Partially Deleted Ltr Responding to Concerns Raised on 910415 Re Administrative Control Procedures & Preventive Maint.Allegations & Actions Encl
ML20044C319
Person / Time
Issue date: 08/14/1991
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
AFFILIATION NOT ASSIGNED
Shared Package
ML16266A160 List:
References
FOIA-92-162 NUDOCS 9303220178
Download: ML20044C319 (5)


Text

r.

y S UG 14 1331 gggp iTi gmu-

%w; pag;{gg h$h &n_3 j ' $,~ g v,,

ssj i

1 DearN W @ o.z +%

L

-u,.

x This letter refers to three issues that you provided to us on April 15,1991, including problems with administrative control procedures, OSHA concerns, and preventive maintenance.

We will We have initiated action to respond to these concerns as indicated in the enclosure.

keep you informed of the findings from the reviews of these issues.

We appreciate you informing us of your concerns. Should you have any further questions, or if I can be of further assistance in these regards, please call me collect at (215) 337-5225 Sincerely, O!D:is GEECd 2f Edward Wenzinger, Chief Reactor Projects Branch 4

Enclosures:

As stated d

ic:m:E:n in this RCCd i M diT2 jn ::.:ynnte c.ith i'.c i:EQ lawa2n

~ ~ ~ ~ ~ ~

Att. O.emPt 35 9303220178 921217 F09. 73 ~/46 #

l fj k f

PDR FOIA HUBBARD92-162 PDR I

.i s.

s.o I

l 2

SNG 1 1991 t

bec:

Allegation File, RI-91-A-0070 E. Conner T. Shedlosky W. Raymond E. Kelly

/

EG&G Idaho Representative (KIDO) i e

i i

'l

'i i

k I

I I

i i

i 1

t l

I concurrences:

i RI:DRP 1:DRP RI:DRP RI:DRP 80' Conner St an Kell

( Wennnger If f I

[ljl{

l l6tf,f/

)

I 1

~...

. - - - - ~ =.

... ~.

. ~.

A'

  • E

'g UNt1ED STATES NUCLEAR REGULATORY COMMISSION g

' [-

REGION 1 I

47s ALLENDALE ROAD e

KING oF PRUSSIA. PENNSYLVANIA 1M5141s.

AUG 141990 L

t This letter refers to three issues that you provided to us on April 15,1991, including proble with administrative control procedures, OSHA concerns, and preventive maintenance.

We have initiated action to respond to these concerns as indicated in the cnclosure. We

~

l keep you informed of the findings from the reviews of these issues.

l We appreciate you informing us of your concerns. Should you have any further que if I can be of further assistance in these regards, please call me collect at (215) 337-5225l i

i Sincerely, r-d ward enzinger, Chi l

Reactor 'rojects Branch 4 f

Enclosures:

As stated 9

I I

1

.i l

l 6

l I

i j

OA 53 this itic;j Q;-, g g.

Act,cu z;y~~a=e wn ne 7:ps..f.lini:r;;131 ion yy IDIA. R },f~~~~ ~ ~

lf D

B

?

AUG 1s 1991 2

.I bec:

Allegation File, RI-91-A-0070 3

E. Conner T. Shedlosly W. Raymond E. Kelly EG&G Idaho Representative (KIDO) i h

I i

i i

t i

r r

I P

P i

h b

i

~

e ENCLOSURE ALLEGATIONS AND ACTIONS Issue 70-1:

j During a recent condenser backwashing evolution on April 12-13, 1991 the "C" circulating water pump was tripped by operators. Concurrently, the "D" circulating water pump inadvertently tripped. A plant incident report was not written describing this event. In addition. During the past refueling outage (October 1990) a similar event occurred with no 3

subsequent plant incident report.

Action:

This issue has been referred to the licensee for their review and action. You will be informed of the results.

Issue 70-2:

The NRC is not properly addressing OSHA concerns about inadequate work space around several electrical panels.

1 Action:

This issue has been referred to the OSHA Region 1 Liaison for review and action.

Issue 70-3a:

Charging pump "A" is a Category I EEQ component. However, the junction box, containing the electrical connections to the motor, did not have a cover gasket. This condition is not in compliance with acceptable EEQ configurations.

Action:

1 This was not substantiated by our review. However, since the junction box utilizes qualified EEQ splices within the box, the issue has no safety implications, and is therefore closed.

Issue 70-3b:

It was noted, during a preventive maintenance on the spare boric acid pump motor located in the warehouse, that the motor heaters were not energized to keep the windings at least 5 degrees F above ambient as is required on the PM card.

Action:

This issue has been referred to the licensee for their review and action. You will be informed of the results.

,