Enclosurs to LD-82-076

~

Long Term Iodine Control In Reactor Containment Buildings Using Combustion Engineering Iodine Removal System August, 1982 Combustion Engineering, Inc.

l i

. 8208240354 820819 1 PDR ADOCK 05000470 i E PDR

TABLE OF CONTENTS Section Item Pages I Introduction General Information on Long-Term Iodine Control ... 1-2 II Interface Requirements Revisions for CESSAR Appendix A and B of Chapter 6 ........... . 3-5 III Iodine Removal System Operational Requirements and Human Factors Considerations . . . . . . . . . . . . . 5 - 10 IV Chemistry Summary of Hydrazine Concentrations and Interactions with Iodine in Containment . . . . . . 11 - 13 V Summary of Radiolysis Experiments of Iodine Solutions 13 - 15 i

l VI Summary of Iodine Releases from Recent Power Plant Events . . . . . . . . . . . . . . . . . . . . . . 16 - 20 4

1 ii

~

I. Introduction - General Information on Long-Term Iodine Control Confirmatory Item 12 of the CESSAR-F Safety Evaluation Report addresses i the adequt.cy of the C-E supplied Iodine Removal System (IRS) to provide long term iodine control inside the containment building. The IRS design was challenged by the staff on the basis of the post-accident sump water i range over which the hydrazine chemistry effectively retains the iodine in solution. Related concerns were raised regarding scenarios of iodine release to the containment atmosphere which would not be affected by sump water pH and which were applicable to containment spray systems in general. The conclusions drawn in this report are: first, that the chemistry of the hydrazine IRS is such that evolution of iodine from the containment sump is not substantial within the required pH range, and secondly, following the initial iodine release, the IRS can be operated according to a scheme which will enhance long term iodine control.

This package provides a discussion of long term iodine control for the CESSAR IRS. Section II provides the recommended changes to CESSAR that will strengthen the previous interface requirements for periodic operation of the system. This will provide control of any long term, delayed releases in containment or long term re-evolution of iodine due to plateout on containment surfaces.Section III discusses operational requirements for the IRS for both short term and long term system operations. This also describes how the system can be manually operated from the control room. Therefore, the operator should not be burdened by periodically Section IV, V, and VI operating the system for long term iodine control.

provide results of analyses to describe the effects of the containment environment on hydrazine concentrations. Also discussed are the results l of experiments performed using hydrazine.

i In the course of addressing NRC concerns on long-term iodine control, i

certain points were made on the merits of restarting the IRS for long-term iodine control in the containment atmosphere.

The merits of re-initiating i

the containment sprays are discussed below.

1

1. The IRS is required to start and run automatically for the necessary length of time based on the Design Basis Event. There are however a number of event scenarios that may not cause activation of the containment sprays and IRS. Certain events will initiate containment sprays, but only for a relatively short period of time normally insufficient for long term iodine control. In such instances as these, the IRS will require manual restart to decrease iodine levels in the containment atmosphere. A description of the restart capability for the CESSAR IRS is contained in this package.
2. The IRS may also require restarting in the event of long-term iodine buildup in the containment atmosphere. Since this buildup will most likely be due to volatilization of iodine that has plated out on containment surfaces, repeated operation of the containment sprays will be the only effective method for iodine control. Another case in which the IRS will require restart would be after a delayed release from the Reactor Coolant System. For example, a delayed release may be due to the operation of the Reactor Vessel Head Vent System. Included in this package is a description of the CESSAR IRS long term control for delayed releases.
3. Sump pH control for the hydrazine IRS is controlled by storage of dry chemicals (typically tri-sodium phosphate) in the containment sump. This method provides a passive mechanism that does not require sump pH buffering by a pumped system. This is especially important since some recent events (e.g., Crystal River) have caused the containment sump to fill with water containing boric acid without actuation of the IRS. Where the chemical buffering agent is physically located in the sump area, the acidic RCS fluid can be neutralized without actuation of the containment spray system, hence the sump fluid pH is raised to inhibit materials corrosion.

2

II. Interface Requirements Revisions for CESSAR, Appendicies A and B of Chapter 6 This section identifies the proposed changes to the IRS Interface Requirements in Appendicies A and B of Chapter 6 of the CESSAR-F document. These interface requirements will be included in a future amendment to CESSAR-F.

The new interface requirements ensure that the balance of plant be designed for re-initiation of tLe IRS and for replenishing the hydrazine as necessary.

Note that only those paragraphs affected are listed under the appropriate section.

A. Amend Appendix 6B, Section 7.16.2, Containment Sump, as follows:

7.16.2 CONTAINMENT SUMP Long term post-LOCA containment sump fluid pH control shall be provided to inhibit material corrosion and may also be necessary for iodine capture and retention. A pH range of 7.0 to 9.5 within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> post-LOCA is acceptable for corrosion control. Iodine capture and retention is provided by hydrazine which performs adequately with a sump pH between 7.0 and 9.5. However, it is recommended that the sump pH be maintained at or above 8.5 in order to inhibit iodine evolution from the sump water. Long-term iodine control may be enhanced by periodic operation of the IRS (Section 7.9.1). Storage of baskets containing tri-sodium phosphate within the containment is the recommended method of pH control.

B. Add the following paragraph to Appendix 6B, Section 7.9 as follows:

7.9 OPERATIONAL AND CONTROLS 7.9.2 In support of the long-term control of iodine. provisions shall be made to allow periodic restart of the IRS.

I 3

i C. Amend Appendix 6B, Section 7.13.23 as follows:

7.13.23 Access to the IRS shall be provided for maintenance or refilling the Spray Chemical Storage Tank (SCST) after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> post-LOCA. Radiological and hydrazine vapor hazards must be considered.

D. As a result of incorporating the above interface requirements, amend Appendix 6B, Section 3.1 as follows:

3.0 DESIGN DESCRIPTION

3.1 INTRODUCTION

The spray chemical addition pumps and the SCST are located outside containment to permit personnel access for inspection, testing, and maintenance during normal plant operation. Access is also provided 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> post-LOCA for refilling the SCST in the event additional hydrazine is required for long-term iodine control. The pumps and addition lines are physically separate such that a single failure in one train will not cause the loss of the redundant train, i

E. Add the following paragraph to Appendix 6B, Section 4.1.2:

4.1.2 OPERATION DURING PLANT ACCIDENT CONDITIONS Following automatic operation, the IRS may be manually restarted as necessary to provide long-term iodine control. Periodic sampling of the containment atmosphere for iodine may indicate the need for IRS activation and hence optimize the use of the removal system.

f I

4 4

,-r -

., . - . - - . - . , . ,y - ----_w-,- -c.-,, - - - - - - - -- - - , - - - _ , -

4 F. Amend Appendix 6A, Section 7.16.2, Containment Spray Sump, as follows:

7.16.2 CONTAINMENT SPRAY SUMP The containment sump shall be designed to comply with Regulatory Guide 1.82 " Sumps for Emergency Core Cooling and Containment Spray Systems" requirements. Baffles and intake screens shall be installed to limit the maximum particle size entering the recirculation piping to 0.09 in diameter in order to prevent flow blockage in the Engineered Safety Features components and piping and in the reactor. The sump intakes shall be designed so as to preclude the entrainment of air and/or steam into the sump suction lines. The. pressure drop across the baffles and intake screens shall be sufficiently low to provide the Net Positive Suction Head (NPSH) required by the containment spray pumps. See Appendix B, Section 7.16.2, for the post-LOCA sump pH requirements.

III. IRS OpRrational Reauirements and Human Factors Considerations Provided in this section are operational requirements for the System 80 IRS. Included are details of operator actions required to manually initiate the IRS. That is, the necessary switches and instrumentation for manually restarting the IRS for long-term iodine control are located in the control room. Also included are the emergency operations for the IRS following a loss ,f Coolant Accident.

A. IRS AUTOMATIC CHEMICAL ADDITION MODE Description of Operation The IRS is actuated from a standby condition to the chemical addi-tion mode by a Containment Spray Actuation Signal (CSAS). The CSAS is initiated by two out of four high-high containment pressure signals of 10 psig. Also it can be initiated manually by the operation of two separate switches in the control room. This signal starts the Spray Chemical Addition Pumps (SCAPs) and opens both the SCST 5

and the IRS isolation valves. The chemical additive stored in the SCST and normally isolated from the atmosphere is pumped into the CSP suction. The chemical additive is transferred into the contain-ment atmosphere, via the spray headers and nozzles, by the Containment Spray System (CSS).

Since the SCST is isolated from the atmosphere during system operation, it is supplied with vacuum breakers to protect the SCST and supply proper NPSH for the SCAPs. When pressure in the SCST drops to approximately negative 2 psig during chemical addition, the vacuum breakers open allowing air into the SCST.

The SCST is supplied with a low pressure alarm at approximately 2 psig and a low liquid level alarm at approximately 90%. These may alarm in the control room during the chemical injection mode but have no effect on system operation.

The IRS components are aligned to the Electrical Distribution System according to the availability of power sources. If the preferred plant electrical sources are unavailable, the components will be supplied by the emergency diesel generator (started on a Safety Injection Actuation Signal, SIAS) and energized in sequence.

The chemical addition mode is automatically terminated by a SCST low-low liquid level at approximately 45%. If both trains operated, ,

the IRS will be isolated from the CSS in approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

However, after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of IRS operation,with only one train, the operator may elect to terminate IRS operation manually before the SCST low-low level is received. He does this by stopping the SCAPs and shutting the SCST and IRS isolation valves. If terminated _m manually, a CSAS override alarm is indicated in the control room.

The IRS may be restarted as necessary to provide long-term iodine control. Periodic samples of the containment atmosphere for iodine i

6 i

~- ----. - - - . _ - . _ , .

y

.-  :. . g r, - - - -

b. '

l l l T ,

. s. .

4 g , . . s

, ~s. '

t .,

Figure III-1

n .

N HYDRAZINE MANAGEMENT SCHEME a, . 7'=: ',- .

t . . FOR LONG-TERM IODINE CONTROL

s ,

j i . .

~

4 i j' ,

.- \ '

i

v.  :. s i i ~

l' t ,

,i '

RA

, . s' s s l

j N  :

IODINE REMOVAL .f f j g < r 7 < -

t SYSTEM UPERATION' i

// y ,

~

~

'~

~

(1) (2)

\

\ a

. . . rt ,

j N ,

j ,- -

i CSAS 4 12 24 148 r i TIME (HOURS) l 1 L i

! NOTES: (1) Initial 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> IRS operation with two trains  !

2 (2) Af ter 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and sampling, restart one train for one-half hour duration as necessary j t  !

[

i i I'

.k j

levels will optimize the use of hydrazine. Figure (III-1) provides details for a hydrazine management scheme to ensure effective long-term iodine control.

Initial Conditions

a. A SIAS has been initiated.
b. A CSAS has been initiated (either automatically or manually by the operator),
c. The CSS is aligned to the containment atmosphere and operating.

Operational Requirements No operator actions are required for the automatic chemical addition mode unless it has been determined to manually terminate chemical addition according to one or the other of the following conditions:

a. No fission products have been released to the containment atmosphere following a CSAS. Such could be the case for a Main Steam Line Break which would not require the IRS.
b. Fission product levels are below an acceptable limit and can be maintained at these levels by cleanup systems such as the Containment Building Ventilation System.

If manually terminating chemical addition, the following operations are required:

a. Verify SCST level and the amount of time the IRS has operated.
b. Stop the SCAPs and isolate the SCST and the IRS.

8

B. LONG-TERM I0 DINE CONTROL Description of Operation The IRS shall be manually restarted by the operator to provide long-term iodine control utilizing the CSS and IRS operating scheme provided in Figure III-1. The SCST level will be at approximately 45% if chemical addition was automatically terminated. If the IRS was terminated manually after 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> of operation of one train, the SCST level will be approximately 70%. If the IRS was terminated automatically, the SCST low-low level signal must be overridden to manually restart the system.

Initial Conditions

a. A Safety Injection Actuation Signal (SIAS) has been initiated,
b. A CSAS has been initiated (either automatically or manually by the operator).
c. The CSS is aligned to the containment atmosphere and operating,
d. The chemical addition mode has been terminated (either automatic-ally or manually the by operator).
e. If required, the IRS has been inspected and is in the standby mode.

Operational Requirements

a. To manually restart chemical addition, the SCST and IRS iso-lation valves are opened and the SCAPs are started.
b. To minimize the radionuclide releases to the environment following a RCS boundary break and/or core damage, it is desirable to keep the radionuclides inside the containment. Iodine is the 9

1032/(82VlA)sf nuclide of greatest concern. The IRS operates in conjunction with the CSS to remove iodine from the containment atmosphere.

Iodine may be released to the containment atmosphere at various times following event initiation, e.g., it may be released directly from the core in a large LOCA; it may be evolved from iodine plated out on containment surfaces; or it may be released during reactor vessel venting to the containment. Since the CSS is activated automatically on containment pressure, its actuation may not correspond to the time of peak containment iodine levels or it may not be actuated at all (depending on the event). Therefore, depending on the status of containment integrity, it may be desirable to start or restart containment spray to remove iodine from the containment atmosphere.

For those IRS's using hydrazine, it may be desirable to further increase sump water pH (beyond that achieved by trisodium phosphate in the sump) to increase long-term (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> post-LOCA) iodine retention in the sump. An alternate method of adding a pH buffer (typically sodium hydroxide) is by establishing a flowpath with the charging pumps.

c. Before terminating containment spray, the operator must verify that containment pressure is below the predetermined acceptable value. Termination may be useful to recover from the LOCA since continuous use of the containment sprays may impact the operation of equipment inside containment. Since the contain-ment pressure may increase again, the containment spray system should be realigned for automatic operation when it is terminated.

The spray system may also be required to operate in conjunction with the IRS in the event of an iodine buildup in containment.

l 10

IV. Chemistry Summary of Hydrazine Concentrations and Interactions with Iodine in Containment The following paragraphs provide a summary analysis of the hydrazine available for iodine removal based on long-term intermittent operation of the IRS.

The IRS receives hydrazine from the SCST and sprays the contaminant atmosphere to remove the initial iodine inventory. The hydrazine added from the IRS becomes diluted in the containment sump and may be insufficient in concentration to effect iodine retention in itself. Re-evolution of iodine species from the sump, however, would be anticipated only upon oxidation of the iodide which was originally formed in the reaction between hydrazine and iodine in the spray. Sufficient quantities of hydrazine are available for airborne I2 rem val during subsequent operation of the IRS.

A. Hydrazine Concentration in the Sump Hydrazine concentrations in the containment sump, following a 30 minute period during which the containment spray system is operated, would range from 5 to 14 ppm. This concentration range is dependent on the LOCA scenario in which various quantities of water enter the sump. Subsequent decrease in the hydrazine concentrations will occur from the effects of radiolysis and oxidation.

Long-term availability of hydrazine in the sump would not be sufficient to react with the design basis LOCA iodine inventory, if this were the only mechanism of iodine capture. The containment spray, however, contains sufficient quantitites of hydrazine to effect the initial iodine capture and the control of subsequent releases of iodine (from the core, or re-evolution from surfaces) should they occur.

11

B. Hydrazine Concentration in Containment Spray Hydrazine is blended with recirculated sump water to produce a minimum concentration in the spray header of 53 ppm. The initial concentration of hydrazine in the spray droplets decreases to a minimum of 48 ppm, due to the reaction between hydrazine and oxygen in the sump water. Further reaction with oxygen during the droplet transit time causes this concentration to decrease by an additional 0.4 ppm. .

Energy deposition from radionuclide decay in the sump water causes radiolysis of the hydrazine; another mechanism to decrease the hydrazine concentration. The hydrazine, added to the containment spray, is degraded through radiolysis at a rate of approximately 40%

or 20 ppm per hour. This loss rate is insignificant when compared to the 7-8 second transit time for each drop, which represents the period of iodine capture.

With a continuous feed of hydrazine into the recirculated sump water, the containment spray is capable of capturing the entire inventory of core iodine released following the design basis LOCA.

The total quantity of hydrazine delivered during a 30 minute spray period is 40 times the stoichiometric amount needed to react with all the iodine released following the design basis LOCA.

C. Iodine Partitioning from the Sump The partitioning of iodine from the sump into the containment atmosphere is predicted from partition coefficients, defined as the ratio of the total iodine species concentration in liquid to the concentration of 1 in the vapor. The values of the partition coefficients depend 2

on the equilibrium concentrations of iodine from the hydrolysis reaction between 12 (aq) and water. This equilibrium is pH-dependent as the following equation illustrates:

1 2 (aq) + H2 O + H0I (aq) + I" (aq) + H+ (aq) 12 I

In this reaction, iodine does not ungergo a net reduction or oxidation.

The hydrolsis, is therefore, reversible and depends only on the

^

presence of both I (aq) and H0I(aq).

When hydrazine is present in solution, H0I(aq) is reduced to I~(aq).

This means that water which contains hydrazine produces a net reduction of captured 1 2 to I". Evolution of I from such a solution is not 2

expected unless other c?chanisms are available to produce sufficient concentrations of oxidized iodine species to react with I-(aq) and form I2(aq).

Experiments performed in simulated containment vessels, in which hydrazine sprays were used to capture I 2 from the vapor space, demonstrated a long-term retention of iodine in sump liquid which contained boric acid at a pH of 7.0.'l)'

This implies that oxidation of reduced iodine species (I~) proceeds at a slow rate, which thereby limits the partitioning of iodine to the containment atmosphere.

Radiolysis of I"(aq) solutions is expected to produce chemical changes which could influence the extent of 12 f rmation, and subsequent evolution from solution. Radiolysis experiments performed on I-(aq) solutions demonstrate that 1 2 f rmation is insignificant at neutral to alkaline pH. These results are presented in the next section.

V. Summary of Radiolysis Experiments of Iodine Solutions

. Experiments have been performed on iodide and iodate solutions irradiated with cobalt 60 radiation.(2) The pH was adjusted with H SO4 or Na0H and 2

ranged from 2 to 10. The aqueous solutions were either scrubbed with helium to deaerate, or scrubbed with air to fully aerate. Initial iodide

-4 molar, or < 10 ' molar. The concentrations were either 10- to 10 _

3 absorbed doses ranged from 10 to 10 rads.

The following observations from this study are considered significant:

13

l. Iodide (I-), when extremely dilute (< 10'II molar), is quantitatively converted to todate (10-). This conversion is only slightly affected by pH.
2. Moderate concentrations of I~ (10 10-4 molar) are mostly converted 2 at low pH (pH = 2-3), and mostly unreacted at, or above pH =

to I 5.

3. Iodine (I 2) concentrations after 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of irradiation were greater by a factor of 2 to 3 than after 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of irradiation.

4 There were no significant differences in solution composition whether completely aearated or deaerated.

5. The kinetics of the radiolysis reactions are considered to be rapid; the evolution of 1 2 from an irradiated solution is expected to be limited by mass transfer of the I rather than the radiolytic production 2

rate.

6. The presence of a free radical scavengers such as Cu2 + have a significant effect on the production of I from I . The percentage of 1 at pH 2 2

= 7 ranged from 0.3 to 38.1% as the concentration of copper ranged

-5 from 5 x 10 to 5 x 10 -4 molar. Similar behavior is anticipated with other free radical scavengers.

Table V-1 summarizes the solution composition as a function of such variables as pH, initial I~ concentration, absorbed dose and dose rate.

0 For comparitive purposes, a post LOCA containment sump with 4 x 10 lbs.

of water is expected to contain up to 59 x 106 curies of I-131. The total sump concentration of I , including I-127, would be approximately 1 x 10-5 molar.

14

Table V-1 (I-)ini' ol, dose, Distribution of Iodine, Variables pH Molarity rads Post-Irradiation, %

I- 10- I 6

3 10-3 4.5 x 10 18.0 0.2 81 8 4 10-3 4.5 x 10 6 92.3 1.1 8.6 4.5 x 10 6 7.3 10-3 95.9 2.9 1.2 pH 9 10-3 4.5 x 10 6 96.2 3.5 .3 exposure 5 10-3 4.5 x 10 6 97 .3 2.4 time (1 hr.)

6 5 10-3 99 x 10 93 .5 6.9 (22 hrs.)

Aeration of Solution He Scrubbed 6.7 < 10

-II 4.5 x 10 6 1.5 98.5 ---

Air Scrubbed 6.9 10-II 4.5 x 10 6 2.2 97.4 0.4 dose 7 < 10-II 3.7 x 10 3 84.7 13.4 1.9

-II 7 10 4.5 x 10 78.0 19.8 2.2 5

7 10-II 1.2 x 10 5.0 94.5 0.4 Initial (I ),

pH 7.3 10-3 4.5 x 10 6 95.9 2.9 1.2

. 6.6 10-4 4.5 x 10 6 95.1 1.2 1.7 6.7 1 10

-II 4.5 x 10 6 1.5 98.5 ---

-4 4 10 4.5 x 10 6 18.0 0.2 81.8 4 1 10

-II 4.5 x 10 6 1.1 98.5 0.4 15

. . - , = - _ -

v Partition Coefficients Partition coefficients from the radiolysis experiments are calculated from the concentration date listed in Table V-1 and compared with partition coefficients based on non-irradiation hydrolysis conditions ( ). These are shown in Table V-2.

Table V-2 EI ] (total, liq.)

Irradiation 2 pH Partition Coefficient 5 76 No 5 x 10-4 m 1,100 5

Yes 5 x 10-4 m No 5 x 10-4 m 7 87 Yes 5 x 10-4 m 7 6,250 5 x 10 -6 m No 7 200 Yes 5 x 10 -6 m 7 3,750 No 5 x 10-4 m 9 234 Yes 5 x 10-4 m 9 25,000 As the partition coefficient is increased, the tendancy for iodine to evolve from solution is decreased. The radiolysis experiments show that the concentrations of 1 2 that result from irradiation of I- solutions are consistently lower than the equilibrium 2I concentrations that exist in non-irradiated aqueous iodine solutions.

VI. Summary of Coolant Release at Crystal River Unit 3 An incident at Crystal River Unit 3 on February 26, 1980 caused approximately 40,000 gallons of coolant to be released from the RCS and enter the containment sump.(4) The liquid released included reactor coolant and refueling water, added through the high pressure safety injection pumps.

Containment spray was not initiated nor were any adjustments made in the pH of the coolant entering the sump. Although measurements were not available, it is estimated that the final pH of the sump liquid was below 6.0.

16

Iodine concentrations were measured in the sump liquid and the containment a tmosphere. The results of these measurements are shown in Table VI-l and Figures VI-1 and VI-2. The chemical forms of the iodine were not determined. I-131 in the atmosphere peaked at 4 x 10 -5 uCi/cc approximately 84 hours9.722222e-4 days <br />0.0233 hours <br />1.388889e-4 weeks <br />3.1962e-5 months <br /> following the releases of coolant. The I-131 activity in the sump liquid immediately following the release was between .25 and .45 uCi/cc. The partition coefficient decreased to a stable, minimum value of 2,000, 5 days following the release.

Although the chemical forms of iodine were not determined, the implication of the activity measurements following the release of coolant was that there was no significant, long-term evolution of iodine from the sump liquid, even at relatively low pH.

17

Table VI-l REACTOR COOLANT RADI0 CHEMISTRY CRYSTAL RIVER UNIT 3 i Sample Total Activity Dose Eq. I I-131 1-133 Cs-124 Co-58 H-3 Date Time uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc uCi/cc 2-26 0010 2.29 0.322 0.246 0.233 1.77E-2 7.64E-2 0.27 1423 - 1428 Discharge of Coolant 1615 2.41 0.593 0.454 0.429 4.46E-2 2. 31 E-2 1904 1.55 0.566 0.447 0.383 4.lSE-2 -------

2135 1.93 0.831 0.664 0.548 5.75E-2 5.19E-2 2-27 0058 2.63 1.45 1.19 0.884 8.91E-2 -------

0.13 0615 1.97 1.10 0.924 0.574 8.47E-2 -------

0.113 0855 1.78 0.979 0.833 0.506 1.04E-2 -------

1255 1.60 0.944 0.818 0.437 7. 71 E-2 -------

1755 1.75 1.07 0.949 0.416 9.37E-2 9.99E-3 2110 1 .31 0.81 8 0.736 0.288 7.06E-2 1.12E-2 2-28 0110 1.12 0.755 0.686 0.245 4.97E-2 2.0E-3 0.112 0815 0.97 0.620 0.575 0.160 6.76E-2 9.6E-3 2020 0.77 0.526 0.525 -----

5.52E-2 5.3E-2 4

I 18

- I, Uu

_~ -

O 1.0 --

- _  % ~

+

g _

a u C~ ,

- i L

e

- Q Ccse ecuivalent iodine g O rodine-131 tnp I  !  !  !

0.1 12 Micngt 12 Ncen 12 Micnig.- 12 NO:n 12 Mientg.: 12 tben 2/27/S0 2/25/50 2/2S/SO Time .

Figure VI I Radic-tecine in reac:cr coctant versus time.

8 9

19 .

  • * *.enum .,

W e y - ,. - -

.--.r ,

1 x 10" -

1.0 _ _

O _

o xe-133 C-O lodine-131 -

v e

s c e s 0 - 1 x tod ;;;

3 o.1 6

c _ _ s-X 6 _ _ a O

m O

coolant release I I I 1 x 104 3 I 10 I I I o.o1 3/1/50 0 0 2/25/80 0 2/27/50 0 2/25/50 0 2/29/50 0  ?

Date Figure VI -2 Xe-133 and Ic4ine-131 levels in centainment at.ncs::. tere. .

4 i

I e

20

References

1. A. K. Postma, " Absorption of Iodine from Containment Atmospheres by Boric Acid Spray Containing Trace Level Additives". BNWL Contract 212B00621, Final Report, Battelle-Northwest, Richland, Washington 99352, 1972.
2. Lin, C. C. , J. of Inorg & Nuclear Chem, 42, p.1101,1980.
3. Parsley, L. F. " Design Considerations of Reactor Containment Spray Systems - Part IV. Calculations of Iodine-Water Partition Coefficients",

ORNL TM 2412, Jan., 1970.

4 INP0/NSAC Crystal River Task Force 1980, " Analysis and Evaluation of Crystal River - Unit 3 Incident", NSAC-3/INP0-1, March,1980.

i 21