Letter Sequence Other |
|---|
|
Results
Other: ML19318A864, ML19339A562, ML19345C828, ML19345F861, ML19347F720, ML19350C476, ML20003J281, ML20004B393, ML20005C074, ML20010B236, ML20039D806, ML20039G762, ML20052A970, ML20053A712, ML20053D576, ML20054D571, ML20058F580
|
MONTHYEARML19318A8641980-06-20020 June 1980 Forwards Suppl to Physical Security Plan.Suppl Withheld (Ref 10CFR2.790) Project stage: Other ML19339A5621980-10-30030 October 1980 Forwards Revised Physical Security Plan,Issue 2,Revision 7 & Summary of Changes.Encls Withheld (Ref 10CFR2.790) Project stage: Other ML19345C8281980-12-0202 December 1980 Requests Extension Until 800131 to Provide Complete Description of Changes to Security Plan,In Response to NRC 801001 Request Re Vital Area Analysis Project stage: Other ML19345F8611981-01-19019 January 1981 Confirms Actions to Be Taken Re Installation of Security Sys as Discussed in Util .Encl Describing Actions Withheld (Ref 10CFR2.790) Project stage: Other ML20003A7121981-02-0202 February 1981 Forwards Proposed Changes to Security Plan Vital Area Analysis.Encl Withheld (10CFR2.790) Project stage: Request ML19350C4761981-03-26026 March 1981 Ack Receipt of Re Changes to Security Plan & Relief from Requirements of 10CFR73.55.Encl a Provides Addl Info Re Position on Security Plan Changes & Encl B Contains Denial of Requests.W/O Encl.Encls Withheld (Ref 10CFR2.790) Project stage: Other ML20003J2811981-05-0505 May 1981 Forwards Attachment a to Physical Security Plan.Attachment Withheld (Ref 10CFR2.790) Project stage: Other ML20004B3931981-05-19019 May 1981 Forwards Class III Fee Re 810519 Revision to Physical Security Plan Project stage: Other ML19347F7201981-05-19019 May 1981 Forwards Revised Pages of Issue 2,Revision 8 of Physical Security Plan.Revised Pages Withheld (Ref 10CFR2.790) Project stage: Other ML20010B2361981-07-30030 July 1981 Forwards Attachment & Figures 1-5 Clarifying Revision 8 to Physical Security Plan.Encls Withheld (Ref 10CFR2.790) Project stage: Other ML20005C0741981-11-12012 November 1981 Notifies That Portion of Security Plan for Facility Requires Revision.Plan Should Be Amended to Incorporate Specific Commitments Discussed in Encl.Proposed Amend Should Be Submitted within 30 Days.Encl Withheld (10CFR2.790) Project stage: Other ML20039D8061981-12-30030 December 1981 Forwards Description of Two Changes in Facility That Affect Physical Security Plan.Changes Are Temporary & Include Mod of Protected Area Fence & of Automated Access Control Sys. Encl Withheld (Ref 10CFR2.790) Project stage: Other ML20039D4621981-12-31031 December 1981 Summary Rept on Reactor Vessel Integrity for Westinghouse Operating Plants Project stage: Request ML20039G7621982-01-12012 January 1982 Submits Correction to Util Re Changes Made to Physical Security Plan.Due to Typographical Error First Paragraph Was Incorrectly Worded Project stage: Other ML20054D5711982-04-0909 April 1982 Ack Receipt by Transmitting Changes to Util Security Plan.Revisions Acceptable Project stage: Other ML20052A9701982-04-16016 April 1982 Forwards Comments on 801230 & 820112 Changes to Security Plan.Response Requested within 30 Days Project stage: Other ML20053A7121982-05-19019 May 1982 Forwards Three Revisions to Station Physical Security Plan. Revisions Withheld (Ref 10CFR2.790) Project stage: Other ML20053D5761982-05-21021 May 1982 Submits Addl Info to Support Proposed 10CFR50.54(p) Change to Physical Security Plan.Info Withheld (Ref 10CFR2.790) Project stage: Other ML20058F5801982-06-25025 June 1982 Concurs That Changes to Facility Security Plan Transmitted in 811230,820112 & 0321 Ltrs Are Consistent w/10CFR50.54(p) Project stage: Other 1981-03-26
[Table View] |
Text
- _ _
O g5Vg
'At3 Telephone (412) 4564000 Nuclear Division P.O. Box 4 Shippingport, PA 150770004 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission A t tn :
Mr. Steven A. Varga, Chief Operating Reactors Branch No.1 Division of Licensing Washington, DC 20555 Refe rer.ce :
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Physical Security Plan Centlemen:
Enclosed are three revisions made to the Beaver Valley Power Station Physical Security Plan. These changes were reviewed and i
judged not to constitute a degradation to the Physical Security Plan. These revisions include:
(1) Security organization changes (2) relocation of the Unit 2 Control Room area Protected Area barrier and (3) material inspection clarification.
These changes, since they do not decrease the safeguards effec-tiveness of the Physical Security Plan, are being submitted in accor-dance with 10 CFR 50.54(p).
The enclosed materials are considered proprietary under the provisions of 10 CFR 2.790(d) and are thereby exempt from public disclosure.
If you have any questions concerning this matter, please contact my office.
SoOI Ve uly yours, g
/
i J. J. Carey Vice President, Nuclear Enclosure cc:
W. M. Troskoski, Resident Inspector United States Nuclear Regulatory Commission Beaver Valley Power Station
""M.oSURES CONTAIN'SAFECUARDSj Shippingport, PA 15077 i-\\ TION. UPON SEPARATl0K h;,3 PAGE IS DECONTROLLED,;fh.
8205270 Mp
..