Fonn NEL.002 Sheet 1 RSC Approval:925/B8 Biennial Control Rod Inspection ObjectNo:

To assure 'he control rods are capable of performing their function property, the following inspections and tests ' 5 be performed on a blennial schedule. This praxedure will satisfy Tech % : Specification 4.2.c. Bocause of the time required to complete all tests, the proceoute may be extended over several days.

Procedure:

1.

Check out the reactor using TRIGA Preliminary Chock Sheet (Form NEL 001 B.1).

2.

Withdraw the safety rod to its fuity cocked position.

3.

A licensod reactor operator will remain at the console du ing all fuel movement and rod removal involving positka reactivity insertions.

4.

Remove fuel elements from selected rings which have total reactivh v/ orth 3

equal to or greater than the total reactkity worth of all control rods combined.

List the order of removal and storage position. Record movement completion times in the Operations Log book.

Preolannod Movement Scouence Fue! Element Storace Pos! tion ReactMtv Worth' 1.

2.

3..

4.

5.

6.

7, 8.

g, 10.

Total worth of fuel removed Total worth of control rods Difference (> $0.50)**

S.

Insert cadmium plug into centralirradiator.

6.

Insert safety rod.

7.

Remove regulating rod and inspect for deterioration and oporability. (Since rod may exhbit high radiation levels this inspection may be performed under water by leaving the rods submerged for radiation protection.)

8.

Replaco regulating rod.

g.

Ropoat steps 7 and 8 for the safety and shim-safety rods, respectNely.

Regulating Rod Condition:

Shim Rod Condition:

Safety Rod Condition:

10. Test all drives for operability, bob 50 $$882),

PDR

s Form NEL 002 Sheet 2 RSC Approval: F2546 0

11. Withdraw safety rod to fup cocked position.

y

12. Replace fuelin reverse order of stop 4.
13. Remove cadmium plug.

I 14, insert safety rod, j

15. Check out the reactor using TRIGA PRELIMINARY CHECK SHEET (Form NEL 001 B.1).
16. Perform rod worth calibrations using rod drop procedure (Form NEL-003).

Bai 300Elba Previous Worth Safety Shlm Safety Regulating.

Shutdown Margin

(> $.50)"

Excess. Reactivity

(< $2.80)*"

8These should be approximately equal to the worth measurements made prior to L

the rod checks. Date of previous worth measurement:

' (Kimura p. 71)

" Required by Technical Specircations 3.2(1)

"* Required by Technical Specircations 3.2(4)

17. Dateinspection started:
18. Date Inspection completed:

ig.' SeniorOperatorsignature:

i

..~.-~~....,.....m_.

. Form approved by Reactor Safety Committee:

' Reactor Administrator:-

b de Date: May 25.1988