IE Insp Repts 50-321/81-31 & 50-366/81-31 on 811021-1120. No Noncompliance Noted.Major Areas Inspected:Tech Spec Compliance,Housekeeping,Operator Performance,Overall Plant Operations & QA Practices
ML20039B626
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/03/1981
From: Brownlee V, Rogers R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20039B616 List:
References
50-321-81-31, 50-366-81-31, NUDOCS 8112230319
Download: ML20039B626 (4)


See also: IR 05000321/1981031

Text

"

'

.p reioq

't

UNITED STATES

h,

v

!

NUCLEAR REGULATORY COMMISSION

o

g

c

REGION II

o,,

101 MARIETTA ST., N.W., SulTE 3100

ATLANTA, GEORGIA 30303

o

, , , * * * * *

i

Report Hos. 50-321/81-31 or.d 50-366/81-31

Licensee: Georgia Power Company

270 Peachtree Street

Atlanta, GA 30303

!

Facility Name:

Hatch 1 and 2

)

Docket Nos. 50-321 and 50-366

License Nos. DPR-57 and NPF-5

1

.

Inspection at Hatch site near Baxley, Georgia

Inspector: [ wNthe

/4/?/r/

Re F. Rogers

(/;/

/

v

Date Signed

/z./5///

Approved by:

C_

h

V'. L. Brownlee, Se/cgion Chief, Division of

Date Signed

Resident and Reactor Project Inspection

SUtti;ARY

Inspection on October 21 - November 20, 1981

Areas Inspected

This inspection involved 110 inspector-hours on site in the areas of Technical

Specification compliance, housekeeping, operator performance, overall plant

operations, quality assurance practices, station and corporate management

practicas, corrective and preventive maintenance activities, site security

'

procedures, radiation control activities, surveillance activities, IE Bulletins

and Circulars, and Tf11 Task Action items.

Resul ts

Of the 12 areas inspected, no violations or deviations were identified.

Ohd9fjfggy

o

PDR

--

_ -

-

.

-

.

.

1

.,

.

2

i

DETAILS

i

j

1.

Persons Contacted

Licensee Employees

!

l

  • M. fianry, Plant fianager

!

  • T. Greene, Assistant Plant flanager

~

  • C. T. Jones, Assistant Plant fianager

,-

S. Baxley, Superintendent of Operations

R. Nix, Superintendent of flaintenance

  • C, Coggins,. Superintendent of Engineering Services

W. Rogers, Health Physicist

  • C. Belflower, QA Site Supervisor

!

Other licensee enployees contacted included technicians, operators,

i

mechanics, security force members, and office personnel.

'

  • Attended exit interview

i

2.

Exit Interview

The inspection scope and findings were summarized on November S and 20,

,

1981, with those persons indicated in paragraph 1 above.

4

3.

Licensee . Action on Previous Inspection Findings

Not inspected.

4.

Unresolved Items

1

Unresolved items were not identified during this inspection.

5.

Plant Operations Review (Units 1 and 2)

!

The inspector periodically during the inspection interval reviewed shift

!

logs and operations records, including data sheets, instrument traces, and

records of equipment malfunctions. This review included control room logs

'

and auxiliary logs, operating orders, standing orders, jumper logs and

equipment tagout records. The inspector routinely observed operator

alertness and demeanor during plant tours.

During normal events, operator

performance and response actions were observed and evaluated. The inspector

l

conducted random off-hours inspections during the reporting interval to

assure that operations and security remained at an acceptable level.

Shift

'

-

'

l

turnovers were observed to verify that they were conducted in accordance

l

with approved licensee procedures.

Within the areas inspected, no violations or deviations were identified.

l

.

- - , _ .

-

.

.

.

.

- - -

- .

. . -

-

. .

..

.

_

..

.,

2

6.

Plant Tours (Units 1 and 2)

The inspector conducted plant tours periodically during the inspection

i

interval to verify that monitoring equipment was recording as required,

l

equipment was properly tagged, operations personnel were aware of plant

conditions, and plant housekeeping efforts were adequate.

The inspector

also determined that appropriate radiation controls were properly

l

established, critical-clean areas were being controlled in accordance with

procedures, excess equipment or material is stored properly and combustible

material and debris were disposed of expeditiously.

During tours the

inspector looked for the existence of unusual fluid leaks, piping vibra-

tions, pipe hanger and seismic restraint settings, various valve and breaker

,

positions, equipment caution and dar.ger tags, component positions, adequacy

of fire fighting equipment, and instrument calibration dates.

Some tours

were conducted on backshifts,

j

Within the areas inspected, no violations or deviations were identified.

7.

Technical Specification Compliance (Units 1 and 2)

During this reporting interval, the inspector verified compliance with

selected limiting conditions for operations (LCO's) and results of selected

'

surveillance tests. These verifications were accomplished by direct

observation of monitoring instrumentation, valve positions, switch

positions, and review of completed logs and records.

The licensee's

compliance with selected LC0 action statements were reviewed on selected

a.

occurrence as they happened,

)

Within the areas inspected, no violations or deviations were identified.

i

8.

Physical Protection (Units 1 and 2)

i

The inspector verified by observation and interviews during the reporting

'

interval that measures taken to assure the physical protection of the

facility met current requirements. Areas inspected included the organi-

<

zation of the security force, the establishment and maintenance of gates,

door and isolation zones in the proper condition, that access control and

badging was proper, and procedures were followed.

Within the areas inspected, no violations or deviations were identified.

.

9.

NRC Task Action Plant Requirements Review (NUREG 0737) (Units 1 and 2)

,

The inspector has reviewed the licensee implementation of various require-

ments associated with the NRC Task Action Plant (TAP) in response to the

'

!

Three title Island accident. The current status is summarized below.

Item

numbers refer to TAP line items.

i

- - .

.

-

.

-

. .

..

.---

-

.

- ..

.

.

  1. .

.

3

4

i

Item No.

Description

NUREG 0737

Completed

'

j

Action Date

!

II.D.1.2.b

Licensee

1/1/82

Yes

Submittal

,

II.K.3.30.a

Licensee

11/15/80

Yes

i

Submittal

10. Followup on IE Bulletins nd Circulars (Units 1 and 2)

i

For the following IE Bulletirs and Circulars, the inspector verified that

the response, if required, xns timely, included the required information,

,

contained adequate commitmnts and that corrective action as described in

{

the written responses was completed or scheduled for completion.

For

circulars, the inspector verified that the circular was received, reviewed,

and appropriate cor rective action taken or planned.

These Bulletins and

j

Circulars are addressed as they are issued and summarized below for record

,

a

purposes,

i

j

3.

IE Bulletins

!

}.

IEB 79-13 (Closed) Cracking in Feedwater Systeia Piping

!

IEB 79-17 (Closed) Pipe Cracks in Stagnant Barated Water Systems

'

IEB 79-21 (Closed) Temperature Effects on Level Measurements

i

IEB 80-04 (Closed) Analysis of a PWR Main Steam Line Break with

Continued Feedwater Addition

!

,

l

IEB 80-12 (Closed) Decay Heat Removal System Operability

IEB 80-17 (Closed) Fuel Pin Damage Due to Water det from Baffle Plate

i

Corner

b.

IE Circulars

i

IEC 79-08 Attempted Extortion Low Enriched Uranium

IEC 79-22 Stroke Times for Power Operated Relief Valves

i

i

<

. , . - - ,

- , _ _

e

-

.m

. -, .

, , .

.~,.--s

..--.

__

x

, _

_,__-._,,,-,...y-

, _

. - . _

. - , _ - .