power. Maintain an operator at the console at all times during !vbich a positive reactivity insertion may occur.
- 2. If3 not art ofcone previously (i.e., ions), remove two fuel elements fromif this the blennialinspect
- he B hexagonal ring worth a $2.50, see Kimura, p. 71 place in storage dunn inspection. Record movement in; and Operations Log and b low.
Preplanned Fuel Movement Sequence Element No. Position From: Position To:
1-2-
- 3. Remove the heavy water (D 0) retlecting elements from core and tank storage rack ocations.2 Survey eac1 element upon removal from the reactor tank and record the maximum radiation levelin Operations Log. For each element, unscrew the drain 31ug at the top of the element to vent into the hood in Room 1205 2 any generated gases and check the level of DgO within the element.
Add makeup D O lf the levelis less than two inches from the top of the element.2 Observe the condition of the cladding and measure using call)ers the diameter of the element at each position shown on uhe Blennial Heavy Water inspection Sheet appropriate insp)ection sheet.(Form NEL-010 . Record the inspection fo
- 4. Return each inspected element to its original position in the core or storage tack and record in the Operations Log.
- 5. Remove the dry tube irradiation canister from the D2O trapezoldal tank and secure to the side of the reactor tank or remove from the reactor tank as necessary for inspection of the polyethylene tubing. Survey the dry tube canister upon removal from reactor tank and record maximum radiation levels below:
, mR/hr at one foot mR/hr on contact Replace the polyethylene tubing section Immediately next to the l'
[o bC 'k7
, ,, Form NEL o09 Sheet 2 Rsc Ar$wov:1 STsS8 canister if radiation damage (embrittlement) is observed. Record actions in Operations Log.
- 6. Remove trapezoidal D 2O reflector tank from core and reactor tank usin0 the special gras aing tool attached to rope. Survey the tank upon removal for max mum radiation levels and record below.
Prepare standard radiation tag and attach to tank with the readings indicated on the tag, mR/hr at one foot mR/hr on contact Observe the condition of the surface of tank for corrosion or any abnormal appearance. Vent the tank into the hood in MEB 1205 F by removing the filling scrow. Chock the lovel of D2O inside the tank and add makeup D2 O if necessary Record inspection in Operations Log. If necessary or as directed by Reactor Supervisor, take 1cc sample of D2O for tritium monitoring by liquid scintillation counting. Indicato reading here:
pCl/ml(tritium). Compare to 10CFR20 appendix B, Tablo I/ water): 0.1 pCl/ml.
- 7. Return the D 2O tank to its original core position and record in Operations Log.
- 8. Replace the dry tubo canister in D2O tank and Jocure tho top of s the tube to the supporting beam across the top of the TRIGA tank.
Record in Operations Log.
- 9. Date inspection completed:
~~
10.Sonior Reactor Operator:
Form approvod by Reactor Safety committoe:
Reactor Administrator /MN / # ato: May 25.1988