Proposed Tech Spec Changes Clarifying Limiting Condition for Operation Where Secondary Containment Integrity Cannot Be Properly Maintained & Operability Requirements for Standby Gas Treatment Sys
ML20054F833
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/11/1982
From:
GEORGIA POWER CO.
To:
Shared Package
ML20054F831 List:
References
TAC-48120, TAC-48520, NUDOCS 8206170370
Download: ML20054F833 (5)


Text

. .

ATTACHMENT 1-

~NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 SECONDARY CONTAIretENT TECHNICAL SPECIFICATION CHANGE PROPOSAL The proposed changes to Technical Specifications (Appendix A to Operating-License DPR-57) would be incorporated as follows:

Remove Page Insert Page 3.7-10a 3.7-10a 3.7-11 3.7-11 3.7-13 3.7-13 l

8206170370 820611 PDR ADOCK 05000321 P pop l

l

8. Shutdown Requirements If Specification 3.7. A cannot be met, an orderly shutdown shall be initiated and the reactor shall be brought to Hot Shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and shall be in the Cold Shut-down condition within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

B. Standby Gas Treatment System B. Standby Gas Treatment System

1. Operability Requirements 1. Surveillance When System Operable A minimum of three (2 of 2 in Unit 1 and 1 of 2 in Unit 2) of the four in- At least once per operating dependent standby gas treatment system cycle, not to exceed 18 months, trains shall be operable at all times the following conditions shall when Unit 1 secondary containment be demonstrated:

integrity is required.

a. Pressure drop across the With one of the L. nit 1 standby gas combined HEPA filters and treatment system; inoperable, for charcoal absorber banks is any reason, Unit 1 reactor operation less than 6 inches of water and fuel handling and/or handling of at the system design flow casks in the vicinity of the spent rate (+10%, -M).

fuel pools is permissible for a period of seven (7) days provided b. Operability of inlet heater that all active components in the at rated power when tested remaining operable standby gas in accordance with ANSI treatment systems in each unit N510-1975.

(minimum of 1 in Unit 1 and 1 in Unit 2) shall be demonstrated to c. Air distribution is uniform be operable within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and within 20% across the daily thereafter, filter train when tested in accordance with N510-1975.

3.7-10a

i LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS

8. Standby Gas Treatment System B. Standby Gas Treatment System
1. Operability Requirements (Cont'd) 1. Surveillance When System Operable (Cont'd)

If the inoperable Unit 1 standby gas treatment system is not made d. Automatic initiation of each fully operable within the se en train of the Unit 1 and Unit 2 (7) day period, the Unit 1 reactor standby gas treatment systems.

shall be shutdown and placed in the cold shutdown condition within e. Manual operability of the by-the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> and Unit 1 or pass valve for filter cooling.

Unit 2 fuel handling operations shall be terminated within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

Unit I reactor operation and Unit 1 or Unit 2 fuel handling shall not be allowed if both of the Unit 1 standby gas treatment systems are inoperable or if both of the Unit 2 standby gas treatment systems are inoperable.

I

3. 7.8. 2 Performance Requirements 2. Filter Testing
a. The results of the in-place a. The tests and analysis shall DOP and halogentated hydro- be performed at least once per carbon tests at design operating cycle, not to exceed 18 flows on HEPA filtere and months, or after every 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> charcoal absorber banks of system operation, or following shall show 99% DOP removal painting, fire or chamical re-and 99% halogenated hydro- lease in any ventilation zone carbon removal when tested communicating with the system.

In accordance with ANSI N510-1975. b. DOP testing shall be performed I after each complete or partial l

b. The results of laboratory replacement of the HEPA filter carbon sample analysis shall bank or after any structural show 90% of radioactive methyl maintenance on the system housing iodine removal when tested in accordance with RDT-M16-1T c. Halogentated hydrocarbon testing (800C, 95% R.H.). shall be performed after each complete or partial replacement

, c. Fans shall be shown to operate of the carcoal absorber bank or within +10% -0% design flow after any structural maintenance

when tested in accordance with on the system housing.

i ANSI N510-1975.

d. Each circuit shall be operated with the heaters on at least 10
hours every month.

l 3.7-11 t

4.7.C.l. Surveillance While Integrity Maintained (Cont'd)

b. Secondary containment capability to-maintain a minimum 1/4-inch of water .

vacuum under calm wind ( 5 mph) I conditions with- each filter train flow rate not more than 4000 cfm shall be demonstrated at each refueling outage, prior to refueling.

3.7.C.2 Violation of Secondary 2. Surveillance After Integrity Violated Containment Integrity

a. Without Hatch-Unit 1.secon- After a secondary containment viola-dary containment integrity, tion is determined the standby gas restore Hatch - Unit 1 se- treatment syJtem will be operated condary containment inte- immediately. after the affected zones grity within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or per- are isolated from the remainder of form the following (as appli- the secondary containment. The cable): ability to maintain the remainder (1) Suspend irradiated fuel of the secondary containment at and/or fuel cask handling 3/4-inch of water vacuum pressure in the Hatch-Unit 1 se- under calm ( 5 mph) wind conditions condary containment. shall be confirmed.

(2) Be in at least Hot Shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and meet the Conditions of 3.7.C.1.a within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

b. Without Hatch-Unit 1 secondary i containment, refer to the follow-ing Hatch-Unit 2 Technical Specification, for LCO's to be i followed for Hatch-Unit 2:

(1) Section 3.6.5.1.

(2) Section 3.9.5.1.

4 D. Primary Containment Isolation Valves D. Primary Containment Isolation Valves

1. Valves Required to be Operable 1. Surveillance of Operable Valves During reactor power operation, Surveillance of the primary con-all primary containment isolation tainment isolation valves shall be valves listed in Table 3.7-1 and performed as follows:

all reactor coolant system instru-ment line excess flow check valves a. At least once per operating shall be operable except as stated cycle the operable isolation in Specification 3.7.0.2. valves that are power operated and automatically initiated

! shall be tested for simulated automatic initiation and the closure times specified in Table 3.7-1.

3.7-13 i

4 ATTACmENT 2 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 SECONDARY CONTAIf44ENT TECMICAL SPECIFICATION CHANGE PROPOSAL l Pursuant to 10 CFR 170.22, Georgia Power Company has evaluated the attached proposed amenchent to Operating License DPR-57 and has determined that:

a. The proposed amendment does not require evaluation of a new Safety Analysis Report and rewrite of the facility license;
b. The proposed amendment does not require . evaluation of several complex issues, involve ACRS review, or require an environmental impact statement;
c. The proposed amendment does not involve a complex issue or more than one environmental or safety issue;
d. The proposed amendment does involve a single safety issue, namely, the addition of a Limiting Condition . for Operation without secondary containment integrity.