Eia Supporting Request for Extension of Dates for Completion of Const of Units,Extending Unit 1 to 870430 & Unit 2 to 880430ML20063N644 |
Person / Time |
---|
Site: |
Braidwood |
---|
Issue date: |
09/30/1982 |
---|
From: |
COMMONWEALTH EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20063N642 |
List: |
---|
References |
---|
5070N, NUDOCS 8210050077 |
Download: ML20063N644 (2) |
|
|
---|
Category:ENVIRONMENTAL IMPACT APPRAISALS
MONTHYEARML20059A7191993-12-23023 December 1993 EAP Supporting Proposed Amends to Revise Limitations on Radioactive Materials Released in Liquid & Gaseous Effluents & Revise 10CFR20 to Recognize New Section Numbers ML20205F1261985-10-21021 October 1985 Environ Assessment & Finding of No Significant Impact Supporting Schedular Exemption from Portion of GDC 4 Requirements of 10CFR50,App a ML20063N6441982-09-30030 September 1982 Eia Supporting Request for Extension of Dates for Completion of Const of Units,Extending Unit 1 to 870430 & Unit 2 to 880430 1993-12-23
[Table view] Category:TEXT-ENVIRONMENTAL REPORTS
MONTHYEARML20206N8061998-12-31031 December 1998 1998 Annual Radiological Environ Operating Rept for Braidwood Station ML20206B0321998-12-31031 December 1998 Reg Guide 1.16 Rept for Number of Personnel & Person-Rem by Work & Job Function for 1998 ML20210H9981998-12-31031 December 1998 Errata to 1998 Radioactive Effluent Release Rept ML20203K7251997-12-31031 December 1997 1997 Occupational Radiation Exposures, for Dresden,Zion, Lasalle,Byron & Braidwood Plant ML20217P1551997-12-31031 December 1997 Annual Radiological Environ Operating Rept for 1997 ML20217M1061997-12-31031 December 1997 Annual Environ Operating Rept for Braidwood Nuclear Power Station for 1997 ML20141A7341996-12-31031 December 1996 Errata to Bs Annual Effluent Rept for 1996 Liquid Releases ML20148A6721996-12-31031 December 1996 Recorded Annual TEDE Exposure for CY96 for Braidwood,Byron, Dresden,Lasalle,Quad Cities & Zion ML20117C6601996-08-19019 August 1996 Maximum Doses Resulting from Aquatic Effluents Period of Release 940101-941231 Calculated 960819 Adult Receptor ML20106G4941995-12-31031 December 1995 Annual Effluent Rept for 1995 ML20107H2091995-12-31031 December 1995 Annual Radiological Environmental Operating Rept for 1995 ML20117D0611995-12-31031 December 1995 Unit One Maximum Doses Resulting from Aquatic Effluents Period of Release 950101-1231 ML20087J2131994-12-31031 December 1994 1994 Annual Environ Operating Rept for Period from 940101-1231 ML20082P4571994-12-31031 December 1994 Annual Radiological Environ Operating Rept,1994 ML20092L2831994-12-31031 December 1994 Errata to Semi-Annual Effluent Rept,For Jan-Dec 1994 ML20072M7851994-06-30030 June 1994 Semiannual Effluent Rept for Jan-June 1994 ML20070N7491993-12-31031 December 1993 1993 Annual Environ Operating Rept for Braidwood Nuclear Power Station ML20073J9341993-12-31031 December 1993 Semi-Annual Effluent Rept for July-Dec 1993 ML20059A7191993-12-23023 December 1993 EAP Supporting Proposed Amends to Revise Limitations on Radioactive Materials Released in Liquid & Gaseous Effluents & Revise 10CFR20 to Recognize New Section Numbers ML20056G5111993-06-30030 June 1993 Semiannual Effluent Rept for Jan-June 1993 ML20044F5871992-12-31031 December 1992 Part 3 to Braidwood Station,Units 1 & 2 Annual Radiological Environ Operating Rept,1992. W/930413 Ltr ML20090A6551991-12-31031 December 1991 Wind Speed & Wind Direction for Oct Through Dec 1991 ML20090E4181991-12-31031 December 1991 1991 Occupational Radiation Exposures for Braidwood Nuclear Power Station ML20090A6471991-12-31031 December 1991 Wind Speed & Wind Direction for Jan Through Dec 1991 ML20095J9441991-12-31031 December 1991 Annual Radiological Environ Operating Rept for 1991. W/ ML20101R8971991-12-31031 December 1991 Errata to 1991 Braidwood Annual Environmental Operating Rept ML20090A6621991-09-30030 September 1991 Wind Speed & Wind Direction for Jul Through Sept 1991 ML20073B9641991-04-19019 April 1991 Annual Environ Operating Rept for 1990 ML20101R8871990-12-31031 December 1990 Errata to 1990 Braidwood Annual Environmental Operating Rept ML20073D0891990-12-31031 December 1990 Annual Radiological Environ Operating Rept 1990,Part 3, Containing Results of Radiological Environ & Meteorological Monitoring Programs ML20066J5431990-12-31031 December 1990 1990 Occupational Radiation Exposures, Consisting of Number of Personnel & person-rem by Work & Job Function.W/ ML20070V8451990-06-30030 June 1990 Corrected Semiannual Effluent Rept for Jan-June 1990 ML20059A7641990-06-30030 June 1990 Radioactive Effluent Rept for Jan-June 1990 for Braidwood Nuclear Power Station ML20085M4721990-01-31031 January 1990 Results of Entrainment & Impingement Studies Conducted at Braidwood Nuclear Generating Station & Adjacent Kankakee River ML20006E9421989-12-31031 December 1989 Semiannual Effluent Rept for Jul to Dec 1989. W/900214 Ltr ML20042E8301989-12-31031 December 1989 Annual Environ Radiological Operating Rept for 1989. W/900328 Ltr ML20085M4651989-08-31031 August 1989 Aquatic Ecology Technical Rept 90/1, Kankakee River Fishes of Braidwood Aquatic Monitoring Area,Jul-Aug 1989 ML20246E6791989-06-30030 June 1989 Semiannual Effluent Rept for Jan-June 1989 ML20245F6661989-04-28028 April 1989 Annual Environ Operating Rept for 1988,including List of All Changes in Station Design & List of All Nonroutine Repts ML20245A9221988-12-31031 December 1988 Errata to Semiannual Effluent Rept for Jul-Dec 1988. W/ ML20245J0061988-12-31031 December 1988 Semiannual Effluent Rept for Jul-Dec 1988 ML20235Y6421988-12-31031 December 1988 Occupational Personnel Radiation Doses Rept for 1988 ML19332F5291988-12-31031 December 1988 Environ Radiological Monitoring Program for Braidwood Station for 1988. ML20205A5481988-06-30030 June 1988 Errata Data to Semiannual Effluent Rept for Jan-June 1988 ML20153C7661987-12-31031 December 1987 Radioactive Waste & Environ Monitoring Annual Rept 1987 ML20150B3231987-12-31031 December 1987 Semiannual Effluent Rept for Jul-Dec 1987 ML19332F5281987-12-31031 December 1987 Environmental Radiological Monitoring Program for Braidwood Station for 1987. ML20236Y3401987-06-30030 June 1987 Errata to Semiannual Effluent Rept for May-June 1987, Including Vent Stack Releases & Liquid Effluents ML20236X9121986-12-31031 December 1986 Environ Radiological Monitoring for Braidwood Nuclear Power Station Commonwealth Edison Co Annual Rept 1986 ML20214D8151986-12-31031 December 1986 Annual Environ Operating Rept for facility,861017-1231.W/ 1998-12-31
[Table view] |
Text
'
i Environmental Impact Appraisal Supporting the Request for Extension of the Dates for Completion of Construction of Braidwood Station Units 1 and 2 l
- 1. Description or Proposed Action l The action requested is the issuance of an ORDER pertaining to Braidwood Station Units 1 and 2. The ORDER would extend the latest completion date of Unit 1 by 54 months and the latest completion date of Unit 2 by 54 months.
- 2. Summary Description of the Probable Impacts o f the Proposed Action 3 The environmental impacts associated with construction of Braidwood have been previously addressed in the NRC staff's final environmental statement, construction permit stage (FES-CP) issued July, 1974 and determined by the Atomic Safety and Licensing Board in their Partial Initial Decision - Environmental and Site Suitability Matters dated January 8, 1975.
The Atomic Safety and Licensing Board identified in the Initial Decision the following major effects due to construction:
A. Approximately 734 acres of agricultural land, 848 acres of woods and fallow field, and 2838 acres of strip mine will be required for the station and the cooling lake.
B. Eleven farm residences will be displaced. Farming on part of the site will be suspended.
C. Traf fic on local roads will increase because o f construction and commuting activities.
D. Approximately 2376 acres o f transmission line right-o f-way will occupy land used primarily for agriculture and also some wooded land. Approximately ten acres will be used for tower bases; the remainder of the farmlands can remain in use.
E. Minor and temporary impacts to the biota of the station area "iver bank will result from construction activities.
With respect to Item A, extending the construction permit would have no effect on the major portion of the land which is used for the permanent plant facilities and the cooling pond. It would delay the return to agriculture or a natural state of approximately 110 acres which are temporarily disturbed by construction related activities.
The impact of resident displacement identified in Item B has already occurred. The farm buildings have been razed and the former f armland
, on the site that is not presently utilized for station construction has
- been seeded to a naturalizing cover. Construction in the pipeline corridor has been completed and farming has been resumed in those areas where it was temporarily suspended during construction. Therefore, the construction permit extension will not add impacts in these areas.
8210050077 820930 PDR ADOCK 05000456 A PDR
- With respect to Item C, construction truck traffic has peaked and is declining. The effects of commuter traf fic will be extended. Commu te r related traffic is not expected to increase substantially from its present level. The effect of any increase in commuter traffic will not be significant, however, because of the access to Interstate Highway 55 and nearby communities via Illinois Highways 53,113, and 129.
The acreages in Item D have been reduced by revisions to the original transmission plan. The total transmission right-of-way consists of 2100 acres. Less land will be committed to tower bases due to the selection of single shaf t structures for tangent and light angles (up to 130) rather than the wide based lattice steel towers specified in the original environmental report, thus reducing the impact on farming" activities. The Braidwood to Davis Creek TSS portion of the transmission line is completed. Construction of the remainder from Davis Creek TSS to Crete TSS will begin in 1984. The extension o f the construction schedule will delay the minor impacts of construction discussed in the Atomic Safety and Licensing Board's Initial Decision.
With respect to Item E construction of the river intake and blowdown structures has been completed. Care was taken during construction to minimize the impacts on the river bank and in _the river. The removal of trees was kept to a minimum and landscaping plans specify the replanting of trees and shrubs at both structures. The aquatic monitoring program which was conducted during and after the construction period found the impacts to be localized with no permanent effects attributable to the construction work 'in the river. No further construction related impacts to the river bank or the river are expected.
- 3. Conclusion and Basis for Finding of No Significant Impact On the basis of the above, it is our opinion that there will be no significant impacts attributable to the requested action.