e i
I 4
DISTRIBUTION
~
~
IE Files Docket Files
~
'~
SSIRS 9124 IE Rdg Files it.AR 2 41981 EJGallagher Rdg Files RRRI Rdg Files RED Rdg Files REMORANCW1 FOR:
T. T. Martin, Acting Director, Division of Engineering and Technical Inspection. Region I FRCM:
E. L. Jordan, Deputy Director. Division of Resident and Regional Reactor Inspection, IE
SUBJECT:
LIMERICK UNIT 1. DN 50-352 POST TENSIONING OF FUEL POOL GIRDERS (AITS H07003150H07)
REFERENCES:
(1) Hano R. T. Carlson to E. L. Jordan, dated February 6 1931.
(2) Hemo R. T. Carlson to G. W. Reitmuth, dated June 7.1979.
l (3) Letter Philadelphia Electric Co. (PEco) to 8. Grier, dated May 31, 1979 with Attachments.
(4)HRCInspectionReport 50-352/79-01; 50-353/79-01 dated Harch 5,1979 (unresolved item 352/79-01-02).
References (1) and (2) transmitted for our review and evaluation a response frota Philadelphia Electric Co. (reference 3) regarding an inspection report unrcsolved ites (reference 4) identified during post-tensiontag the fuel pool cfrders at Limerick Unit 1 Station. The ites identified the need f;r qualification tests addressing slippage of the wedge anchors during pr2 stressing and the use of a monostrand jack to recover the prestress 1 css due to slippage.
We have reviewed the sutaittal by PEco which includes an engineering evaluation perfsrmed by Bechtel and results of VSL Corporation's qualiffcation tests of the post-tensioning systen caterials and field procedures. The results of our review are:
1 1.
The qualification tests conducted by YSL verify that the capacity of j
the anchorage systen is capable of meeting design requirements.
2.
Variations in prescating the wedge anchors and the use of a monostrand ram should not affect the applicability of the qualification tests.
3.
The evaluations performed by PECo Bechtel and VSL adequately address the identified unresolved item.
CONTACT:
E. J. Gallagher IE p
49-28180 g
V[O Aus 4
i) f
4 s
MR,2 4 1981 T. T. P.artin 2
Tha results of our review have been discussed with A. Yarala and he agrees' that the unresolved item can be closed.
Edward L. Jordan. Deputy Director Division of Resident and Regional Reactor Inspection. IE cc:
J. Sniezek. IE R. Woodruff. IE -
H. Wong. IE R. Carlsen. RI L. Tripp._RI A. Yarela. RI J. Durr. Res Insp C. Murphy. RII R. Spessard. RIII
~
W. Seidle. RIY H. Book. RY A,.
. 7..
}
l l
l l
l IE:RES IE: REB IE:RRRI:DD EJGallagher:mkm PWoodruff ILJordan