IR 05000245/1990006

From kanterella
(Redirected from ML20042E280)
Jump to navigation Jump to search
Operator Licensing Reexam Rept 50-245/90-06 (OL) on 900320. Exam Result:Senior Reactor Operator Passed Operating Reexam
ML20042E280
Person / Time
Site: Millstone 
Issue date: 04/05/1990
From: Conte R, Todd Fish
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20042E277 List:
References
50-245-90-06OL, 50-245-90-6OL, NUDOCS 9004200519
Download: ML20042E280 (4)


Text

F.

.

,

.

.

.

U.S. NUCLEAR REGULATORY COMMISSION

,

REGION I

OPERATOR LICENSING RE-EXAMINATION Report No.

50-245/90-06(OL)

Docket No.

50-245 License No.

NPF-21 Licensee:

Northeast Nuclear Energy Company P. O. Box 270 Hartford, Connecticut 06141-0270 Facility Name:

Millstone Unit One Examination Date:

March 20, 1990 Examiner:

Todd Fish, Senior Operations Engineer Chief Examiner:

Edtk fh '

90 Todd H. Fish. Senior Operations Gngineer D&td

.

BWR Section, Operations Branch, DRS Reviewed by:

+i -

er?

N Richard J. Cont OperationsBranc@h,DRShief, BWR Section,Date Summary:

An operating (simulator section only) re-examination was administered to one

,

senior reactor operator (SRO) who had failed this section of the initial requalification exams which were administered during the week of October 19, 1989. The SRO passed this portion of the re-examination.

i

?

I l

l 9004200519 900409 PDR ADOCK 05000245 ll V

PNV

.

.

.

'.,

,

'

.

.

Report Details 1.

Introduction During the examination. period,'the NRC examiner conducted a requalification -

re-examination of one senior reactor. operator (SRO) at Millstone Unit One..

The examiner used the process and criteria in NUREG 1021, " Operator Licensing Examiner Standards," specifically, ES-601, " Administration of NRC Requalification Program Evaluation," Revision 5, dated January 1,1989.

Personnel attending the entrance and exit meetings are listed in Attachment 1.

2.

Individual Examination Results The SRO passed the operating (simulator section only) portion of the re-examination. This was the only area he had failed as a result of requalification exams administered in October 1989.

3.

Exit Interview An exit interview was held on March 20, 1990 following the administration of the examination. The licensee representatives that attended the meeting are listed in Attachment 1 of this report.

Details of the exam were discussed.

..

i I

-.

_,

c

+.

, n;

.

,

-

9-

..-

e ATTACHMENT 1-L h

Persons Contacted Durino Re-Examination 1.-

Millstone Unit One-R. Palmieri, Manager, Operations, MPI.

.

(1,2)

R. Lueneburg, Supervisor, Operator Training, MPI (1,2)

G. Sturgeon, Program Coordinator, Operator Training, MPl.

(1,2).

M. -Jensen, Assistant Supervisor Operater Training. MPI (1,2).

C. Tabone, Instructor, Operator Training, MPI

'(2)

2..

U.S. Nuclear Regulatory Coiamission T. Fish, Senior Operations Engineer (1, 2).

<

Notes:

(1) 'Present during entrance meeting on March 19. 1990 (2) Present during exit meeting on March 20, 1990

.

.

-

.,

,,

,

v

-

v ryu 4 -, ' -

,

.

,

,

,

<

- : < :

7<

.,

,

Ne,

'

'

'

...:,

- -,

,4+-

,

'

-

-)--

a._

..

.,

'

-

..

.

..,

,

' ATTACHMENT 2-

-

-

'

s.

,

"

- REQUALIFICATION EXAMINATION TEST!!TEMS'

-

.

SCEN.: NO.

"SIMULATORSCENARIOl

-

. SES-01

LNP with' G/T 'andl Iso.Cond Failure

,

- SES-04-

_ Failure of-Rods to. Insert on Rx Scram'-

= '

-

'. 'i -

~

..

t 0.?

t

.-

(.,

!

y n

d

'

).,

'

$

s.,

l--

r a~-

~~

<

.

_

.u

-

t

$_-.

r

,n

~

y