Text
..
1 UNITED STATES OF AMERICA af)'
NUCLEAR REGULATORY COMMISSION 3
4 INVESTIGATION OF 5
DIABLO CANYON UNITS 1 & 2 6
INTERVIEW OF PHILIP A.' CRANE, JR.
8 9
Pacific Gas and Electric Headquarters Offices Law Department Conference Room 11 77 Beale Street San Francisco, California 12
- Monday, 13 December 21st, 1981
('
14 15 The above-entitled matter-came on for' hearing,-
16 pursuant to notice, at 2:45 p.m.
17.
l APPEARANCES:
18 i
On behalf of the NRC Staff:-
t I
19 OWEN C. SHACKLETON, JR., Moderator l
B.H.
FAULKENBERRY
.l 23 J"
21 22 23 24 25 9W 8202010270 820127 h~ '
-414 PDR ADOCK 05000275
~
G PDR
4 t'
4 2
ERRATA SHEET l'
Interview of Philip A. Crane, Jr... December 21, 1981 l'
1 The following corrections should be made:
1 Page 417 Line 25 - Change Engelkin to Engelken.
i Page 418 Line 1 - Change Engelkin to Engelken.
I The above corrections were identified by Owen C. Shackleton, Jr.
i 4
f 1
1 e
4 1
e 1
-415-e 4
,v.
c,-,-m_,
-1 PRQqEEpIQgg 2
2:45 p.m.
3 MR. SHACKLETON:
On the record.
This is December 21, 1981 and the time is 2:45 p.m.
4 5
This is an interview of Mr. Philip A. Crane, Jr., Assistant General Counsel for the Pacific Gas and 6
Electric Company.
7 This interview is taking place in room 8
3101, the corporate headquarters of Pacific Gas and 9
Electric Company, at 77 Beale Street, San Francisco, 10 California.
jj The purpose of this interview of Mr. Crane 12 is part of the investigation being conducted by the U.S.
13 Nuclear Regulatory Commission to develop the facts and 14 the happenings surrounding the present reverification program of-15 the seismic design of the Diablo Canyon Nuclear Power Plant..
16 In addition to Mr. Crane being present, from the g
U.S. Nuclear Regulatory-Commission, Region 5, the questionning 18 a
3 will be done by Mr. Bobby H.
Faulkenberry, Chief of Reactor jg ai Construction Projects Branch.
20 g
d My name is Owen C. Shackleton, Jr. and I am 21 3
E a senior investigator with the commission.
23 Mr. Crane, before we went on record, I discussed 24 with you your right to have personal legal counsel present i
25 if you so desire.
Do you waive that right?
-416-
ne 1
MR. CRANE:
Yes, I do.
2 MR. SHACKLETON:
Thank you.
{ g, 3
Would you please rise for the oath?
4 Whereupon, 5
PHILIP A. CRANE 6
having been first_ duly sworn, was called as a witness herein 7
and was examined and testified as follows:
8 MR. SHACKLETON:
Please be seated.
9 Mr. Crane, do you also understand sir, that to we are requesting of each person being interviewed during 11 the course of this interview, the course of this investiga-12
-tion to keep the information of their testimony confidential?
13 MR. CRANE:
Yes, I understand that.
14 MR. SHACKLETON:
Thank you.
15 Now, Mr. Faulkenberry, I'll turn the Lquestionning 16 over to you.
I 17 MR. FAULKENBERRY:
Mr. Crane, would you please g
18 state'for the record your position with the Pacific Gas i
j 19 and Electric Company?
l i
'E 20 MR. CRANE:
I'm one of the Assistant General a
l 21 Counsel and I'm in charge of one of the four sectionsnof the s:
22 law department which includes the nuclear licensing.
23 MR. FAULKENBERRY:
Mr. Crane, did you sign the 24 letter which I show you here dated November 18th, 1981 C
25 to Mr.
R.H.
Engelkin, Director of the NRC Region 5 office f
-41 7-l l
t 1
which transmitted to Mr. Engelkin the draft report entitled q g 2
Preliminary Report Seismic Reverification Program, dated 3
November 12th, 1981.
4 MR. CRANE:
I have no-independent recollection 5
of actually signing this letter.
6 I sign a number of letters of transmittal to 7
the commission as a part of my normal duties.
8 I note that the letter is dated November 18th, 9
and I know that on that date I was travelling back to 10 Washington, D.C.
to attend a congressional hearing and 11 an oral argument so I can only asstme that I or presume 12 that I did sign the letter, but I have, as I said, no 13 independent recollection, k,,,
1-4 MR. FAULKENBERRY:
Mr. Crane, if you were not 15 here on the-18th, and could not have signed it on the 18th, 16 if you had signed it, would you give us an indication of I
17 the only available dates that you were here and which-18 dates you possibly could have signed it?
j 19 MR. CRANE:
Well, I was here on-November 17th ii 20 and I could-have signed the letter then and I was not in s
[
21 the office until the 23rd but if I was presented with the l'
22 letter on the 23rd for signature, I would have normally 23 assuming I noticed it, I would-have had them change the 24 date.
d 25 So from that, I assume I must have signed it on
-418-
~
- = - -
I the 17th.
2 MR. FAULKENBERRY:
Mr. Crane,.do_you have any (pg
?
3 way of knowing or do you have any idea what dates the 4
letter was actually placed in the mail, that is, what 5
date it actually left the PG&E offices?
i 6
MR. CRANE:
No, I do not.
7 MR. FAULKENBERRY :
Thank you, Mr. Crane.
8 That's the extent of the questions I have.
i 9
Owen, do you have anything to add?
H)
MR. SHACKLETON:
No, I have no further questions.
11 Mr. Crane, do.you have any re-discussion you want to make 12 or any further comments you'd like to make?
4 13 MR. CRANE:
I might add that tnis distribution
('
14 was not handled by my secretary, but it was handled i -
15 by the nuclear power operations group.
93 MR. SHACKLETON:
Is that located on another S
17 floor in the building?
8 18 MR. CRANE:
Yes, it's located on the 14th j
19 floor.
)
a
[
MR. SHACKLETON:
All right, thank you.
20 3
d I have no further questions.
Bobby?
21 i
This will be the end of this interview.
~
22 We'll go off record.
The time is now 2:50 p.m.
23 (Whereupon, at 2:50 p.m.,
the interview of
^
24 Philip A. Crane was concluded.)
25
-419-
I UNITED STATES OF AMERICA 2
NUCLEAR REGULATORY-COMMISSION 3
INVESTIGATION OF 4
DIABLO CANYON UNITS 1 & 2 5
INTERVIEW OF 6
-PHILIP A. CRANE 7
8 9
Pacific Gas & Electric Headquarters Offices 10 Law Department Conference Room 1
77 Beale Street 11 San Francisco, California 12
- Monday, December 28, 1981
'13
- k..
14 The above-entitled matter came on for further 15 hearing, pursuant to notice at 2:43 p.m.
16 APPEARANCES:
17 j
On behalf of the NRC Staff:
l 18 OWEN C.
SHACKLETON, JR., Moderatcr B.
H. FAULKENBERRY g
19 3
j 20 ij 21 2
f.
22 2
l 23 24 25
-420-
ERRATA SHEET
. Interview of Philip A. Crane, Jr., December 28, 1981 No corrections were identified in Mr. Crane's testimony for December 28 1981, by review of Owen C. Shackleton, Jr.
I l
-421-
1 PRQQEEQlgEE 2:43 p.m.
2 3
MR. SilACKLETON:
This is December 28, 1981, 4
and the time is 2:43 p.m.
This is a continuation of the interview of 5
6 Mr. Philip A. Crane, Jr., Assistant General Counsel for 7
the Pacific Gas and Electric Company.
Present to conduct this interview in g
9 addition to Mr. Crane being present from the U.S. Nuclear Regulatory Commission, Region 5, is Mr. Bobby 11. Paulkenberry, 10 Chief of Reactor Construction Projects Branch and ij my name is Owen C.
Shackleton, Jr., Senior Investigator.
12 Mr. Crane, you understand, sir that you are 13 l
still under oath as was administered on the 21st of g
December?
15 MR. CRANC: Yes, I do.
16 17 Whereupon,
=
18 PIIILIP A. CRANE g
19 having been previously duly sworn, was recalled as a a
j 20 witness herein and was examined and testified as follows:
a MR. SIIACKLETON Mr. Crane, we understand 21 d
22 that you have some additional information to assist the t
Commission in obtainining the facts in this investigation.
23 Would you go ahead and furnish that information, l
24 l
P ease?
25 k.,
-422-l
[
(N 1
MR. CRANE:
Yes.
After the interview last 2
week, I went back to the people.who handled the mailing 3
and I said do you happen to have a copy of the letter 4
of transmittal as it was manually signed and indeed they 5
did.
6 And,-they gave me a copy which I furnished to 7
you people and the letter of transmittal was signed 8
by my secretary on my behalf and according to the people 9
o n the 14th floor, that letter to Mr. Engelken was actually 10 m ailed on the 18th.
11 The rest of the service list was not served 12 until'-- they can't remember whether it was Friday or 13 the following Monday.
(.
14 MR. SIIACKLETON:
Do you h'.ve any additional-15 questions, Bobby?
16 MR. FAULKENBERRY:
No.
17 MR. SIIACKLETON:
Mr. Crare, is there
-I j
18 anything further you'd like to state?
1 g
19 MR. CRANE:
No, thank you, t
j 20 MR. SilACKLETON:
At this time, I have no 21 additional questions so we will go off record.
The time a
f 22 is now 2:44 p.m.
t l
23 (Whereupon, at 2:44 p.m.,
the interview of 24 Mr. Philip A. Crane was concluded.)
25
-423-n.
.-_