Monthly Operating Rept for Feb 1993 for Vermont Yankee Nuclear Power Station.W/930310 Ltr
ML20044C120
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/28/1993
From: Reid D, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
BVY-93-027, BVY-93-27, VY-RCE-93-010, VY-RCE-93-10, NUDOCS 9303180111
Download: ML20044C120 (6)


Text

. - _ - _ - _ - _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ._

,> . i

' 'l- VERMONT YANKEE NUCLE'AR POWER CORPORATION F-y' ') P.O. Box 157, Governor Hunt Road

' Vernon, Vermont 05354-0157 O-

\

,f \ (802) 257-7711 l March 10,1993 VY-RCE-93-010 BVY 93-027 'l U.S. Nuclear Regulatory Commission L Washington, D.C. 20555 Attn: Document Control Desk Refemnce: a) License No. DPR-28 (Docket No. 50-271)

Dear Sir:

Submitted hemwith is the Monthly Statistical Report for the Vermont-Yankee Nuclear Power Station for the month of February 1993.

Very truly yours, Vermont Yankee Nuclear Power Corporation Donald A. Reid Vice Pmsident, Operations cc: USNRC, Region I USNRC Resident Inspector, VYNPS DP 0411 Rev. 4 Page1 of1 i

DR hk' O hk. U g PDR

1.

p l'

i '.

l L

1-j VERMONT YANKEE NUCLEAR POWER STATION MONTIILY STATISTICAL REPORT 93-02 FOR TIIE MONTII OF FEBRUARY 1993 1

l l

DP 0411 Rey, 4.

Page'I of1-

_ - _ _ _ _ - _ _ _ - = - =

OPERATING DATA. REPORT DOCKET NO.50-271 DATE 930310 COMPLETED BY G.A. WALLIN TELEPHONE (8021257-7711 DPERATING STATUS

1. Unit Name: Vermont Yankee
2. Reporting Period: Februarv NOTES: l
3. Licensed Thermal Power (MWt) :1593
4. Nameplate Rating (Gross MWe) : 11Q
5. Design Electrical Rating (Net MWe) : 514 (oc) 504(cc)
6. Maximum Dependable Capacity (Gross MWe) : 135
7. Maximum Dependable Capacity (Net MWe): EQi n
8. If changes, occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any(Net MWe) : N/A
10. Reasons for restrictions, if any: -N/A This Month -Yr-to-Date Cumulative
11. Hours in Reporting Period 672.00 1416.00 177480.00 -
12. Number Of Hours Reactor was Critical 672.00 1416.00 345612.35
13. Reactor Reserve Shutdown Hours 0.00 0.001 0.00
14. Hours Generator On-Line 672.00 1416.00. 142670.64~
15. Unit Reserve Shutdown Hours 0.00 0.00. O '. 0 0 '
16. Gross Thermal Energy Generateu tMWH) 1065677.00 2249810.50"212320876.50
17. Gross Electrical Energy Generated .

359270.00 759189.00 70744347.00

18. Net Electrical Energy Generated (MWH) 345437.00 729954.00.-67204829.00 7
19. Unit Service Factor 100.00 100.00 79.62-
20. Unit Availability Factor 100.00 100.00 79.62:
21. Unit Capacity Factor (Using MDC Net) 101.99 102.28- 74.42-
22. Unit Capacity Factor (Using DER Net) 100.01 100.29 72.972
23. Unit Forced Outage Rate 0.00 0.00 5.14
24. Shutdowns scheduled over next 6 months (Type, Date, and Duration-of-Each: N/A
25. If shut down.at end of. report period, estimated date.of:startup:N/A
26. Units In Test Status (prior'to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION VYDPF 0411.01 DP 0411 Rev. 4 Page11 of 1

.RT.No. 13.F01.19F

AVERAGE DAILY UNIT POWER LEVEL

+- DOCKET NO. 50-271 j' UNIT Vermont Yankee DATE 930310' COMPLETED BY G.A. WALLIN TELEPHONE (802)257-7711 ]

MONTH Februarv j

t. .

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL-r (MWe-Net) (MWe-Net) i

1. 516 17, 517
2. 516 18. 516 .3
3. 516 19. 516 1
4. 516 _ _ . 20. 516 j
5. 516 21. 515 -

C. 516 22. 516

7. 516 23. 516
8. 516 '24. 516

~

9. 459 25. 516
10. 516 2 6.- 516
11. 516 27. 515
12. 516 28. 516 f13. 516 29. __
14. 516' 30. ---

l

15. 516 31. ---
16. 517 _

INSTRUCTIONS:

~On this format, list the average daily unit' power level in'MWE-Net-

for each day in the reporting month. Compute to the nearest whole

! megawatt'.

VYDPF 0411.02

.DP-0411 Rev. 4

' Page 1 of 1 RT No. 13.F01.18V FIObr .

a'

. Ql [.

mY' , . '

e e e '

1 e sase e k v I ntnl c n n 7 i e oaei r

. a i 7 tt ag iDcF u Y l - cn n t i o l 7 a5 ee 'd a cfL) S t

1 n 0 W 2 rv re nh uo R 7 o 1 ac r rE e

) or x tnoL m 2 m 3

- r 0 A 0 2 CP ,E sof( a e g ni S 0 e 3 . 9 doc nn Itst) 5V 9G

( ir ntn atr1 -

a e te - reo6 OEEYE nr st G a e p1 I NMTBN eor et ph e 0 AA O siu ta teSR- t TNDuH utc P ir G i E - sP ace V b P yt E b KT E CAR Id rnR CI ON uL So i

hrteU i

h LE MR xonvN x DU PT EfEE( E M

O t 4 5 C n D e

n O

R m) an 5o N ri pe md O

C mca aSl oo r p CC ccx SiE t(

m lla 4te e B R

aamr uuoe e sd  : nnth g yo daaut n S SC oMMAO a N h h O # t - - - - c I e e x T s t M1234 E C ntr A -

U eno cep

/ 3 n D N r E Y ive e R R LER t A ) ) t R U n na E R f n i iP W B g o a a on .o O E .r ri l ld P F di et p .n po ot t 4wc x od xR D 3htnc ou E i n E N H' tuwa .Pd ( t tan ( l A T ehoe e c o o N MSDR R ees .i gi rr S O rT rnt ot u

tia rn N M N

0 T n

o lr . snnero

  • i o eiivEC 5 v R s H a Rami i O 2a Fe ratl-u P e c yTxaa 9 9

h E R tngr Ern) e S R nanor . ton M enitoesii q

=

T n) y nelatsita I os 0  : pt el a n n al si 1

N ir 0' ni n u u r ei r p 13 U

i tu . o uif ge c m e x ao 0 s q a e e pi d pE aEMRROLAO(.

e rh .-

g g

u( e- - - - - '- -

i y

D RABCDE FGH

+

2' e

1p S e y y g

e T d e

s 4

u I

e 9 . l 3 W

0 du 0 .

e 2 ed .v1.

y d'

t 0 ce 1e a

w 3 rh 1Rf U D 9 oc 4 o FS 01 - M w

1 11 0  : : ..F4

. - FS P0e o 3 D g 2

N 9 YPa  %

1 .VDP

- u g

=

91

?:

c ..-

DOCKET NO. 50-271 DATE. 230310

' COMPLETED BY G.A. WALLIN '

  • - ~

TELEPHONE -(802)257-7711 REPORT MONTH Februa rv  ;

fBRC4ARY OF OPERATING EXPERIENCES  !

~

Hiqhlights  !

.i

. Vermont Yankee operated at 99.5% of rated thermal power'for the. month. .I Gross . electrical genera, tion was 359.270 MWHe or 99.0% design electrical.  !

capacity.  !

t Operatino Summary The following is a chronological description of plant operations including  !'

other pertinent items of interest for the month:

At the beginning of the reporting period the plant was operating at=99.9% l of~ rated thermal power.

930209 At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />, initiated a power reduction to perform surveillance testing and a rod pattern exchange.

t 930209 At 0335 hours0.00388 days <br />0.0931 hours <br />5.539021e-4 weeks <br />1.274675e-4 months <br />, initiated MSIV full closure testing. (See Unit-Shutdowns and Power Reductions) 1 i

930209 At 0405 hours0.00469 days <br />0.113 hours <br />6.696429e-4 weeks <br />1.541025e-4 months <br />, initiated a control rod pattern exchange. (See-  !

Unit Shutdowns and Power Reductions) .

.k 930209 At 0555 hours0.00642 days <br />0.154 hours <br />9.176587e-4 weeks <br />2.111775e-4 months <br />, completed the rod pattern exchange. 3 i

930209 At 0815 hours0.00943 days <br />0.226 hours <br />0.00135 weeks <br />3.101075e-4 months <br />, completed MSIV full closure testing, and began'. L, a return to full power.  !

1 i

i I

t At the~end of the reporting period the plant was operating at 99.9t'of. l

rated thermal. power.

VYDPP 0411.04  !

'DP 0411 Rev. 4 Page 1 of 1 _

RT No. 13.F01.18X_  ;

.