1 e.
Commonwralth faiwn Gimpany l
Ilraidwaxxl Generating Station Route *I. Ikix 81 liramille II,601079619.
Tel MI5-4582801 April 20,1995 BW/95-0053 i
Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Russeil:
Subject:
Aamual Environmental Operation report for Facility License NPT-72 & 77 Braidwood Nuclear Power Station Docket Nos. 50-456 and 50-457 Attached you will find the Annual Environmental Operating Report as required by the Technical Specifications, Appendix B, Section 5.4 for Facility License NPF-72 and NPR-77. The period of the report is from January 1,1994 to December 31,1994. The report was reviewed against the objectives of the Environmental Protection Plan as stated in Section 1 of Appendix B to Braidwood's Operating License and it has been determined that these objectives are being met.
The report is contained in the following Attachraents:
Attachment A -
A list of all changes in Station design or operations, tests, and experiments as required by Appendix B, Section 3.1.
Attachment B -
A list of all non routine reports as required by Appendix B, Section 5.4.2.
Attachment C -
A list of non-compliances to the Environmental Protection Pir.n and the corrective actions.
If you or your stalT have any questions or comments concerning this report, please refer them to Kevin Bartes, Braidwood Regulatory Assurance Supervisor, at (815) 458-2801, extension 2980.
Yours truly, Tulon tation Manager Braidwood Nuclear Station TJT/JML/dia Attachments l
cc: J. B. Martin, NRC Regional Administrator, Region III R.R. Assa, Project Manager, NRR S.G. Du Pont, Senior Resident Inspector 9505090036 941231
[l PDR ADOCK 05000456
/ /})
R PDR
/
\\
A t!mcom Gimpany
~
l
..e.
1 k
ATTACHMENT A List of changes in Station design, operation, tests and experiments made in accordance with Section 3.1 which involved a potentially significant unreviewed environmental question.
None - 1994 t-l s
1 ATTACIEMENT B List of non-routine reports submitted in accordance with Subsections 5.4.2.
None - 1994
\\
?
]
l
i ATTACIIMENT C i
List of Environmental Protection Plan non-compliances and corrective actions.
I None - 1994