ML20052A088

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Emergency Plan Implementing Procedure EPIP-2, Unplanned or Uncontrolled Release of Radioactive Matl.
ML20052A088
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/06/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20052A085 List:
References
219, NUDOCS 8204270063
Download: ML20052A088 (1)


Text

_____ - - _ _ _ _ _ _ _ _ _ _ _ _ _

. o .

VinoINIA ELucrRIC AND Powan COMPANY Rxcurnown, VrnouxxA 20261 E.H.LaAanemo vice r...r===v April 6, 1982 Nucz. man oranArrow.

Mr. Harold R. Denton, Director Serial No. 219 Office of Nuclear Reactor Regulation EMT/dp Atta: Mr. Robert A. Clark, Chief Docket Nos. 50-338 .

Operating Reactors Branch No.3 50-339 Division of Licensing License Nos. NPF-4 U.S. Nuclear Regulatory Commission NPF-7 Washington, D.C. 20555 Gentlemen:

EMERGENCY PLAN IMPLEMENTING PROCEDURES - NORTH ANNA POWER STATION As set forth in the provisions of 10 CFR Part 50, Appendix E, Paragraph 5, the enclosed North Anna Power Station Emergency Plan Implementing Procedure, No. 2 is being forwarded.

Sincerely, G/

R. H. Leasburg Enclosure - Emergency Plan implementing Procedures

- North Anna Power Station (IO copies) cc: Mr. James P. O'Reilly, Regional Administrator W%

Office of Inspection and Enforcement p Region II (3 copies)

~ RECEIVED 1 ,

2 -

APRI21982w 8$

s amm euer

\ 8MN mmer m

S t

6 82,0427 0 l

m O b Gi ,

I l l

.. .e -  : .. ..

. EPIP PROC. LIST i - 03-26-82 +

NOT A CON;;ry ,,g Pase 1 of 2 ,

. O *"
. tr;T i

EHERGENCY PLAN IMPLEMENTING PROCEDURES.

R T.*CCCC ;,r;,g,y g_

W ~OI !?/ ;,;;; ,

EPIP NO. Procedure Safety Code Effective Date EPIP-1 Emergency Classification and Organization Formation, Notification and Communications .S 01-15-82

\

EPIP-2 Unplanned or Uncontrolled Release of Radioactive Haterial S 02-24-82 i EPIP-3 Injured Personnel S 02-1.1-81 EPIP-4 Fuel llandling Accident * ''

! EPIP-5 VEPOO PROPERT'I Steam Generator Tube Rupt arshis doau,,n: i s t he S 08-31-77

2. , . . ...

l I rd of a D. . e cie g.g i , j'# e.f the

- i, )@W EPIP-6 Hain Steam Line Rupture ,:ad la to t.e f._, ,,g

, S 08-31-77 "o p, r-ic:::C3 2a rcanted a3 . -[,.11sh, EPIP-7 Loss of Coolant Accident reproacco, tra ng .;. o S 11-25-81

--/ EPIP-8 Evacuation and Access Coint I f: i ,

I d 22 S 09-02-77 EPIP-9 Personnel Accountability a S 11-25-81

!' O b EPIP-10 Personnel Honitoring and Decontamination S 11-25-81

$\

( U 'EPIP-ll Estimating Release From Radiation Honitoring System Data S 07-02-80 C

i

\C EPIP-12 Estimating Release From Station System Inventory Data S 07-30-80 U*

EPIP-13 Estimating Release From Offsite Radiological Data S 11-25-81 EPIP-14 Estimatir.g Doses From Release Data S 11-25-81

I . -

t I N

  • I o .

EPIP PROC. LIST s  :.

03-26-82

  • Page 2 of 2 4

Safety Code Effective llate EPIP NO. Procedure S 08-31-77 EPIP-15 Estimating Doses From Environmental Data S 11-25-81 EPIP-16 Offsite Air, Contamination and Radiation Monitoring S 08-15-77 EPIP-17 Offsite Water and Foodstuff Nonitoring S 08-08-77 EPIP-18 ' Emergency Exposure Criteria S 11-25-81 8' E1 IP' 19

5 Fire Protection ,

. . . . ew ~ S 11-25-81 EPIP-20 News and Information Releases S 01-15-82

.} EPIP-21 Emergency Preparedness and Training 1

.l.

t i . -

i EPZP-2 Page 1 of 6 02-24-82 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNPLANNED OR UNCONTROLLED RELEASE OF RADIOACTIVE MATERIAL Shift Supervisor Response

~

1.0 2.0 Operations Response 3.0 Health Physics Response Appendix 1 Stability Class Decemination Appendix 2 Blank Forms EPIP 2.1 Report on Information Sought By Emergency Coordinator or Director Appendix ., Blank Forms EPIP 2.2 Caseous Release Evaluation Appendix 4 Blank Forms EPIP 2.3 Liquid Release Evaluation Appendix 5 Dose Equivalent Factors and MPCs for Various Nuclides I

'VEPCO PROPERTY Iia . > .. .. ,.13 Ce .7 crety er ti,e g,3,q 3 LED

.,-[T.h ',,7,,,((

7," l,'l"M cric Cf . 20 al Cor:mn.I OCCUME No po, c h

  • request

.. reprecuca, tr 7- * ~

~' piel1.2,

., J . 3 . anothar any 1:dA[~[# 1 3* to thic document.

. ind in SC,','

, ._;c i.-....'rCESEAggy p,;v:S'0S .

TC 1

RECOMMEND APPROVAL: I /

t

/ } g /

APPROVED BY: . -  % -

CHAIRMASSTATIONNUCLEARpfFETY AND OPERATING COMMITTEE DATE: 02-24-82 SAFETY RELATED -

- ~ . _ . . , . - , - . . . . . .. . -

)

EPIP-2 Ptgs 2 of 6 02-24-82 1.0 Shift Supervisor Response 1.1 Obtain from Appendix 2 of this procedure a FORM EPIP-2.1,

" Report on Information Sought by Emergency Director".

1.2 Check, as appropriate to the existing situation, the blocks opposite the data desired under gaseous or liquid release.

NOTE: If radiation monitoring system data is checked, ini-tiate EPIP ll, Estimating Release from Radiation Moni-toring System Data.

NOTE: Dose estimates are going to require radiation surveys and/oc sampling and therefore require time to complete.

To obtain results sooner, strike out any data not considered applicable.

_ _ __1. 3 Assign. responsibility of the FORM EPIP-2.1 to someone in Operations and to the senior HP representative onsite. .

Sign the Form following " requested by", enter the date and time. Personally ensure the assigned operator receives the Form.

1.4 Evaluate the applicability of Appendix 1. " Significance and Evaluation of Release Estimates Based on Station System In-ventory Data", of EPIP 12. " Estimating Release from Station System Inventory Data".

l l

t

EPIP-2 i Page 3 of 6 02-24-82 2.0 Operations Response Follow the instructions for the applicable blocks as indicated on FORM EPIP-2.1.

2.1 Meteorological Data 2.1.1 Stability Class - Read directly from template attached  ;

I to delta T recorder in Control Room. If delta T is not available, use alternate methods given in Appendix 1,

" Stability Class Determination", of this procedure.

2.1.2 Wind Speed - Obtain from recorder in Control Room. Use the 150 foo. elevation, if not available use the 35 fcot

' 'I elevation, and if neither is availablu use an estimate from t

visual observations. [

2.1.3 Wind Direction - Obtain from recorder in Control Room using an approximate average of the previous 15 minutes.

Use the 150 foot elevation, if not available use the 35 foot elevation, and if neither available use an estimate from visual observations.

2.2 Radiation Monitoring System Data 2.2.1 Initiate EPIP 11. " Estimating Release from Radiation Monitoring System Data".

2.3 Source Evaluation Data  ;

2.3.1 Source of Release - Identify the source as per tank number or in the case of a pipe or tube break the source supplying the pipe or tube, describe system malfunction or any other useful information.

F

't


,.-n..e _ _ .. ..--~ ~ ~~ _ . - . . . - . .

EPIP-2 Pagt 4 of 6 02-24-82 2.0 Operations Response (cont.)

2.3.2 Possible Paths to Environs - Indicate possible paths -

the liquid or gases may get offsite, such as storm drains or process vent. This will aid HP in selecting sampling locations.

2.3.3 Actual or Estimated Duration of Release - Indicate the actual or estimated duration of the release to the environment in hours.

NOTE: If the release is continuous and an estimate must be made as to when it will be terminated, the Emergency Director, Operations and Health Physics should consult one enother and determine the estinated duration. If no estimate of the duration can be arrived at and the actual dose rate at the site boundary exceeds 50 mr/hr sustained for greater than 30 minutes, the Emergency ,

Director shall declare a General Emergency.

2.3.4 Estimated Cubic Feet or Gallons Released - Indicate cubic feet or gallons of gas or liquid actually or --

projected to be released.

2.3.5 Dilution Water - Indicate the available dilution water flow rate.

2.3.6 Present Status / Remarks - Provide any information which will aid HP such as indicating if the release is still in progress and if so when will it be terminated.

2.4 Forward FORM EPIP-2.1 to the assigned HP representative as soon as the above steps are complete.

lI

.w ,

i t

- e _---ee - -

EPIP-2 '

Paga 5 of 6 02-24-82 3.0 Health Physics Response I

3.1 Determine the Activity Released or Dose Estimates as requested I on FORM EPIP 2.1 per the following steps as appropriate.

3.2 Activity Released 3.2.1 If either of the four EPIP's listed below have been initiated by Operations, release data will be generated by that EPIP, in which case proceed to step 3.2.3 below.

EPIP-4 Fuel Handling Accident EPIP-5 Steam Generator Tube Rupture EPIP-6 Main Steam Line Rupture EPIP-7 Loss of Coolant Accident .

3.2.2 Select and initiate (based on available information) one or more of the following EPIP's to estimate re-lease:

PIP-11 Radiation Monitoring System Data EPIP-12 Station System Inventory Data EPIP-13 Offsite Radiological Data 3.2.3 As release data is obtained the results are to be entered on FORM EPIP 2.2, " Gaseous' Release Evaluation",

or FORM EPIP 2.3, " Liquid Release Evaluation", as appropriate. Blank forms and instructions are in Appendix 3 or 4. respectively.

3.2.4 Perform the calculations of equivalent Xe-133 and I-131

' and percentage MPC as indicated on FORM EPIP 2.2 or i 1 --

2.3.

i;*

l.

9 i

e t

=

4 i'

EPIP-2 Pcg2 6 of 6 02-24-82 3.0 Realth Physics Response (cont.)

I 3.3 Dose Estimates 3.3.1 Select and initate one or both of the following EPIP's to estimate doses.

EPIP-14 Release Data (requires step 3.2 above)

EPIP-15 Environmental Data 3.4 Enter the requested data on FORM EPIP 2.1, sign and enter the date and time and return the form to the originator (Opera-tions) or as directed.

f l

7 o

lt

}

i

  • i t

EPIP-2 App;ndix 1 Page 1 of 3 02-24-82 UNPLANNED OR UNCONTROLLEP RELEASE OF RADIOACTIVE MATERIAL APPE: DIX 1 STABILITY CLASS DETERMINATION THIS APPENDIX IS TO BE USED TO DETERMINE STABILITY CLASS IF THE DELTA T RECORDER IN THE CONTROL ROOM IS INOPERABLE

1. Fluctuation of Wind Direction
2. Rules of Thumb m

0

't

. , , - . ~ . - ,; __ . _ _.

- - - = _--c. - - ..,

i l

EPIP-2 l Appandix 1 l Page 2 of 3 02-24-82 1.0 Fluctuation of Wind Direction Wind direction fluctuation is the number of compass point degrees, on the wind direction recorder trace, between the two extreme gusts remaining after ignoring the two most extreme gusts (one on the left, one on the right) occuring during a 15 minute period. This difference in degrees between gusts can then be related to stability class.

2.1 Subtract the degree reading of the gust second in on the left from the degree reading of the gust second in on the right.

2.2 Obtain the stability class from the following table.

DEGREES FLUCTUATION STABILITY CLASS

> 135 A 105 to 135 B 75 to 104 C 45 to 74 D 23 to 44 E

.__..8 to 22 - F

<8 G .

EXAMPLE '

The following chart indicates for the last 15 minutes the difference between "second in" gusts is 90 degrees. The stability class would be C. ,

i l

t 1

i a

a 5 e

, t

.--- = _ . . - - - . - . . . . - .

EPIP-2 Appsndix 1 Page 3 of 3 1 02-24-82 2.0 Rules of Thumb If appropriate met tower data is not available use the following table to determine stability class.

~

ESTIMATED DAYTIME NICHTTIME WIND SPEED Amount of sunlight reaching the surface Thin overcast Little MPH STRONG MODERATE SLIGHT or cloudy Cloudiness

<4 A B B F G 4 B B C E F 9 B C C D E

> 13 C D D D D i

I .

i 4

l

~

4 I !

e .t

EPIP-2 Appindix 2 Page 1 of 2 02-24-82 UNPLANNED OR UNCONTROLLED RELEASE OF RADI0 ACTIVE MATERIAL APPENDIX 2 BLANK FORMS EPIP 2.1 REPORT ON INFORMATION SOUGHT BY EMERGENCY COORDINATOR OR DIPICTOR e

l l

B 1

f -

.i _

. l m

.t i I

\

EPIP-2 Appendix 2 Page 2 of 2 FORM EPIP 2.1 02-24-82 REPORT ON INFORMATION SOUG}rf 8T EMERGENCY C0ORDINATOR OR DIRICTOR Requested By: Date: Time:

Assigned to: OPS KP 1 i

l 6 GASEOUS REI. EASE DATA OPS D Meteorotoite.t Det.. sy: date/ti e St.bility C1.sa Determined by AT. Vind a Rule of Thumb Wind Speed t!PH Meters per second (MP11 x 0.45)

Vind Direction OPS O R.diatio= Monitort= Srste. D.t. for unic _ .

EPIP 11 initiated by: Date/ Time:

' - ~ ~

~ ~ ' OPS O Source Eealuatio= Data. av: Date/Tt er Source of Release Possible Paths to Enytrons Actual /Zatinated Duration of Reiaases hours Actual / Estimated Volume Released: cubic ft.

Present St.tue/Rensrks:

HP O Activity Released. By: date/ time Curies Ie-133 Curies I-131 x MPC (10CTR20)

EP Dose Estimates. By: date/ttee Offsite Whole Body res Onsite Whole Body res Offsite Thyroid ree Onsite Thyroid res I.IQUID REI. EASE DATA OPS D Source realuatio= Dec.. ivi dace /ti e Source of Release Possible Paths to Enetrons Actual /Estiasted Durstion of Release: hours Actual / Estimated Volume Released: gals. Dilution Water GPM Present St.tus/ Remarks:

OPS D R.diatio s.=itori= Srste. Det. for D=it _.

EPIP 11 initiated by: Date/ Time:

HP O Activity Released. av: dateiei.e

, Gross Curies of Noa Tritius or G.ses Curies Tritium Curies Gases a MPC (10CTR20)

EP O Dose Esti ates. er: date/ti a Of fsite Wole Body ree Onsite Whole Body rem

. Offsite Thyroid res Onsite Thyroid res

. Offsite Any Organ res l

l t

I t

i

EPIP-2 Apprndix 3 Page 1 of 2 02-24-82 i

i UNPLANNED OR UNCONTROLLED RELEASE OF RADIOACTIVE MATERIAL F

APPENDIX 3 b

BLANK FORM EPIP 2.2 GASEOUS RELEASE EVALUATION -

r i

o 9

e i

I.

l

~

l l

l l -.

1 i

6 9

e

-t

EPIP-2 Appendix 3 Page 2 of 2 Form EPIP 2.2 02-24-82 GASECUS REIZASE EVALUATION Date/ Time of Associated Form EPIP 2.1 Results Obtained from Onsite offstte Data Ramarks/ Additional Information:

DOSE EQUIVAIDT C 2113 CRIIS EQUITAI N T C RIIS Rf1 EASED NUCLIDE REZZASED FACTORS RIIZASED MPC MPC RLM A B Aa5 C A+C To illustrate methoc S e of Lquiv. Ci Ee-133 Released Total Sum of Equiv. CA I-131 Released Total Calculation of the number of tien !!PC exceed averaged over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a !!PC = I/O 8.64 a 10, x (Total CLA!PC for Is + Total Ci/f!PC for I)

?"

= s( + ) = Times MPC _

8.64 x 10" l

Results By:

Date/ Time:

i I t

. - . _ _ , .n . . - - . . . . - . , .

% o EPIP-2 AppIndix 4 Page 1 of 2 02-24-82 UNPLANNED OR UNCONTROLLED RELEASE OF RADI0 ACTIVE MATERIAL APPENDIX 4 BLANK FORMS EPIP 2.3 LIQUID RELEASE EVALUATION i

1 j

i e

1 E

i

'T

dB EPIP-2 Appendia 4 Page 2 of 2 Form EPIP 2.3 02-26-82 LIQUID REII.ASE EVALUATION  ;

Date/ Time of Associated Form EPIP 2.1 Sample obtained from Ramsrks/ Additional Infarastion:

l

)

it sla pC1 pCi Release <:

Nuclide al Released Released MPC  ?!PC RLM I

l i I I

i I

Total Non-Tratsum or Non-Aadtosases E-3 3E-3 Total Dassolved Aadiosases Calculation of the number of times IIPC asceeded averaged over 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a !!PC = 1.83 x 10'I a Total for all pCi Released /t!PC Dilution Water GP5 a 1.83 10

  • I a( + + )

( ) _

= 1 !!PC Results By:

Date/ Timer I t l

l

.9 ..

2 PIP-2 Appendix 5 Page 1 of 2 02-24-82 UNPLANNED OR UNCONTROLLED RELEASE OF RADIOACTIVE MATERIAL APPENDIX 5

(

DOSE EQUI 7ALENT FACTORS AND MPCs FOR VARIOUS NUCLIDES V

-t f *

- l i

4 j

l l

t

~ - - . _ . _ _ - . _ . . _ _ . _ _ .

, n - ..me-, - m -e,.

EPIP-2 Appendix 5 l 1

Page 2 of 2 02-24-82 l

DOSE EQUIVALENT FACTORS AND MPC's FOR VARIOUS NUCLIDES DOSE EQUIVALENT MPC - AIR MPC - WATER NUCLIDE FACTOR UNRESTRICTED UNRESTRICTED H-3 6.4 E + 0 2E-7 3E-3 Kr-85 8.8 E - 2 3E-7 Kr-85m 5.2 E + 0 1E-7 Kr-87 5.2 E - 3 2E-8 --

Kr-88 6.1 E + 1 2E-8 -

Xe-131m 1.1 E + 1 4E-7 Xe-133 1.0 E + 0 3E-7 Xe-133m 1.1 E + 0 3E-7 Xe-135 8.4 E + 0 1E-7 Mn-54 7.0 E + 2 1E-9 1E-4 Mn-56 1.9 E + 2 2E-8 1E-4 Fe-59 1.6 E + 3 2E-9 5E-5 Co-58 7.7 E + 2 2E-9 9E-5 Co-60 2.0 E + 3 3 E - 10 3E-5 Cr-51 3.3 E + 1 8E-8 2E-3 Sr-89 1.6 E + 4 3 E - 10 3E-6 Sr-90 1.7 E + 4 3 E - 10 3E-7 Sr-91 2.9 E + 2 9E-9 5E-5 .

Zr-95 1.4 E + 3 1E-9 6E-5 Mo-99 1.0 E + 2 7E-9 4E-5 Ru-106 9.1 E + 3 2 E - 10 1E-5 Te-132 3.9 E + 2 4E-9 2E-5

? Cs-134 5.1 E + 3 4 E - 10 9E-6 Cs-136 9.1 E + 2 6E-9 6E-5

, Cs-137 2.8 E + 3 5 E - 10 2E-5

) Ba-140 2.0 E + 3 1E-9 2E-5 1

Ce-144 8.6 E + 3 1E-5 2 E - 10 __

t

. . I-131 1.0 E + 0 1 E - 10 3E-7 t

.I-132 3.8 E - 2 3E-9 8E-6 i

s

-- ~ --.~ . .-....%.., . . . . . . . . ..

y - - -