3
- ~
ATTACHMENT A Revise the Technical Specifications as follows:
Remove Paaes Insert Paaes.
2-4 2-4 2-8 2-8 2-10 2-10 3/4 2-14 3/4 2-14 3/4 3-6 3/4 3-6 3/4 3-8 3/4 3-8 i
-l i
i i
r I
i 1
1 i
9004240472 900416ADOCK0500ggg2 PDR P
-j 1
TABLE 2.2-1 p
- g; REACTOR TRIP SYSTEM INSTRUNENTATION TRIP SETPOINTS x
FONCTIONAL UNIT ALLOWANCE (TA)
Z S
TRIP SETPOINT ALLOWABLE VALUE h
1.
Manual Reactor Trip M.A.
N.A.
N.A.
N.A.
N.A.
h 2.
Power Range, Neutron Flux g
a.
High Setpoint 7.5 4.56 0
5 109% of RTP*
1 111.1% of RTP*
N b.
Low Setpoint 8.3 4.56 0
<25% of RTP*
<27.1% of RTP*
3.
Power Range, Neutron Flux,
- 1. 6 0.50 0
< 5% of RTP* with
< 6.3% of RTP* with High Positive Rate i time constant' i time constant 1 2 seconds 1 2 seconds 4.
Power Range, Neutron Flux, 1.6 0.50 0
< 5% of RTP* with
< 6.3% of RTP* with
. p High Negative Rate i time constant a time constant g
1 2 seconds 1 2 seconds oa j
5.
Intermediate Range, 17.0 8.41' O
1 5% of RTP*
1 30.9% of RTP*
2 g
Neutron Flux
'6.
Source Range, Neutron Flux 17.0 10.01 0
$ 105. cps 5 1.4 x 105 cps 7.
Overtemperature AT M /. O
-5de-f 10 See Note 5 See Note 1 See Note 2 l,
8.
Dverpower AT 4,4-. </.9 4:48./.7/ -4,73./.'ff See Note 3 See Note 4 l
9.
Pressurizer Pressure-Low 3.1 0.71 1.67 1 1945 psig***
1 1935 psig***
10.
Pressurizer Pressure-High 6.2 4.96 0.67 5 2375 psig i 2383 psig
- 11. Pressurizer Water Level-High 8.0
'2.18 1.67 s 92% of instru-1 93.8% of instru-ment span ment span 12.
Loss of Flow 2.5
-E-91/.,3y 0.60
> 90% of loop-of luop l
design flow **
design flow **
- = PaTE0zTHERNAL POWER
~
- Loop design flow = 88,500 gpm
- Time constants utilized in the lead-lag controller for Pressurizer Pressure-Low are 2 seconds for lead and 1 second-for-Tag.
Channel calibration shall ensure that these time constants are adjusted to those values.
i m
~
TABLE 2.2-1 (Continued)
,m E
S REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS NOTATION (Continued)
T
=
Average temperature. *F; 1
Lag compensator on measured T
=
- 1+r5 ay g
6 U
Time constant utilized in the measured T,,9 lag compensator, 16 = 0 s; T
=
6 eu T'
=
5 576.2'F (Nominal T,,g at RATED THERMAL POWER);
K
=
3
- 0. M 2; P
=
Pressurizer Pressure, psig; P'
2235 psig (Nominal RCS operating pressure);
=
O S
=
Laplace transform operator, s~1; N
and f (AI) is a function of the indicated difference between top and bottom detectors of the power-range in y
'h nuclear ion chambers; with gains to be selected based on measured instrument response during plant startup tests such that:
(i)
For gt - % ktween -3R and +W, f (AI) = 0, Wre g aM gb are percent RATED THERMAL-y g
POWER in the top and bottom halves of the core respectively, and q '* 9 is totalLTHERMAL t
b POWER in percent of RATED. THERMAL POWER; (ii)
For each percent that.the magnitude of qt
- % exceeds -33%, the AT Trip Setpoint shall be automatically reduced by 2.52% of its value at RATED THERMAL POWER; and (iii)
"For each percent that the magnitude qt.
a exceeds +9%, the AT. Trip Setpoint shall
~
b be automatically reduced by 1.75% of its value at' RATED THERMAL POWER.
NOTE 2:
The channel's maximum Trip Setpoint shall' not excedd its computed Trip Setpoint by more than-1-7% of
'l aT span.
/ 6 m.-a_
- Lr----
-m
---s-A.u-
%-E-uu;_.-
TABLE 2.2-1 (Continued)
REACTOR TRIP SYSTEM INSTRUMENTATION TRIP SETPOINTS E
NOTATION (Continued) f 1
Lag compensator on measured T,,g;
=
.q 1+iSg Time constant utilized in the measured T,,g lag compensator, t = 0 s; r
=
6
. 6 z
K
=
0.0012/'F for T > T" and K6 = 0 for T 5 T";
6 T
Average Temperature, 'F;
=
T" Indicated T,,g at RATED THERMAL POWER (Calibration temperature for AT
=
instrumentation, <576.2*F);
~
h Laplace transform operator, s-1; and S
=
s~
gg f (AI) 0 for all AI.
=
2 h
NOTE 4:
The channel's maximum Trip Setpoint.shall not exceed its computed Trip Setpoint by more than
- E S% of AT span.
o?.7/o
. /. 'N$
NOTE 5:
The sensor error for temperature is :k:22lE and 0.73% of span for pressure.
TABLE 3.2-1 DNB PARAMETERS 3 Loops in PARAMETER
-Operation 5503 Reactor Coolant System T,yg
< ;^^.0"F lL Pressurizer Pressure
> 2220 psia
-> 274,800 gpm**
Total Flow Rate i
-l i
i I
i
- Limit not applicable during either a THERMAL POWER ramp increase in excess of 5 porcent RATED THERMAL POWER per minute or a THERMAL POWER step increase in excess of 10% RATED THERMAL POWER.
- lnciuots a 3.5% flow measurement uncertainty.
BEAVER VALLEY - UNIT 2 3/4 2-14 PR0 POSGD
e
-TABLE 3.3-1 (Continued) b.
Above P-6 but below 5% of RATED THERMAL POWER, restore the inoperable channel to OPERABLE status prior to increasing
' THERMAL POWER above 5% of RATED THERMAL POWER.
Above 5% of RATED THERMAL POWER, POWER OPERATION may c.
continue.
ACTION 4 -
With the number of channels OPERABLE one less than required by_
the Minimum Channels OPERABLE requirement and with the THERMAL POWER level:
-Below P-6, restore the inoperable channel to OPERABLE status a.
prior to increasing THERMAL POWER above P-6 setpoint and suspend positive reactivity operations.
.;j b.
Above P-6, operation may continue.
ACTION 5 -
With the number of OPERABLE channels'one less than the Minimum Channels OPERABLE' requirement, restore the= inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or open the Reactor Trip System breakers, suspend all operations involving positive reactivity changes and verify Valve 2CHS-91 is closed and secured-in position within the next hour.
j ACTION 6 -
This Action is not used.
-i ACTION 7 -
WiththenumberofOPERABLEchannel[onelessthantheTotal l
Number of Channels and with the THERMAL POWER level:
Less than or equal to 5% of RATED THERMAL POWER, place the a.
inoperable channel in the' tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; restore the inoperable channel to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after increasing THERMAL POWEll above 5% of RATED THERMAL POWER; otherwise reduce THERMAL POWER to less than
- 1 5% of RATED THERMAL POWER within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, b.
Above 5% of RATED THERMAL POWER, place the inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; operation j
i may continue until performance of the next required
- i CHANNEL FUNCTIONAL TEST.-
ACTION 8 -
With the number of OPERABLE channels one less than the Total Number of Channels and with the THERMAL POWER level above P-9,-
place the inoperable channel in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; operation may continue until performance of the next
'i required CHANNEL FUNCTIONAL TEST.
ACTION 9 -
This ACTION is not used i
An OffdA8% lLof h) C ef co&Shr l D YL kTN fd hd Iey, o r.D im Arn pu htle a-4 A ny.ad bas ypl:eol, y 4 tk L;/ed Arb ddcoeceded 7
L BEAVER VALLEY - UNIT 2 3/4 3-6 MohsEp
. TABLE 3.3 REACTOR TRIP SYSTEM INSTRUMENTATION RESPONSE TIMES FUNCTIONAL UNIT
_ RESPONSE TIME 1.
.NOT APPLICABLE' 2.
Power Range, Neutron Flux 5 0.5 seconds
- 3.
Power Range,-Neutron Flux, High Positive Rate
-NOT APPLICABLE 4.-
Power Range, Neutron Flux, High Negative Rate l'O.S seconds"
' 5.
Intermediate Range, Neutron Flux NOT APPLICABLE-6.
Source Range, Neutron Flux (Below P-10)
NOT= APPLICABLE.
7.
Overtemperature AT 6.0 13x5-seconds *-
l' 8.
Overpower AT 1
seconds
- 9.
Pressurizer Pressure--Low j
< 2.0 seconds (Above P-7)
~
- 10. Pressurizer Pressure--High 1 2.0 seconds
- 11. Pressurizer Water Level--High (Above P-7)
NOT APPLICABLE
- 12. Loss of Flow - Single Loop (Above P-8) 5 1.0 seconds
- 13. Loss of Flow - Two Loop-(Above P-7 and below P-8)
< 1.0 seconds 1
~
- 14. Steam Generator Water Level--Low-Low
- t (Loop Stop Valves Open)
< 2.0 seconds
- 15. Steam /Feedwater Flow Mismatch and q
Low Steam Generator Water Level NOT APPLICABLE
- 16. Undervolta e-Reactor Coolant Pumps-(Above P-7 5 1.5 seconds
- 17. Underfrequency-Reactor Coolant Pumps (Above P-7)
< 0.9 seconds
- Neutron detectors are exempt from response time tes
- j
Response
electronic component in channel.
BEAVER VALLEY - UNIT 2 3/4 3-8 f20f05fb l
t
~
4 1
ATTACHMENT B j
J Beaver Valley Power Station, Unit No. 2 Proposed Technical Specification Change No. 38 REACTOR TRIP INSTRUMENTATION REVISION RTD BYPASS ELIMINATION t
A.
DESCRIPTION OF AMENDMENT REQUEST DCP-1469 will incoporate a plant design change during the 2nd refueling outage (September 1990) to remove the existing Reactor 3
I Coolant System (RCS) hot leg and cold leg Resistance Temperature Detector (RTD) bypass system and replace = it with fast response thermowell mounted RTD'S intalled in the reactor coolant loop piping.
The revised design will affect the FSAR and UFSAR response time design basis for the overtemperature and Overpower delete T and. loss of flow reactor trip functions.
WCAP-12478 entitled "RTD Bypass Elimination Licensing Report for Beaver-Valley Unit 2" (Proprietary) is attached and describes the extensive analyses, evaluation and testing performed to' ensure the new design meets all safety, licensing and control:
requirements necessary for the safe operation of the plant.
The proposed technical specification amendment would-support-this design change by incorporating the revised response 1 times into the applicable reactor trip functions.:
i B.
BACKGROUND t
Separate bypass manifolds for each reactor coolant loop hot and cold leg are provided so that. individual temperature signals may-be developed for use in the reactor control <and protection system.
The bypass manifold around each steam generator obtains a representative hot leg temperature by mixing the_ flow from three scoop connections, which extend into the flow stream at-locations 120 degrees apart in the cross-sectional plane, on the reactor coolant leg.
The hot leg bypass flow exits the manifold to a common return line.
Flow for the cold leg bypass manifold, which bypasses the RCP, is obtained downstream of the pump: discharge.
Because of the mixing action of'the pump, only one connection is required to obtain a representative sample.
This connection is located as close as possible to the weld connection at the pump discharge and is in the same relative position in each loop.
i i
The bypass manifold lines join downstream of each of the hot and cold leg manifolds and discharge into a common line.
The combined bypass flow passes through a flow indicator before discharging to the suction side of the RCP.
The manifolds are not provided with thermometer wells.
- Instead, the resistance temperature detectors extend directly into the flow path.
Therefore, two isolation valves in series are provided on each side of the bypass manifold to allow for resistance temperature detector maintenance.
The valve nearest the connection to the main coolant piping is located above the centerline of the reactor coolant pipe to-permit valve repair j'
during cold shutdown.
In addition, vents and drains are provided in each manifold to be used, in conjuction with the isolation valve, for maintenance.
l i
L d
PrepocOd Technical-Sp cification Chinga No. 28 Page 2 The plant design modifications will involve replacing the current
.)
RTD bypass system with RTD's installed in each-reactor coolant loop to obtain the. individual loop temperature signals for input-to the reactor control and protection system.
The design change will eliminate the bypass line components which;havesbeen a source of plant outages as well as occupational radiation exposure i
If plant interferences preclude the placement of a thermowell in' a scoop, then the scoop will be capped and a new penetration made' to accomodate the thermowell as~shown in the WCAP Figure 1.2-2.
J C.
JUSTIFICATION l
The NRC has. identified '(InformAtion Notice 88-13) potential' l
problems resulting from the improper application of packless metal diaphragm valves supplied by Kerotest.
The cause of:the valve prob 2nas was attributed to excessive piping' vibration induced by " chugging" during reverse flow through these valves.
We have identified twelve (12) Kerotest packless metal diaphragm globe valves located in the RTD bypass manifold piping system-which could experience reverse flow.
The RTD bypass. manifold-piping is a source of increased radiation exposure from required maintenance on the bypass piping and from crud traps which' increase the radiation exposure throughout the loop:
compartments.
The RTD's in the bypass manifolds are susceptible to physical damage during outage activities and difficulties have been identified with. replacement-of the direct immersion type RTD's.
Problems have also been.incountered in torquing the.
flanged connections in.the RTD bypass manifold piping to achieve.
a leak-tight-joint.
Therefore, elimination of,the RTD bypass piping and associated valves and' flanged connections will reduce maintenance and operating problems.in addition to reducing personnel radiation exposure..
The new thermowell mounted RTD's have a response time equal to, or better>than, the current bypass piping RTD. 'This will allow the total RCS temperature measurement-response time-to remain unchanged at 6.0 seconds.
As stated in the WCAP, the differences in response time characteristics and instrumentation-uncertainties associated with the fast response thermowell RTD system have been analyzed for those UFSAR accident analayses that may be affected by the. proposed design change.
It was conclucded that a small increase in RCS temperature uncertainty (from 4.0 to 4.1 deg F) can be accomodated by margins in the safety analyses acceptance criteria limits and allocation of generic DNB margin.
All other safety analysis assumptions remain valid.
Therefore, the applicable UFSAR non-LOCA safety analyses conclusions and acceptance criteria continue to be met.
It was determined that for the UFSAR Small and Large Break LOCA events a Peak Clad Temperature (PCT) penalty of 1 degree F was assigned to account for the small increase in RCS temperature uncertainty with.the results indicating the analyses continue to meet existing acceptance criteria.
't Prop ccd Technical Sp3cification Chang 3 No. 38 Page 3 The WCAP provides a discussion of the effects on the plant instrumentation and control' functions and concludes that compliance with IEEE 279-1971, applicable general-design criteria-and industry standards and regulatory guides will not be changed.
The~ mechanical effects are also discussed and it is concluded that the integrity of the reactor coolant-piping as a pressure boundary component is maintained by adhering to the applicable ASME Code sections and the pressure retaining-capability and fracture prevention characteristics of the piping will not be compromised by these modifications.
D. SAFETY ANALYSIS Based on the calculations described in WCAP-12478, the following protective function technical specification requiremnts must be revised:
-j 1)
Change the Table 2.2-1 values listed for the following-functional unit prameters (from/to):
Functional Allowance Allowable Unit (TA)
Z S
Value Overtemperature (7.3/7.0)
(5.18/5.10) delta T Overpower (4.8/4.9)
_ (1. 3 8/1. 71).
(1.72/1.49) delta T Loss of Flow (2.01/1.39)
(89.5/88.8)
-}
2)
Change the Table 2.2-1 maximum allowable value not to be
-. l exceeded for:
t Note 2 from 1.7 percent to 1.6 percent, and for Note 4 from 2.6 percent to 2.5 percent 3)
Change the Table 2.2-1 note 5 sensor error for temperature from 1,72 percent to 1.49 percent.
4)
Change the Table 3.2-1 Reactor. coolant System Tavg from less i
than or equal to 580.2 F to less than or equal to 580.3 F.
l
-V
+
Propoced Tcchnical sp2cification Chong2 No. 38 Page 4 5)
Add an
- note to Table 3.3-1 Action 7 to identify the use of two hot leg RTD's per loop provided the failed RTD is disconnected and the required bias is applied.
{
6)
Change the Table 3.3-2 response time for the item 7 Overtemperature delta T and the item 8 Overpower delta T from 5.5 seconds to 6 seconds.
i Three fast response, narrow. range, single element thermowell mounted RTD's will be installed on each hot leg.
The thermowells will1be located within the three existing RTD-bypass' manifold scoops and measure the differential temperature and average 1
temperature.
One fast response, narrow range, dual-element RTDL will be located in.each cold leg to replace the cold leg RTD located in the bypass manifold.
One element of the RTD will-be considered active and the other element will be a spare.
The RTD.
bypass manifold return line will be capped at the nozzle on the crossover leg.
The new thermowell mounted RTD's will be used for both' control and protection.
The average. temperature and differential temperature signals used in~the control-grade logic will be input into a median signal selector-which will select the j
i signal which is in between the highest and lowest values of-the three inputs to avoid any adverse plant response as a result of a single signal failure.
The 7300 process electronics that require modification will be qualified to the same level as the existing 7300 electronics.
q The FSAR accident analyses are affected due to the different response time characteristics and instrumentation unce' tainties
-j between the fast response thermowell RTD system and-the current RTD bypasss system.
However, as shown in the WCAP Table 2.1-1,
.i the total response time remains the same.
RTD Fast Response Bvnass System (sec)
Thermowell RTD System (sec)
RTD Bypass Piping and Thermal Lag 2.0 N/A RTD Response Time 2.0 4.0 Electronics Delay 112 222 Total Response Time 6.0 6.0 As described in UFSAR Section 7.2.1.1.4, the hot and cold leg RTD's are inserted into reactor coolant bypass loops.
A bypass loop from upstream of the steam generator to downstream of the steam generator is used for the hot leg RTD's and a bypass loop from downstream of the reactor coolant pump to upstream of the pump is used for the cold leg RTD's.
The RTD's are located'in manifolds within containment and are inserted into the reactor coolant bypass loop flow without thermowells.
UFSAR Section
._.,,m...
- ' ~ - -
- Propo33d Technical Spscification'Changs.No. 38 Page 5 7.2.2.3.2 decribes the monitoring and testing used to demonstrate the accuracy of the RTD temperature measurements.
UFSAR Figures 5.1-1 through 5.1-7 illustrate the existing RTD bypass piping configuration.
These and other sections of th UFSAR will be revised as shown in Attchment C to address the design modifications as well as describe how the new'thermowell mounted RTDs will be used in the control and protection functions of the.
1 plant.
The RTD manufacturer, WEED Instruments, Inc. will perform time response testing of each RTD and thermowell prior to installation. ' Response time testing of the RTD's will also'be performed in-situ to demonstrate that the RTD's can satisfy the response time. requirement as installed in the plant.
Westinghouse has evaluated data taken'from other operating 1 plants and determined-the appropriate' temperature error to account:for~
the effects of temperature streaming and incorporated'this error into the safety Lialysis and calorimetric flow calculations.. The i
spare cold leg RTD element provides sufficient spare capacity to accommodate a single cold leg RTD failure =per loop.
Provisions 4
in the RTD electronics allow for operation.with only-two hot-leg q
RTD's in service.
Failure of a hot leg RTD would require manual action to defeat the failed signal and rescale the electronics to.
average the remaining-two hot leg signals.
The procedure for using the actual plant bias data is'provided in Appendix As of i
the WCAP.
The method for using fast-response RTD's installed in the reactor coolant loop piping as a means for RCS temperature. indication has undergone extensive analyses, evaluation and. testing-as described in WCAP-12478.
Incorporating this system into the plant design-meets all safety, licensing and control requirements necessary for the safe operation of the plant.
The analytical' evaluation has been supplemented with in-plant and laboratory testing to further verify system performance.
The-fast response RTD's to be-installed in the reactor coolant loop piping will' adequately replace the present hot and cold leg temperature measurement system and enhance ALARA efforts as well as improve plant-reliability.
Other nuclear plants similar to Beaver Valley Unit 2 have replaced the RTD bypass system with the-fast response-thermowell RTD system, including Beaver Valley Unit 1,LH. B.
Robinson and Salem Units 1 and 2.
Therefore, based on the above, j
the proposed changes have been determined to be safe since the design meets all safety, licensing and control. requirements necessary for the safe operation of the plant.
E. NO SIGNIFICANT HAZARDS EVALUATION The no significant hazard considerations involved with-the proposed amendment have been evaluated, focusing on the three standards set forth in 10 CFR 50.92(c) as quoted below:
T i
j
" Prcpo3Od Tcchnical Sp;cification Chango No. 38 Page 6 The commission may make.a final determination, pursuant-to' 1
the procedures in paragraph 50.91, that a proposed amendment to an operating license for a facility licensed under paragraph:50.21(b) or paragraph 50.22 or-for a testing-facility involves no significant hazards consideration, if.~
r operation of-the facility in accordance with'thel proposed amendment would not:
(1)
Involve a.significant increase-in the probability or.
)
l consequences of an accident previously evaluated;L or l
(2)
Create the possibility of a.new or different kind of accident from any accident previously evaluated; or (3)
Involve a significant reduction in a-margin of. safety.
The following evaluation is provided for the no significant-hazards consideration standards.
I i
3 Does the change involve a significant increase in the-j
+
probability or-consequences of an accident previously i
evaluated?
A plant design change is scheduled for the 2nd refueling. outage to remove the existing Reactor Coolant System (RCS) hot leg'and cold leg. Resistance Temperature Detector (RTD)Lbypass: system and replace it with fast response thermowell mounted RTD's installed in the reactor coolant loop piping.
The revised design will affect the FSAR and UFSAR response time design basisLfor the Overtemperature and Overpower delta T and loss of flow reactor trip functions.
The transients which assume protection from these functions are:
Core Thermal Limit Protection Loss of Electrical Load / Turbine Trip Uncontrolled RCCA Bank Withdrawal at Power-CVCS Malfunction that results in decrease-in the RCS Boron Concentration (Mode 1)
Partial Loss.of-Forced Reactor Coolant Flow Reactor Coolant Pump Locked Rotor i
Steamline Break for-EQ Outside Containment Reactor Core Response to Excessive Secondary Steam Releases-(at Power)
Westinghouse has prepared WCAP-12478 entitled "RTD Bypass Elimination Licensing Report for Beaver Valley Unit 2"'
(Proprietary) which describes the extensive analyses, evaluation and testing performed to ensure the new design meets-all safety, licensing and control requirements necessary for the safe operation of the plant.
Attachment C provides revisions to applicable UFSAR Sections to reflect the bypass piping elimination and replacement with the fast response thermowell RTD system.
These UFSAR changes are provided as background information for this technical specification change and will'be v----
,,-.,---c.,,
- ~
.-------------,--.--------a--.
- --~-- --- - --- ---
Prop 33sd Tcchnical Sp cification Changs No. 38 Page 7-included in a future UFSAR update.
The UFSAR accident analyses are affected due to the different response time characteristics and instrumentation uncertainties between the: fast response thermowell RTD system and the current RTD. bypass system, however, the total response time remains the same.
The new thermowell mounted RTD's will be used for both control and protection.
The i
average temperature and differential temperature signals used in the control-grade logic will be input into a median signal ~
selector which will. select the signal which is in between the highest and lowest values of the three inputs to avoid any adverse plant response as a result of a single signal failure.
The 7300 process electronics that require modification will be-qualified to the same level as the existing 7300 electronics.
The differences in response time characteristics and instrumentation uncertainties-associated with the fast responsa j
thermowell RTD' system have been analyzed for those UFSAR accident-analyses that may be affected by the proposed design' change.
It was concluded that a small increase 11n:RCS temperature uncertainty (from 4.0 to 4.1 deg F) can be accomodated by margins in the safety analyses acceptance criteria limits and allocation-of generic DNB margin.
All other safety analysis assumptions remains valid.
Therefore, the applicable UFSAR non-LOCA safety analyses conclusions and acceptance' criteria continue to be. net.
It was determined.that for the UFSAR Small'and Large Break-LOCA events a Peak Clad' Temperature (PCT) penalty ofL1~ degree F was assigned to account for the small increase in RCS. temperature-uncertainty with the results indicating the analyses continue to-meet existing acceptance criteria.
The effects on the plant instrumentation and control. functions were evaluated and found to comply with'IEEE 279-1971, applicable general design criteria and industry standards and regulatory guides.
The mechanical effects were evaluated and it is concluded that the integrity of the reactor coolant piping aus a i
pressure boundary component is maintained by adhering.to the-applicable ASME Code sections and the. pressure retaining.
capability and fracture prevention characteristics of the piping
~
will not be compromised.
Incorporating'this system into the-plant design meets all safety, licensing and control requirements r
necessary for the safe operation of the plant.
Therefore, the.
propoced changes will not introduce any adverse safety considerations or involve a significant increase in the probability of occurrence or the consequences of an accident t
previously evaluated.
2.
Does th3 change create the possiblity of a new or different kind of accident from any accident previously evaluated?
The design change will eliminate the bypass line components'which have been a souce of plant outages as well as occupational radiation exposure.
The new design will continue to perform the functions satisfied by the current system.
The proposed change s
-,,e-..
-.---,.-~w-.
.--,.-c._
,.,,3,
,,,,.n,--,,,,--,-,e-
.,,,--.m.-y-w-
y y
Propcacd TCchnical Sp cification Chengo No. 38 Page 8 q
r
'1 will be performed in a manner consistant with the applicable standards,. preserve the existing design bases, and will not
}
adversely impact the qualification of any plant systems.
This r
will preclude adverse control / protection systems interactions.
The design, installation, and inspection of.the.new thernowell RTD system will be done in accordance with the applicable ASME Boiler and Pressure Vessel Code criteria.
Therefore, the-probability for an accident or malfunction of a different' type-than previously evaluated will not be created.
3.
Does the change involve a significant-reduction in a margin of safety?
,y The applicable design bases have been evaluated to ensure the new design will provide-the overall reliability, redundancy and diversity assumed available in the plant design for the protection and mitigation of accident and transient conditions.
The integrated operation of the new thermowell RTD's is consistent with the assumptions used in.the accident analyses.
The applicable surveillance requirements will continue.to ensure the system functional capability is maintained' comparable to the original design standards.
The response time measurement'.
provides assurance that the. protective functions satisfy the time limits assumed in the accident analyses.
The-integrity of the reactor coolant piping as a pressure boundary component is maintained by adhering to the applicable ASME Code sections and the pressure retaining capability and fracture prevention characteristics of the piping will'not be' compromised.
Therefore, the proposed changes will not involve a significant reduction in the margin of safety.
F.
NO SIGNIFICANT HAZARDS CONSIDERATION DETERMINATION-t The method for using fast response RTD's installed in'the reactor coolant loop piping as a means for RCS temperature indication has undergone extensive analyses, evaluation and: testing as described in WCAP-12478.
Incorporating this system into the plant design meets all safety, licensing and control requirements necessary for the safe operation of the plant.
The analytical evaluation i,
has been supplemented with in-plant and' laboratory testing to further verify system performance.
The fast response.RTD's to be installed in the reactor coolant loop piping will adequately.
replace the present-hot and cold leg temperature measurement system and enhance ALARA efforts as well as improve plant reliability.
Other nuclear plants similar to Beaver Valley Unit 2 have replaced the RTD bypass system with the fast response thermowell RTD system.
Based on the above safety analysis, it is concluded that the activities associated with this license i
amendment request satisfies the no significant hazards consideration standards of 10 CFR 50.92 (c) and, accordingly, a no i
significant hazards consideration finding is justified.
j
L Propc00d TGehnical Sp3cificaticn Chango No. 38-Page 9 i-G.
ENVIRONMENTAL EVALUATION The proposed changes have been evaluated and-it has been determined that the changes do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the-
-proposed changes meet the eligibility criterion for' categorical exclusion set forth in 10 CFR 51.22(c) (9).
Therefore, pursuant to 10 CFR>51.22 (b), an environmental assessment of the proposed changes is not requried.
d i
5 I
I 1
.n l
1.
ATTACHMENT C UFSAR Changes Beaver Valley Power Station, UnJt No. 2 Prooosed Technical Soecification Chance No. 38 I
l 4
l
.I i
l i
i l
-l i
BVPS-2 UFSAR i
(*
5.4.3 Reactor Coolant Piping
(,
5.4.3.1 Design Bases The RCS piping is designed and fabricated to accommodate the system pressures and temperatures attained under all expected modes of plant -
operation or anticipated system interactions.
Stresses are maintained within the limits as defined in Section III of the-ASME:
Nuclear Power Plant Components Code for Class I components.
Code and material requirements are provided in Section 5.2.
Materials of construction are specified to minimize corrosion / erosion and ensure compatibility with the operating environment.,
The piping in the RCS is Seismic Category I, Safety Class I and is designed and fabricated in accordance with ASME Section III, Class I requirements.
Stainless steel pipe conforms to ANSI B36.19 for sizes 1/2 inch through 12 inches and wall thickness Schedules 40S through 60S.
Stainless steel pipe outside of the scope of ANSI B36.19 conforms to ANSI B36.10.
The minimum wall thickness of the loop pipe and fittings are not less than that calculated using the ASME III Class 1, formula three,. of Paragraph NB-3641.1 with an allowa strest The pipe wall thickness for Srth i ;_gge value of 17,550 psi.g,
- __
- sf pressurizer surge. liney I
(
is Schedule 160.
The minimum ~ pipe bend radius is five nominal pipe diameters; ovality does not exceed 6 percent.
All butt welds, branch connection nozzle welds, and boss welds shall be of a full penetration design.
Processing and minimization of sensitization are discussed in Sections 5.2.3 and 5.2.5.
Flanges conform to ANSI B16.5.
Socket weld fittings and socket joints conform to ANSI-B16.11.
5.4Property "ANSI code" (as page type) with input value "ANSI-B16.11.</br></br>5.4" contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process..3.2 Design Description Principal design data for the reactor coolant piping are given in Table 5.4-7.
Beaver Valley Power Station - Unit 2 is provided with 4
loop stop valves on each hot and cold leg.
These valves are.
described in Section 5.4.12.
i p
Reactor coolant loop pipe is seamless forged.
Reactor coolant loop fittings are cast seamless without longitudinal or electroslag welds.
Pipe and fittings comply with the requirements of the ASMI Code,Section II, Parts A and'C,Section III, and Section IX, s
5.4-23
.~
iBVPS-2 UFSAR-l
-l The RCS piping is specified in the smallest sizes consistent with system requirements. This design philosophy results in the-reactor inlet and outlet piping diameters given in Table 5.4-7.
The line between the steam generator and_the pump suction is larger to reduce pressure drop and improve flow conditions to the pump suction.-
1 The reactor coolant piping and fittings which make up thE loops are.
austenitic stainless steel. All naaller piping which comprise part i
of the RCS such as the pressurizer surge line, 1::; ty;;;; 11;....
-j spray and relief line, loop drains, and connecting' lines to other systems are austenitic-stainless steel. The thermal sleeve in the charging.line connection is also austenitic stainless steel.
The
- nitrogen supply line for the pressuriser relief tank is carbon steel.
4 All joints and connections are welded, except for the pressurizer 1
code safety valves, where flanged joints are used.
All piping connections from auxiliary systems areLaade above the horizontal centerline of the reactor coolant ~ piping. with-the exception of:
1.
Residual heat removal '(RRR) pump' suction lines, which are 45 degrees down from the horizontal centerline.
This enables the water. level in the RCS to be lowered in the reactor j
coolant pipe while continuing to operate the. residual heat removal system (RHRS),
should this -be-required -for maintenance.
I 2.
Loop drain lines and the connection for temporary level
)
neasurement of water in the RCS during' refueling and maintenance operation.
t 3.
The differential pressure taps for flow measurement, which are downstream of the steam generators on the-first i
90-degree elbow.
l 4
The pressurizer surge line, 'which is attached at the l
horizontal centerline-5.
The safety injection connections of the hot leg, for which inservice inspection requirements and space' limitations dictate location on the horizontal centerline.
Aserrew Aase' y- - '176 Moreresaa/l40sWs m nond hoHy i
6.
Two of the three j
d t :t : i:: 1:; :n__;;;._,
hvidb e of!2) 7.
One hot leg sample connection and loop the alls, all j
located on the horizontal centerline.
-g Penetrations into the coolant flow path are limited to the following:
(
1.
The spray line inlet connections extend into the cold leg piping in the form of a scoop so that the velocity head of 5.4-24 4
e w
wr w
e-m
+.,w m.-
..-..e
- -m..w
--.,we
-w---
.---e e
wser-
'j
- h$/rt/a re
' In **ie 0
,a,ua3'*naldes-&e M(ese 3
><.y,,-,w. a -presem4e/nt Army ~nereAvre.fte c
~., n
<~ o n,
/
N ' "# * #the*rUc't N1 ant loop -flow adds to the spray driving l'
force.
l
~
2.
The reactor coolant sample system taps protrude into the-i'
. main stream to obtain a representative sample of the reactor Coolant.
3.
The resistance temperature detector hot leg byyear eenmoe94ene.-eee scoops -iht. extend into the reactor coolant.
M
- "^^'
^,---- ^20 -M-J: : : _, :.-J : _..
.'.. C.. -
- i:::- : 0 a ::::::; d:t:::::
11i2'd.
l' W nnd etak//es 4.
The wide range 3 emperature Betectors J '. '- '
t are located in resistance
-q-__ _ __
m __ _
': Athat extend into the reactor 4
L coolant pipes.
- erweedge//s 11-1^11 ',<^ 1 - --i_'t';'. - 1171', _'1; 1^ ^ ' --
l' _ ; 111'.~ J. '. ^. ir t
i md cold leg ar ovided so hat indivi 1 temperature signals may ZaSer/
be develope for use he reacto ontrol'and action _ system The byp manifol round ea steam go ator obtains o.
g repre tative h leg temp ture by a g the flow threo l
a connect s, which a d into the-steam at ations. 120 legrees a t in the oss-section plane, on th eactor coolann g.
hot leg b ss flow exit e manifold a common return-(
Flow for he cold 1 ypass manif
, which b ses the RCP, in obtai downstream the pump di arge.
Be se of the mixing aepdon of the only connectio s required obtain a representativ sample.
Th connectio s located-closeL an possible the weld oction at pump disch e and is in tho l
name ative posit in each loo.
" he bypass m old lines downstream
.each of t et and cold
- .eg manif s and disch e into a c n line. Th ombined bypaso
' low sses throu a flow in ator -befor dischargi o tho nuc on side of RCP.
j
" he mani ds are not vided with roometer we Instead, tho resist ce temperatu detectors end direct 1 to the f1 path 4
1.o reduce the e delay a minimum, erefore..tw solation valves in se s are provi on each s'id of the bypas anifold o
ollow for resistance erature ector mainte ca.
The yo -
i rearest the connect to the main lant pipin is locat abovo I he centerline of the react coolant pip o permit ve repai::
ouring cold shutdown.
In a tion, vents drains provided in a ach manifold to be used, in conjunction with th isolation valve
'er --int---
1 Signals from these instruments are used to compute the reactor coolant AT (temperature of the hot log, Tnot, minus the temperature 5.4-25
. - -... ~.
=1 INSERT A Each hot leg has three narrow range, thermowell mounted, fast response RTDs located in approximately the same plane 120 degrees apart. These RTDs extend into the reactor coolant fluid, sensing the temperature at three distinct locations within the hot leg pipe. These three measurements are electronically averaged to provide a representative Thot indication.
The cold leg is provided with a dual element, narrow range, thermowell' I
mounted, fast response RTD. One element provides the cold leg temperature measurement and the other element is an installed spare.
k i
F i
-BVPS-2 UFSAR of the cold leg, Tcold) and an average reactor coolant temperature (T,y ).- The T,y, for each loop is indicated on the main control board.
The RCS piping includes those sections of piping interconnecting the reactor vessel, steam generator, RCP, and loop stop valves.- It also includes the following:
L 1.
Charging _line from the system isolation valve up to the branch connections on the reactor coolant loop.
2.
Letdown line and excess letdown line from. the branch connections on the reactor coolant-loop. to the system isolation valve.
3.
Pressurizer spray lines from the reactor coolant cold legs to the spray mozzle on the pressurizer vessel.
~
4.
Residual ' heat removal lines to or from the reactor coolant loops up to the designated check valve or isolation valve.
=
5.
Safety injection lines from the designated check valve,to the reactor coolant loops.
[
6.
Accumulator lin'es from the designated check valve to the reactor coolant loops.
g.
[ /.
Loop fill, loop drain, sample *, and instrument *, lines to or from the designated isolation valve to_or from-the reactor 6
coolant loops.
$ f.
Pressurizer surge line from one reactor coolant loop hot leg to the pressurizer vessel surge nozzle.
/ 3d. Loop bypass lines between the loop stop valves of each loop.
/ e EI.
"--'-t--
-,- rr'rre S t:- rr :- :; c'l--
t,k ressurizer spray scoop, sample connection
- with scoop, reactor coolant # 4 t-.:::trr: 11 :---
installation boss, and the
. mtz gro y%eemisee//
- 1: x t' r il itself.
// yl. All branch connection nozzles attached to reactor coolant loops.
jg, 38. Pressure relief lines from nozzles on top of the pressurizer vessel up to and through the power operated pressurizer relief valves (PRVs)-and pressurizer safety valves.
/J /. Seal injection water to or from the RCP inside the reactor containment.
)
i 5.4-26
BVPS-2 UFSAR
-/f)5. Auxiliary spray line-from the isolation valve-to-thei j'
pressurizer spray line header.
jg d.
Sample lines *,
instrument lines *,
and vent lines
- from pressurizer to the isolation valve.
f 6 )f. Reactor vessel head vent lines'from the reactor vessel head-to the excess letdown lines..
Note:
- Lines with a 3/8-inch flow restricting orifice located below normal -pressurizer level qualify
.as Seismic-
-Category II; in the event of' a break in one of'these Category II lines, the normal makeup system is capable of L 1
providing makeup flow while maintaining pressurizer water i
level.
1 Details of the materials of construction and codes used in the-
~l fabrication of reactor coolant piping and fittings are discussed. in ~
Section 5.2.1.
5.4.3.3 Design Evaluation a
Piping load and stress evaluation for normal operating loads, seismic j
loads, accident loads, and combined normal, accident and seismic l
loads is discussed in Section'3.9.1.
4 i
5.4.3.3.1 Material Corrosion / Erosion Evaluation
('
The water chemistry is specified and maintained to minimize corrosion. A periodic analysis of the coolant chemical composition 2
ir performed to verify -that the reactor coolant quality meets the-specifications.
The configuration and weld finishes are -designed to facilitate inservice inspection as required by ASME Section XI.
Pursuant to i
this, all pressure retaining welds out to tho'second valve that delineates the RCS boundary are provided with removeable insulation to facilitate examination.
Components constructed with stainless steel will operate satisfactorily under normal plant chemistry conditions in PWR
- systems, because chlorides, fluorides, and particularly oxygen, are controlled to very low levels (Section 5.2.3).
~
Periodic analysis of the coolant, chemical composition is performed to monitor the adherence of the system to desired reactor coolant water quality listed in Table 5.2-5.
Maintenance of the water quality to minimize corrosion is accomplished using the chemical and volume control system (CVCS) and sampling system which are described in Section 9.3.
j 5.4-27
BVPS-2 UFSAR i
5.4.3.3.2 Sensitized Stainless Steel Sensitized stainless steel is discussed in Section 5.2.3.
5.4.3.3.3 Containment Control
- Copper, low melting temperature alloys, mercury, and lead are prchibited to preclude contamination of stainless steel and Inconel.
Colloidal graphite is the only permissible thread lubricant.
Prior to application of thermal insulation, the austenitic stainless steel surfaces are cleaned and analyzed to a halogen limit of 8
8 0.0015 mg C1/dm and 0.0015 mg F/da.
l l
5.4.3.4 Tests and Inspections -
\\:
The RCS piping NDE program is given in Table 5.4-8.
i Volumetric examination is performed-throughout 100 percent of the-wall volume of each pipe and. fitting in accordance with the applicable requirements of Subsection NB of the ASME Section III code for all pipe 27 1/2 inches and larger.
All unacceptable defects are-eliminated in accordance with the requirements of the same section of the code.
t A liquid penetrant examination is. performed on both the entire outside and inside surfaces of each finished fitting in accordance s,
with the criteria of ASME Section III. -Acceptance standards are in
)i accordance with the applicable requirements of.ASME Section III.
The pressurizer surge
' M line/ conform to SA-376 Grade 304, 304N, or 316 91th supplementary requirements S2 (transverse tension tests), and S6 (ultrasonic test).- -The S2 requirement applies to each length -of -pipe.
The-S6 requirement applies to 100 percent of the piping wall volume.
The end of pipe sections, branch ends, and fittings are machined back to provide a smooth weld transition adjacent to the weld path.
In addition, all piping not supplied by the nuclear steam supply system (NSSS) vendor, which forms part of the RCPB, is examined--in l
accordance with the applicable subsection of ASME III.
- l 5.4.4 Main Steam Line Flow Restrictor 5.4.4.1 Design Basis The outlet nozzle of the steam generator is provided with a flow restrictor designed to limit steam flow in the unlikely event of a break in the main steam line. A large increase in steam flow will create a back pressure which limits further increase in flow.
Several protective advantages are thereby provided:
rapid rise in
)L d~
5.4-28 i
i s
.....a..s BVPS-2 UFSAR-TABLE 5.1 ;
REACTOR C00Ihrt SYSTEM STEADY STATE FULL POWER OPERATION Flow 1
Loca-Pressure Temperature Ib/hr tion *
-Fluid (psin)
,( *F,),
gge**
(x 10e) 1 Reactor Coolant 2,235.0
-609.9 100,120 07.000274.,,,,
~'
l 2
Reactor Coolant 2,230,7 609.9 100,001 30.0000 3
Reactor Coolant 2,190.7 542.3 07,042,30.9020 4-Reactor Coolant 2,187.7 542.3 07,505 37.01000 1
5 Reactor Coolant-2,280.1 542.5 07,000 07.0210-1 6
Reactor Coolant 2,275.8 542.5 97,533 36.??f275 7
Reeeter Oeel-2,200.7 000.0 33.0 0.01140
)
S
?:::::: 00:1=t 2,230.7 M?. 9
!!.S 0.01155 0
!=;;;;0=1=t 2,230.7 M?. 0 33.0 0.01110 i
10 Ruster Oc;1=0 2,205.6 509.9 101.6 0.0?$33 -
11
=::= "r:1=t 2,199.2 512.5 M9 0,0??1 a
12 Ru;tu On120 2,100.3
!!i.5l 100 0.0575 3-7 Reactor Coolant 2,235.0 652.7 2.5 0.00076
- 9 Reactor Coolant 2,280.1
'542.5 1.0-0.00038 1 Reactor Coolant 2,235.0 652.7 2.5 0.00076 i to Reactor Coolant 2,235.0 652.7
- 7 - 11 Steam 2,235.0 652.7
- 12 Reactor Coolant 2,235.0 542.5 2.0 0.00076 13 Steam 2,235.0 652.7 0
0 N iS,14 - 20,21,22 N 3.0-
.120.0 0
0
-2 9 - 17 Na 3.0 120.0 0
0.
-34 18 Reactor Makeup Water 3.0 120.0
'O O
i NOTES:
f
- Refer to Figure 5.1-1 for these locations.
- At the conditions specified.
1 i
lo8.247 3 L, 'j % 23(
108, 269
% 19639b i
%, Boo 36.736416
"'"T '
96,900 36.196996 iG,800 36.7969 %
96,799 36.796616 l of 1 i
J
a
-m a
m
-4.ma,,a.s.,
Ast
-.na._
4 4
_n n
N i
.lE lli
- atl !
CXD C'
1l e-e-
th i m,
s s
[
disii
&x A+%-
li y+
cal g
c t
4[
I ll 3, -.y.
7 w-
,p i
~
i
{
g t
i d
e a
c'S i
t O
m x
x x-K
- D
~
N x
s x
- N
'N N
l sN N
N x\\
\\
II' 11 CXD Cr--2{
r (sl d(>
~
~
j
m 4
N I
.g
.s
- i I
dli l
e......
V I
'4 f,Yr wA jll f h.
A 1
g e
6
{
V
- b-
?/
\\
n,
, )
. P
/
s e
e m et m 1
b 2.;5. o i_
=f l
5 f
4
l
(
.l*'
9 e
=
=W TT*
= * *
'w Q{
=*
r 3D __'e u * *+
NA w
- = =
- E T'
.~
" 3=.
5
- ==.
~ *'.*
- =
a%
t =
r
.& J 8"
T
[*v%
M,r [
- w.
t M*
- t,
g
- g
- =n yf eo 3
=
- we 8
2 a
~
- a.
~
mH er e
.I a"_
r
- D.. h I
f I
ai -
L" i
1" 4
,M jJW "N d..
r*-
l**
a
{
w_s*
I -
i
- 4 a
- ry 0
3 S**s gmT_
w 3
s 4
4
- J.-
.A
),
W h* _ **=
W 1
7*
4
,* L g
p 4
tI r
6 Q -
w y
N 4
p~p.==g?
i L ~~ g r
4 e
-5; N"kE h,
t i
j
- !{
n 4
i rI
=
/-
- 4'
/.M)"'.
s g
e r
~
N
-. F#j
~
i.
& N
- y. f _
s, g' L=
'l;
,i 3
-. E.
. Qj
,s w.
/
. *=
- g
/
]
e, h.
d:jj
~ _
yX
~
T
'1 ]* *, k.
g/
/
m-h Y
k M-[_ l1 '
~
E ;
P""
v'
\\
[
- /
i 4
=
4*.
E b*.
A"
- 2 g V,
".3. fj8I1 1
7 g
j fI a:
s=J '
y/
- MJ F y-p**
d MW
- M I
E.
i-
.y '
.L p **
j e
K.
/
wM1. 'Y**
' /
T.
e.,
- i. 9y,*
[3*
5 Ng
- g. 7."
./
s y
oTRg.
gg.
A T' C & T' r
3 ma d
p 8'^
a "I
Q-E 4
6}'
+ * * *
- w *= **
s 12 HH A
79901 SS t
op3 9g 20 st 7*189ft 22233 456 t
3 78 0 AA 222
.r 3
,254 9O 456 "
3 311 21 22 rCw
- 2. 2 555555 44444 444 444 44 444
- 44 42 55 1
- - - - - 1 222 32333 F
cc 999999 0Ce11 999 99999 999 999 99 999 ;:99 s 99 1
00 tA8 A6 40 411 1'
?2 O o. 23 99f223 t2334 f23 12356 12
,33 12 11 - : : - -
1 2
1I
&N 111 4AA
.89 CC 000 ;lGC A0 AAAAA CvC 00000 P
55 666666 44 444 44 444
- 44 46 99 11t1 44.4
- 3 333333 444441 4e4 44444
.44 44 444
- 44 44 55 YE A
K E
56267990 nR AUc 3456 2371,694 22323334 99 3
25 a345 4562 I ' 56 789 221192 234 E s C
rCo 22111.
Omm0n0C9 VUU0e10ec 99999,;999C9Ue910 tf 1
i 2.22222i2224444.23 ' i55 333.3
- h.c Q,
F t.t22 2.2.24722.4 44444444 i ; 99 999 N
yW.
E
[
R E
0O 334S A0 A
7 9234 A9
' 823 67 f f23a9133 1A9?234a345 i
~-
l lllL'
?3 3 i 44 234 r
6' l
- - - t234 o =- '
E'
?
p':
i y
. ~-
(
4c 6>-
ill i.~ !:.......
14 ni i
4 I'I h
rl!!
,e f
l 8l ellt.
p* pj 12 t o3 i
t--m '
g Di
,l s.1 tN p,
y L-Qy k
i
,g,
]
I kgj.>i a ol { W
- t
- dg t
ii ll h
gig b T
i 1
i
... _ -.,. _ a.
}I g 'N
.L3
'p gQ\\
\\
A 1
f
[hl hd i
In'Ih
\\
(
g g; 4
,3 a;g I 4Tf9[
-4 k*
\\
(m.. '
s)h g
.s.A
,II i
1 n
M Q,'
t s
rQW, y
~
Tt y" ellb
.li d N gaumy l-lq l
I mm
.n,, c.
s' Bli.U'V 53 k{g a?? seela. : 9999? Ear d"wRe
~.n vos
.9
,c c ogeseR5 2A A..
ce.aa..a t-t*#.A.A.A A.AA.A.A.444 444 44 44,9. 444 4444A A.A a
. 9999
.e.
.ecEEe T?$'91 T7? T7??T T77 TY9 T?
29 8'"
k~h kkkkkk !!!!! WYY ????? $$$ II YY a
T7?i'""'-
TT IIII k kI b
9995999i99????Tviteititg.9tveitti.did;:
d R[9 ::Tev ???TTit?
-a-g-
- BBBBBBB: 33555555 :::::~;;;;:3333. :::00::
aW
- g EE c Stun, st un "77 59 wn..wn c.,um n759mn5Tc un*
kkkk kkkkk kk kkk kkkkkkkkkkkkkkk E h
f;"
n-y:9p*'
a
$!jl.8 g
n) eh..v.I.ill H3 A
I Cp g
q!i ;
d4
- l![!
e j
11 g
u-t,,
o, A
,ri, Ly,i,s ap t
u,w
\\ 95 se I
P.
/,im WI f!
4 *e in N
d<'Q h (,,. gJ;)
x M
- ~zG s. i j.r
" l. g-.
t.
p
. 3-
-'yp=
x
'j.h 4
5 11 V ~41r,,[@ _.___.ML..
^
' ND r.<
8 1 1.t i
10 m
. 'd j E
- D,.1
!..\\
lg h
.g L..x..
i i
y 3
\\
f
=.
N n
3, a2
.i w..,
x
,r s
} ??
YI b
a m, ma d,t 3
t r
Ra g, g
i q
i b aR g.:rgd 9a J h.i g
j I6
/
i
.t illa s uT O
Bi%g I! ;' y!.I.I.;. !!!!? ??? i???? ?T? YH if tit vi???5?M M we 0.
99999 ::: 0:0 2 ::: :' :: ::: ::::::*:~ ::
.onsBo 77??; ;??
-~me. T?t i?? T?
E~ddEEANA!!!!!VVVhhhhh$$$IIIYY.h'!!hYYh'T??t.itY$$$E 5
gg
? -7" n
U
- 1 d %[g ;ttv ???TTit. ???????? sunind:
unna.~,7y;3&&B:Bindi[:,n~,,nb' tit?;~
~m 9
- 992BBB&BBBiBBBi&&&&
D a:
W g MR y 59mm wt an,7777 59 um me?9mm**
h kk C kkkk kk b$$$$$$$ $$kkkk.-ween undddkEAddh ddda
.any kEEEEddd
F
)$a N
u
- 1x em
. } (blhI
$hL
..y " ^
J%%
W
- y l
g g
g g
j g
g 4
a A_ w REFERENCE KEY
=
~**~
A mm%
g f* *W53t**
a m
e,.pg.sy, PhD r
P90 r.,,
w~
-MS I
W o
,e
,o y
p*
2S-3A St2-3 35-2 10.2 - 9 g
25-35 112-4 35-3 10 2 -10 25-4 112-5 7-g 25-5 ft2-6 36-9 95-7 ME E
~am-F
".LN" 3 6 - 10 9 5 - 12 l
26-%
0.2-2 36-11 19.5- 0
~
h*
"""'** gl
.r f
26-4.)
10 2 - 3 36-12A l 9 5-8
-NO d
M/
@V 25-2 n2-7 36-w 95-9 v
26-3 R4-1 36 - 13 9 5-it g
n 2s-4 10 3 -1 m./
~
=
w.ame M 26-6 10.2 - 6 e M-1 10.4 - 2 7 26-7 n2-6 41a-2 10.4-2g
%EN
==
26-47 9.4 -16 414-3A 10 4-29 p
- = * *
[I l
3 " * * * * * ' " * * *,
s. E -
- 'MM:
2 27-3 R4-32 41C-1 91 -24 27-6 10 4-26A 41C-2 9 2-25
- 279-1 R4-37 41C-3 42-26
-I I
w * =s e
~
em 279-2 10 4-38 m **f l
A 279-3 10.4 - 3 9 4 C-1 g
275-4 R4-40 40-2 40-3 2-3
.=g,,
ervu a
&T 28-1A 9.2-28 40-5
'-20
/-
g n aae 28-W 9.2-29 4 0-g i
4 29-1 9 2 -17 g
- g, 29<
9.2- 0 44A-1
~"'
g f
~
2 g
e
//
]L%
1"**._,.
- !!'A I:! S UI:
3[
,,.-3 e--.ans -
M h
2 l2 aca-1
~
'6*'
- s ! 4-t2::;;
var 9
g-E,8 M4?
-a====.e.
=
t 10 4 - 3 31-2 n * -4 '
44C-1 94 9 I
44C-2 9 4 -10 "I
f
- 3 N 39-3 04-5 M
w %,,
31-4 10 4H5 440 A 94-4 e,r g
IEE18'T
'R M 32-1 9.2-22 440-9 94-5 gw M-32-3 10.3 - 5 440-2 9.4-6 J
.w e gg,g 22-4 9.2-27
' ~% t.oari
.aETM )
g
- gg
~j s
33-3 9.5-4 447 -4 94-e
"***""'*1 33-4A 9.5-5 440-1 i 9 4 -17 4 faag-33-48 9.5-6 W -2
- 94-1s M
- =
2>em c.
'34-t 9.3-1 48G-4 9 4-20
- = SH
' 34 4b-1 6.2 -131 smane aracienes=w m tem ase 4 e erases smaan m ersaw. wer,
34-.
2-.
39.-t 9 5-2A 5,
~~~~
598-1
' 9 5-2A SH2 I
l I
l l
l
]
l e
~
a.mLEh
...,y
'AY,,
/.
. ('
[
-E E;,. ',
4-
,s
-g9f e?
e I
l j
l l
l l
l g
g
=
-REFERENCE KEY i
_MS A
g i
rsAR rsag P&O FOpE P&O FC, URE w
_WS,_
to.
m to-A 25-3A tt2-3 35-2 0.2-9 25-38 11 2 - 4 35-3 c.2- 0 25-4 ft2-5 w
A 25-5 ft2-6 36-9 95-7 gg
,mm/
26-t1 10.2 - 2
~k
" '~
9 e E
26-G e.2-3 36-12A 9.5-6 M.E 26-2 10.2-T 36-17e 9 5-g 7 m-g 34" 28-3 10 4 -1 3s-u 9 5-n E
U 25-4 10 2 -1 v
26-6 10 2 - 6 414-t c4-77 b
26-T 10.2 - 8 a u-2 10.4 - 2 8 b
T" 25-17 94-2 4 m-3m 10.4 - 2 9 b
du-Je 10 4-30 l',:;
g:::
+4
= 4-3' an V
%s 27-3 C 4-32 4 C-1 9.2-24 2'-4 e4-Ma 4C-2 9 2-25 279-8 to 4-37 41C-3
,);-26
'l l
~
I 279-2 U.4-38 279-3 c'-3s 40-l g
A 279-4 Y
W m-2
,r~*
w gy f
28-1A 9.,
28- 0 9 2-29
- e -.3 g" '
E
- g 29-1 9.1-17 i
g/_
4 g_
. h 29-2
- 2 -18 444-1
=
Lg**
N I!'7o
$3.
94 2 g
y /
/k
/
ll~'3 Osma"
~ /
/ /
M#
~
3D-t 9.2-1 h==
30-2 9.2-2 440-1 9 4 -12 30-3 9.2 3 448-3a g e s$
M--
- a 30-4 92-4 443-38 9 4 - 14 30-5 9.2-5 4 ! g/
31-1 10.4 - 3 44C-t 94-9
=
g j
31-2 10.4 - 4 44C-2 9.4-0
~3
[
l MW w
{
4
~ 440-m 94-4
&g b
32-1 9.2-22 440-ft 94-5
. g;a-g,5,
~-2 94-6
,s
= _
33 -1A 9.5-t 44r-t 9 4-it
...,3p._
33-G 9.5-2 44r-2 94-7 33-2 95-3 44r-3 9 4 -13 33-3 9.5-4 44r-4 94-3
- h M
3 33-44 9.5-5 44G-t 9 4 -17 33-48 9.5-6 44G-2 9 4-te)
Some we =4 + w mL j
33-5 9,5-64 44G-3 9.4 -19
/
.34-1 9.3-1 44G-4 g4-20
%q r
34-2 9.3-2 46-1 6.2 -131 e
' w -**
- a+ a.
"*"'"""""N-34-3 9.3-3 eresa e 34-6 9J-4 59A-1 95-2A SH masse entrev somse st=Sem - ese e 599-1 i
- 9 5-2A SM2 '
- == sure,.
=,ue arrwe l
l I
l l
i I'
p c
,6..
g
,cs,
~
.,v__,,_
m,.
m
... ~.
. m
..^'
y c.s.
7 y
_ og :
w
< s fi,-
,. 3Q1 x -
i g. :, -
+y_
4%Os4 +
f
...m e-
-* I
~
l l
1 3
g g
g g
3-REFERENCE MEY 21=.22:
A s%
rn,
W$aR vsaR Pal 0 F10uRE Pal 0 FIGURE w ;g l f A
NO.
NO.
8s0.
NO.
w YA
,,m/
i 25 3a 11.2-3 35-2 10.2-9 Ek p %.
25-38 II.2-a 35-3 10.2-10 25-e ti.2-5
,A
.WEZl"L9l'.
g%E
,s,.r" '
25-5 et.2-6 36-9 9.S
- 36-10 9.5 12 N
w
~N 26-ta 10.2-2 36-st 9.5 30 af g",y
,g\\
_g 26-19 10.2-3 36-t?a 9.5 9 g
26-2 10.2-7 36-129 9.5-9 26-3 IO.e-I 36-13 9.5-11
' *""E
\\
4 26-4 10.2-t 5
26-S 10.2-6 ala-3
- 19. -27 aff I'6 '
10.2-8 ata-2 IG.e-23 d '7 9.a-86 sta-3a 19.a-29 b
ala-33 13.a.33 7-1
- 10. -25 ala-a 10.a-3
"y \\
\\
1T-2 b--"W 10.a-26 7-3 10.8-32 atC-f 9.2.25 2a 9.2 I
stC-2
- 26. t L.
aIC-3 9.2-26
.g g
2*-
l
~
at%g 9.3 37 25-!
9.
4.
2 c.*-
~
3 g
%?-2 8tO-3 9.3.2'5
[
th)
A 3-h y
29 4
,,,,g s s
ST 'r y
- -i s t
'al./
6, pes -
9.3 k
's -2 g
4.4-i 30-3 3
/
f&
~ **
3e-a 9.2-a sea-a 9.a-3 6--a:Laa'-
/ / /
___P*/ /
S 30-5 9.2-5 440-8 9.8-12 sen-3a 9.a-85 un--*34F 6
38-t
- 0.4 3 ase-se s.a-se 3I-2 18.a-a es 38-4 10.4-6 4 8C -2 9.8-10
,g
- R---
S -*1,ga-31-3 19.a-5 44C-3 9.a g f"
32-1 9.2-22 aa9.ga 9.s.a 4T tw 32-3 19.3-5 aaD-19 9.a-5 J-J siiN 32-4 9.2-27 a43-2 3.e-6 w
. EITutt 33-tm 9.!-!
adF-8 9.4-81 gy '
?3-19 9.5-2 asF-2
- 9. a d'8 33-2 9.5-3 aar 3
..e-13 g
_,, WE
- a m) 33-3 9.$ -a a*F-a 9.a-6
,,.g.__,.
a 33-an 9.5-5 33-a8 9.5-6 ass-3 9.a-17 aaG-2 9.a-19 dN
-=
34-I 9.3-1 aaG-3 9.a-19
,,M---
se,, se 6 w3-
' 34 2 9.3-2 Sa-3 9.3-3 a6-!
6.2 331 g
~~---~E==
,3a-*
8 8-4 y-.
me eso. s..e a
.aa.
3 em m,, -a,a E
l l
f f
i
'I i
g
BVPS-2 UTSAR fnfed 0 7.2.1.1.4 Coolant Temperature Sen.or Arrangement 8--4-+a~~
h re--t" : Det::t:: Mn; ".xmM 3epara bypass anifolds ops) for ch reactor coolant loop hot and ld leg a provided that ind dual temp ture signals may develop for use the reac r control d protecti
- system, The bypa manifol around e steam generator btains a
e ndintothe/ow repres ative ho les tem ature by ixing the ow from threa ac connectio
, which ex fl str at lo ations L
apart the cros actional p]fne, on th eactor e ant hot Leg. The t leg byp flow exitVfrom the ifold t a commom
/
- . turn P1' for the old leg b s's manifoi is obtain downstreap of the pump discha e.
Becaus f the mix g action o the pump, nly one connecti is requi d to obt a rep sentative ple.
This connec on is loca as close s possib1 o the wel onnection at uhe dischar and is he same r ative pos on in ese loop.
"he bypass ifold 1 s join dos tream of h of the and cold Teg mani ds and d charge int a common 1 e.
The c ined bypass flows ass throu a flow in cator befo discharg to the s ion aid of the RC.
"he aan Ids are n provided h the er walls, nstead, the Jesis ce temper re detect extend d actly into e flow aath no reduce the time dela to a min There re, two iso
- ion
/
g ralves in se es are pro ed on sac side of t bypass man Id to allow fo RTD maint ca.
The alve neare the connec on to t e main c ant pipin s located ove the vation of he re or
'res nozzles o permit Ive repai uring cold utdown thout lraining the In ad ion, vents d drains provid in each i
nanifold be used, in conjun on with the solatio valve, for m.4...
Signals from these instruments are used to compute the reactor coolant AT (temperature of the hot leg, Thot, minus the temperature at the cold leg, Teold,) and an average reactor coolant temperature (T,
).
The T,y for each loop is indicated on the main control board.
JNfe. AdapCold Les and Hot Lea Temperatures 4 y e/=9ereture detector =.
located in the ther=ometer walls in the cold and hot leg piping of each loop, supply signals to wide range temperature recorders.
This information is used by the operator to control coolant temperature during start-up and shutdown.
}
7.2-12
~
l INSERT B The hot and cold leg temperature signals required for input to the protection and control functions are obtained using thermowell mounted RIDS installed in each reactor coolant loop.
The hot leg temperature measurement in each loop is accomplished using three fast response narrow range RTDs mounted in thermowells. Two of the three thermowells in each loop are located within the sooops previously used to supply temperatur9e samples to the RTD bypass manifold. The third RID oould not be located within the scoop due to structual interferences and is located upstream from the scoop plane. The two scoops used to accommodate the thermowells were modified by machining a riow hole in the end of the scoop to facilitate the flow of water through the existing holes in the leading edge of the scoop and passed the temperature sensitive tip of the RTD.
Due to temperature streaming the temperatures measured by the three hot leg RTDs are different rr therefore these signals are electronically overaged to generate a 16 leg average tenverature. Provisions were made in the R7D electronics to allow for operation with only two RIDS in service.
The two RTD measurement can be biased to correct for the difference compared with the three RTD average.
The cold leg temperature measurement in each loop is accomplished by one fast response, narrow range, dual element RTD. The original cold leg RTD bypass penetration nozzle was modified to acoept the therinowell.' Temperature streaming in the cold leg is not a concern due to the mixing action of the the reactor coolant pump. Therefore, only a single temperature measurement is required in each cold leg.
i l
BVPS 2 UF8&R Any reactor -trip will actuate an alars and an indicator in the main control room.
C Such protective actions are indicated and identified down to the channel level.
Alaras and indicators are also used to alert the operator of deviations from normal operating conditions so that he may take appropriate corrective action to avoid a reactor trip. Actuation of any rod stop or trip of any reaczor trip channel will actuate an alara.
Systes Repair l
The systes is designed to facilitate the recognition, location, replacement, and repair of malfunctioning components or modules. The capability for testing was previously discussed in Section 7.2.2.2 3.
7.2.2.3 Specific Control and Protection Interactions 7.2.2.3.1 Neutron Flux m
Four power range neutron flux channels are provided for overpower protection. An isolation signal is also providad for automatic rod control.
If any channel fails in such a way as to produce a low output, that channel is incapable of proper overpower protection but two out of four overpower trip logic ensures an overpower trip, if a
needed, even with an independent failure in another channel.
(
In addition, channel deviation signals in the control system will give ar alare if any neutron flux channel deviates significantly from-the average of the flux signals.
Also, the control system will I
respond only to rapid changes in indicated neutron flux.
Slow changes or drif ts are compensated by the temperature control signals.
Finally, an overpower signal from any nuclear power range channel l
will block manual and automatic rod withdrawal. The set point for
{
this rod is below the reactor trip set point, d
7.2.2.3.2 Coolant Temperature i
The accuracy of the RTD bppens loop temperature measurements is demonstrated during BVPS-2 start-up tests by comparing the temperature esasurements from all %, -
'1 4 RTDs with one anoth Wide
(
as well as with the temperature esasurements obtained from the RTD located in the hot leg and cold leg piping of each loop. The comparisons are done with the RCS in an isothermal condition.
The linearity of the AT versus plant power is not important as far as reactor protection is concerned. The RTS set [] points are based on percentages of the indicated AT at nominal full power rather than on absolute values of AT. This is done to account for loop differences which are inherent.
Therefore, the percent AT scheme is relative, not absolute, and provides better protective action without-the.
expense of accuracy.
For this reason, the linearity of the AT signals, as a function of pcwor, is of importance rather tatm the
(
7.2-31 l
BVPS-2 UFSAR absolute values of the AT.
As part of the BVPS 2 start-up tests, the ig r:
loop RTD signals will be compared with the core exit thermocouple signals during isothermal RCS conditions.
Plant control is based upon signals derived from protection system channels after isolation, by isolation amplifiers such that no feedback effect can perturb the protection channels.
g,.gs g e ===- 1 e t = e = m==.. %........_ :_,.. a
- he highe tempe ure, t control rods are alvsys soved based upon
- he pass tic t oratur easur
.t with respect to sargino A
rious aver temper re se rament from any loop
';emperat coat chann will ca no c - rolectpra.
A spurious high -
rage ratu measur t wil ause co V inserti (safo d
tion)
- ndi ual 1 flow
- arms, indiv al stat lights for eac?
ne tor c t loo ypass
, are psevided a the ma control
- board, e al and atus 1
ts pro,Wde the rator witt
- .nsee to ind tion o low f1 condit in th ypass loops associated th any actor c-ant 1 Plow 11 be D md:/
1.
rior t /Ireator tempera e channe to normal rvice foil reop of byp loop st valves ever a b
a loop p d been ou f servic 2.
On a ic bas
, and
- " -- = 7 t --- 17 1r fir 211 _.
In addition, channel deviation sips.ls in the control system wi
_ ghean alars if any temperature channel deviates significantly free t
retir ::M (hi?::t) value. Automatic rod withdrawal blocks and turbine runback (power demand reduction) will also occur if any two out of the three overtemperature or overpower AT channels indicate an adverse condition.
7.2.2.3.3 Pressuriser Pressu;=e The pressuriser pressure protection channel signals are used for high and low pressure protection and as inputs to the overtemperature AT trip protection function.
Separate control channels are used to control pressuriser spray and heaters and pressuriser power-operated relief valves (PORVs).
Pressuriser pressure is sensed by fast response pressure transmitters.
A spurious high pressure signa).com one channel can cause decreasing pressure by actuation of either spray or relief valves.
Additional redundancy is provided in the low pressuriser pressure reactor trip
)
7.2-32
INSERT C The input signals (one per loop) to the Reactor Control System are obtained from electronically isolated protection Tavg and Delta-T signals. A Median Signal Selector (MSS) is implemented in the Reactor Control System, one for Tavg and one for Delta-T. The MSS receives three signals as input and select:,
the median signal for input to the appropriate control systems. Any single failure, high or low, in a calculated temperature will not result in an adverse control system response since the failed high or low temperature signal will be rejected by the MSS.
Hence, the implementation of a MSS in the Reactor Control Sptem in conjuction with two out of three protection logic satisfies the requirements of IEEE 279-1971, Section 4.7, " Control and Protection System Interaction".
The response time allocated for measuring RCS hot and cold leg temperatures
~
using thermowell mounted fast response RTDs is four seconds. This response time does not include the process electronics.
1
(
s I
i i
'~'
BVP8 2 UFSAR 7.
Steam dusp control (e
a.
Permits BVPS-2 to accept a sudden loss of load without incurring reactor trip.
Stoan _is dumped to the condenser as necessary to accommodate excess power generation in the reactor during turbine load reduction transients, b.
Ensures that stored energy and residual heat are f
removed following a reactor trip to bring BVPS 2 to equilibrina no load conditions without actuation of the steam generator safety valves.
c.
Maintains BVPS-2 at no load conditions and pee m.ts a manually controlled cooldown of the nuclear pinnt.
8.
Incore instrumentation Provides information on the neutron flux distribution and on the core outlet temperatures at selected core locations.
7.7.1.1 Reactor Control System The reactor control system enables BVPS-2 to follow load changes automatically including the acceptance of ; step load increases' or decreases of 10 percent, and ramp increases or decreases of
(
5 percent / min within the load tange of.15' to 100 percent without reactor trip, steam dump, or pressure relief (subject to possible xenon limitations). The system is also capable of restorf.ag coolant average temperature to within the programmed temperature deadband following a change in 16ad.
Manuti control ' rod ope. ration may be performed at any time.
The resctor control system controls the. reactor coolant average temperature by regulation of control rod bank position. The reactor coolant loop average temperatures art determined from hot leg and cold leg measurements in each reactor coolant loop.
There is an average coolant temperature (T,yg) computed for each loop, wheret
+T hot eoid T
=
avs 2
(7.7-1)
)
The error between the programard reference temperature (based on turbine impulse chamber pressure) and the avd;' e;ga 'h T^V8
- t of the measured temperatures (which is processed throug a laad lag compensation unit) from each of the reactor coolant loops constitutes the primary control signal, as shown in general on Figure 7.7-1 and in acre detail on the functional diagram, Figure 7.2-1, Sheet 9.
The system is capable of restoring coolant average. temperature to the programmed value following a change in load. The programmed coolant
(
linearly with turbine load from aero power to temperature increases 7.7-3
i BVPS-2 UFSAR t
&n5.ts
$hesl53 g
the full power cendition.
The4 T, piso supplies : ; i - '. to W4.
i pressurizer level control steam dump control, and rod insertion limit monitoringg cee/ra/ y, p/emas, l
i
(
a_ _,_
- ___x, x_c.
a.
als'f["tle[eactgcontro[sistEsa[E3hkica1ds's
~
f'r$
l at te t-
--c-~
Mn.' &c. }t: z.. Lor injeW5 h +nie 'eadhofsysn4m&J ere M*'*j i
M$my N e swe dan Sy d te/ refer; An additionar control input signal is derived from the reactor power t
versus turbine load mismatch signal. This additional control input i
signal improves system performance by enhancing response and toducing transient peaks.
7.7.1.2 Rod Control System 7.7.1.2.1 Rod Control System The rod control system receives rod speed and direction signals froa the T, control system. The rod speed demand signal varies over the corresponding range of 8 to 72 stepat/ min depending on the magnitude of the input signal. Manual control is provided to move a control bank in or out at a prescribed fixed speed.
When the turbine load reaches approximately 15 percent of rated load,'
the operator may select the automatic mode, and rod motion is then controlled by the reactor control system.
A permissive interlock,
- ')
C-5 (Table F.7-1),
derived-from messurements of turbine impulse chamber and pressure, prevents autotutic control when the turbine load is below 15-percent.
In the automatic mode, the rods are again withdrawn (or inserted) in a predetermined programmed sequence by the automatic programming equipment. The manual and automatic controls are fttrther interlocked with the control interlocks (Table 7.7-1).
1 The shutdown banks are always in the fully withdrawn position during normal operation, and are moved to this position at a constant speed by manual control prior to criticality.
A, reactor trip signal.causes them to fall by gravity iuto the core. There are two stutdown banks.
The control banks are the only rods that can be manipulated under automatic control.
Each control bank is divided into two groups to obtain smaller incremental reactivity changes per step.
All RCCAs in l
a group are electrically paralleled to move simulta.neously.
There is individual position indication for each RCCA.
Power to rod drive mechanisms is supplied by two motor generator sets operating from two separate 480 V three phase buses.
Each generator 1
is the synchronous type and is driven by a 200 hp induction motor.
i The ac power is distributed to the rod control power cabinets through l
the two series-connected reactor trip breakers.
T t
)
7.7-4 l
l
.u~.
~.
. ~.
.~.
.l BVP8 2 UFSAR 1
1.
The low alarm alerts the operator of an appeach to the rod
' (
insertion limits requiring boron addition by following normal procedures with the chemical and volume control i
system (CVCS), and i
{
J 2.
The-low-low alarm alerts the operator to take immediate t.
action to add boron to the RCS by any one of several j
alternate methods.
I i
The purpose of the control bank rod insertion monitor is to give l
warning to the operator of excessive rod insertion.
The insertion i
l limit maintains sufficient core reactivity shutdown margin following reactor trip, provides a limit on the maximum inserted rod worth in i
the unlikely event of a hypothetical rod ejection, and limits rod.
i inaertion such that acceptable nuclear peaking factors are-I maintained.
Since the amount of shutdown reactivity required for the design shutdown margin following a reactor trip increases. with l
Ancreasing power, the allowable rod insertion limits must te i
decreased (the rods must be withdrawn further) with increasing power.
Two parameters which are proportional to power are used as inputs to the insertion monitor. These are the AT between the hot leg and the cold leg, which is a direct function of reactor power, and T,,,,
l which is programmed as a function of power.
The rod insertion monitor uses parameters for each control rod bank as follows:
+
'I Zg = A(AT)
+ B(T, )
+C
~
(7.7-2)
M94liaA M9edhA where:
Zg
= Maximum permissible insertion limit for affected l
control bank I
(AT)eues '4 =
T of all loops d*
(T,y )
N of all loops
,y
{
A,B,C
= Constants chosen to maintain Z 2 actual limit g
based on physics calculations The control rod bank demand position (Z) is compared to Z as follows:
If Z - Z s D, a low alare is actuated g
If Z - Z 5 E, a low-low alarm is actuated g
7.7-11 e
.r
BVP8-2 UFSAR
- 31..
.t.
6,;t....,...
.2 g,__
7;;; g, ___;;___,,;,,
_t I
a '......,.'.in - (-....,'..,'...
n-Actuation of the low alarm alerts the operator of an approach to a reduced shutdown reactivity situation.
Administrative procedures t
require the operator to add boron through the CVCS. Actuation of the i
low-low alars requires the operator to initiate emergency boration i
i procedures.
The value for E is chosen such that the low-low alara
+
would normally be actuated before the insertion limit is reached.
The value for D is chosen to allow the operator to follow normal boration procedures.
Figure 7.7-2 shows a
block diagram I
representation of the control rod bank insertion monitor. The monitor is shown in more detail on the functional
- diagram, I
Figure 7.2-1, sheet 9.
In addition to the rod insertion monitor for i
the control banks, the BVPS-2 computer, which monitors individual rod positions, provides an alara that is associated with the rod deviation alare discussed in Section 7.7.1.3.4.
This alars is provided to warn the operator if any shutdown RCCA leaves the fully withdrawn position.
Rod insertion limits are established by:
i 1.
Establishing the allowed rod reactivity insertion at full power cenststent with the purposes given previously.
1 2.
Establishing the differential reactivity worth of the
)
4 control rods when moved in normal sequence, g
3.
Establishing the change in reactivity with power level by relating power level to rod position, or 4.
Linearizing the resultant limit cus g ild11 key nuclear 1
parameters in this procedure are measdrea 13' part of the initial and periodic physics testing program.
l Any unexpected change in the position of the control bank under automatic control, or a change in coolant temperature under manual-control, provides a. direct and immediate indication; of a change in the reactivity status of the reactor.
In addition, samples are taken periodically of coolant boron concentration. W Variations in concentration during core life provide an additional check on the reactivity status of the reactor, including core depletion.
7.7.1.3.4 Rod Deviattun Alarms The demanded and measured rod position signals are displayed on the main control board. They are also monitored by the BVPS-2 computer, which provides a visual printout and an audible alarm whenever an individual rod position signal deviates from the other rods in the bank by a preset limit.
The alarm can be set with appropriate
]
t-7.7 12
?
r a
w
.w v.
~
w..
v,-or-.
-.---w
-w
---w-'-em-. -, = -
=s--n-,
w-
I BVPS-2 UFSAR i
i 7.7.1.8 Steam Dump Control s
t
)
The steam dump systes, as described in Section 10.4.4, is designed to i
accept an 85 to 100 percent loss of not load without tripping the reactor.
(
ne autosoP steam dump system is able to accommodate this abnormal load rejection and to reduce the effects of the transient. imposed upon the RCS. By passing 90 percent of full load main steam directly to the condenser and atmosphere, an artificial load is thereby maintained on the primary systes. The rod' control system can then i
reduce the reactor temperature to a new equilibrium value without causing overtemperature and/or overpressure conditions. The steaa i
dump steam flow capacity is 90 percent of full load steam flow at l
full load steam pressure.
1 If the difference between the reference T,y (T,,f) based g g rbine impulse chamber pressure and the lead /las compensated aussedummused j
t
$T,yg g exceeds a predetermined amount, and the interlock i
mentioned as.follows is satisfied, a demand signal will actuate the steam dump to maintain the RCS temperature within control range until a now equilibrium condition is reached.
To prevent actuation of steam dump on small load perturbations, an f
independent load rejection sensing circuit is provided.. This circuit i
senses the rate of decrease in the turbine load as detected by the
]!
i turbine impulse chamber pressure.
It is provided to unblock the dump
..)
j valves when the rate of load rejection exceeds a preset value cc,rresponding to a 10 psreent step load decrease or a sustained ramp 1
load decrease of 5-percent / min.
L A block diagram of the steam dump control system is shown on Figure j
7.7-7.
l t
j 7.7.1.8.1 Load Rejection Steam Dump Controller il i
This circuit prevents large increase in reactor coolant temperature i
following a large, sudden load decrease.
The error signal is a difference between the lead / lag compensated T
and the 1
)
reference T* I isbasedonturbineimpulsecham$erpressure,.
Add'acess/apadr#
I The T,y, signal is the same as that us d in the y. The lead / lag e
j compensation for the T,y signal is to compensate for lags in the BVFS-2 thermal response and in valve positioning. Following a sudden load decrease, T is immediately decreased and T,
tends to ref
- increase, thus generating an immediate demand signal for ste.am dump.
.Since control rods are available, in this situation steam dump terminates as the error comes within the maneuvering capability of the control rods.
)
t 7.7-16 6
,--...n
.~,-.--,s.
,...,,-..v,-
- ~ _
?
i i
7.7.1.8.2 Plant Trip Steam Dump Controller
(
I Fo11cwing a reactor trip, the load rejection steam dump controller is 1
i defeated and the reactor trip steam dump controller becomes active.
i Since control rods are not available in this situation, the demand signal is the error signal between the lead /las compensated assedemoseed.T and the no load reference T When the error Apes /arl avs ava.
signal exceeds a predetermined set point, the dump valves are tripped in a prescribed sequence.
As the error signal reducer in open i
magnitude indicating that the RCS T,y, is being reduced toward >he reference no-load value, the dump valves are modulated by the BVPS 2 trip controller to regulate the rate of removal decay heat and thus i
gradually establish the equilibrina hot standby condition.
I Following a reactor trir only, sufficient steam dump capacity is necessary to maintain steam pressure below the steam generator relief j
valve set point (approximately 40 percent capacity to the condenser),
the two groups of valves are opened.
The error signal determines whether a group is to be tripped open or modulated open. The valves are modulated when the error is below the trip open set points.
7.7.1.8.3 Steam Header Pressure Controller i
Residual heat removal is maintained by the stear generator pressurs 4
j controller (manually selected), which controls the amount of steam-i flow to the condensers. This controller operates a portion of the same steam dump valves to the condensers, which are used during the j
initial transient following turbine reactor trip or load rejection.
I 7.7.1.9 Incore Instrumentation The incore instrumentation system consists of chrosel-alueel i
thermocouples, at fixed core outlet positions, and movesble miniature detectors, which can be positioned at the center of selected neutron fuel assemblies anywhere along the length of the fuel assembly vertical axis. The basic system for insertion of these detectors is shown on Figure 7.7-8.
7.7.1.9.1 Thermocouph.a l
The chronel-alueel thermocouples are inserted into guide tubes that penetrate the reactor vessel head through seal assemblies and terminate at the exit flow and of the fuel assemblies.
'The thermocouples are provided with two pr.taary seals, a conosen1 and i
swage type seal from conduit to head.
The thermocouples are supported in guide tubes in the upper core support assembly.
i ThermocovMe readings are monitored by the computer, with backup.
readout provided by a precision indicator with manual point selection
[
located in the main control room.
Information from the incore instrumentation is available even if the BVPS 2 computer is not in service.
7.7-l'7 i
.~
)
The EVPS 2 control systems will prevent an undesirable condition in
);)
s the operation of the nuclear plant that, if reached, will be protected by reactor trip.
The description and analysis of this vi protection is covered in Section 7.2.
Worst-case failure modes of the BVPS-2 control systems are postulated in the analysis of off-design operational transients and accidents covered in Chapter 15, such as the following:
1.
Uncontrolled RCCA withdrawal from a suberitical condition, 2.
Uncontrolled RCCA withdrawal at pow'er, 3.
Misalignment of RCCA, l
i 4.
less of external electrical load and/or turbine trip, 5.
Ioss of all ac power to the station auxiliaries (station blackout),
6.
Excessive heat removal due to feedwatet system malfunctions, 7.
Excessive load increase incident, and 8.
Accidental depressurization of the RCS.
These analyses will show that a reactor trip set point is reached in time to protect the health and safety of the public under these postulated incidents and that the resulting coolant temperatures will
),
produce a DNBR well above the limiting value of 1.30.
Thus, there will be no clad damage and no release of fission products to the RCS under the assumption of these postulated worst-case failure modes of the BVPS-2 control system.
7.7.2.1 Separation of Protection and Control Systems 4
In some cases, it is advantageous to employ control signals derived from individual protection channels through isolation amplifiers contained in the protection channel.
As such, a failure in the control circuitry does not adversely affect the protection channel.
Test results have shown that postulated faults on the. isolated output portion of the circuit (nonprotection side of the circuit) will not affect the input (protection) side of the circuit.
Where a single random failure can cause a control system action that results in a condition requiring protective action and can also prevent proper action of a protection system channel designed to protect against the condition, the remaining redundant protection channels are capable of providing the prottetive action even when degraded by a second random failure.
This meets the applicable 4
requirements in Paragraph 4.7 of IEEE Standard 279-1971.'
TAftA D Q
7.7-20 i
INSERT D The loop Tavg and Delta-T chant.el required inputs to the stem dump system, reactor control system, the control rod insertion monitor and the pressurizer level control system are electrically isolated prior to being routed to the control cabinets. A mediar. signal is then calculated for Tavg and Delta-T in -
the control cabinets utilizing a Median Signal Selector (MSS) for input to the appropriate control systems.
4 I
L l
Y
==-
~ ~
?.
tl
.1 5
si i
ii l.t,c
_fe,r
.c,>
le s,
y
--*[
il l
g<
l llfll,jlr hh.e l.
- l... N.t. i --
N
-l Il "j
=m l
,j...
gp s...
"4S. N ii !l.. il.I!!
Illgl' sg :
i e... g.......
i,
~..
- q....h..... s,.'...\\
....l, --[..y. r.. - - - -----.,r YI,
\\u 4
r 4
i d.
i*
l....}_r.gij l
l,
- l4j...
,i
...;.3..,[...,.. f e[..
, n.;..:..,- -l- --l-cw
- ,';e....r.r.
i
>2.1....\\
4.g.... {, s...t.'.i. 'til e
l.1...
y j
- -f tw&,-- j-\\tjy.7.g,;
n-y r- -
l
[ 'ry-s y ;jg 7,-.,1 ::I:
&-s............,-Rilgl$~pl;;;
i 4e n......v.t...
%. u. It.-gt--,e.gp.
1 t
I i
y b
h6 W-- re' e-mo; :[-p.
,'~...ll4
?9-t s
1
- llii,t.
e g.
u
_m.
.ms[4 y_.
i '--
j%
A f
iif
' D--E Ifbu_l'lHj,_l, f
)
,4 J
d
ym.n, a..
..: ~
- -^
- ~ ~ ~
-~ ~ - -
j m
j g; e
!! l0. i, gl' Il j
r 1
l i '
I:i a !'
i lllllIn N, ; g!-l
- DIk
...._....-_........_%l p :c ji i_
tg a fe
",!hlI ra i
' 'o i.-6,fh ll9 l le !
'. l 1 j..
...__._____________f i
li l
4 1
a i-l[lg-i,,
i g,.;
~
.i n
ol..l._"dc
,l "lhy)
- l l !!.iii, I I
r l
1 I
i l.
_. g.
'f ---]
t,
- ll L........._______..______nqy_ _ _
. _ _....n pt _ _ ;l h j
l gg i,
. _ _ _ _.0 I 'i, 'I UI!
l
_L gf 6 l
rr f
1 a
l-i ae.
i' l!j.
l 1 '[F r.
~'
l i4 l
I4 lpa_---.i:.
a ili J
2; h__
y,
- j. 3.
i-
<wg gl.p '! et ii 91-gj t_3_ :
,j [------9,l,- T al-(,',
TF 9'
d g:
y i
5 g.. _ _ _ _ _ p' I h
[.#:1
.4,
- C y
p ' ~ g-1;1, l,
7 j {,
s o
4' 7
u c _._ _ _ _ g,",.
g laj l #il 4~
C'
- (h
'~
I[p_l_l_j ild 2
l
_ _ _ _ _ _ _ _...g, g--g O! @ 4 a
k
)h
[
lIH
- g L
i-n. f.
I-I f.if.
i..
e b
3p
-m l'.a e
a t
.;_p 1;
d.
- L I."
I Es lg i
[-
)\\
~
Ilf
. I I,l L: mi I
~
i i
n-
- cIb e
q l
d W-
'e g
wm3 l
9:spr?
g yl%
j f
n!
lii.!_
@[I
^
'l
.Hi 8..
nr a agm h5kge s
lM 7
l dl -.4. - ;,- t:.7,h- ;s J 214 llsiAN I
s'
..... o l:lg
-h js
~
y
,l,ig&_
i I(
m I@s14' "I
>!! !.'-:P 8-W gP
.g p;.
!;scj;p:).II
, t:
4-M1 i
.. ('
- ,,r...
,I,I[;
7 n
['**'-* *?.......... _.......g....g
- g. m......./,
d m
l{$
e li l
=f.
i,8 "j
l%
g.;........
I i:
11 l! l Il !
............yJ........g.....llg I
- r. +.w
,r j l....l 9..............................._g.j;,,,
.gi i4 9
!p I
j hk i
y.!: W-
,l l!
' f li j
.~r 13
- Y l.
y y
ll i
e l
l, ef
%ehfN l
t l
i e
- 2:
j...l.,t...... J p.1..e em-p
[1 sr4
=
1s t. 7............;.. e ghb l
is l
g e
- t. 4 li i
s
'---@d l,j, i,,
It L,.114 l
I r
e e
1 l
COLD LIG
- T I
COLD Lt4
- TcLD Ltg i
e i
1 6
4
+
l AvitAGE Avit&GE Avitant l
ftNPitefutt TteetteTutt TtesPttATUtt 1
Us t T LOO P 1 Unif LOOP 2 Unif LOOP 3 av.';'C T,,.';'e
,,,, ' ; 'C.
y A
i m
i r
l Alegastutenage,p AM
)
4 Tuttist (040 l
??......____ _ thN l
NUCLEAR P0wtt $14RAL
)
0 "3
2 DVesp systgu Tuttlet LOAD $16aAL p
f LEAO-LAG P0wtt Ml!NATCH l
AVttAGE COMPtelAT10N CtelPENSAt t 0a i
TEMPitATUtt U#if yell t i
j PROGRdesett I
l I
f 1 '
i l
0 SMED' alANUAL 900 I
U"'I C0 aft 0L l'
==
- fDUPDANT W P *t RIP SI6aAL j
SEQUENTI AL 800 CONTROL Uni 7 (AUTOMATIC C0uf t0L) l i r I
i f REACTOR TelP ettettt I
'PttWi!31vt CitCUff (1100 luf ttLOCE) tt&CTOR TRIP 8ttAtte 2 C0 aft 0L 800 Ottvt 800 DOTES: 1 TitePt.tAfutts att Mt&Sutt0 ACTUATOR I
AT STtAII bthttA10t'$ INLif AND OUTLET,
- 2. Pet $$Utt 18 NEASUtt0 AT TML PetlSuti!Et i t CONTROL 200 DilVE Nttuaal3M 7
FIGUR E 7,7-1 SIMPLIFIED BLOCK DIAGRAM ROD CONTROL' SYSTEM
(
BEAVER VALLEY POWER STATION-UNIT 2 FINAL SAFETY ANALYSIS REPORT l
t
_.,,_,__...,.,.y,.y,.,m.m.,.._,9.
,-.c-,...
y
i i
O O
O
~
I i
i
- LOW ALAmt LOW-LOW ALAtl i
AL:
(TAvslauer I
" A(ai),+ '
tt
[
2
)
M1 MM
{
COWARATOR (at) m l
y
, gy,uj
.c s
m ir.
boda i
J i
j L
j Z
DENAIID SAIIK 4
1 3 -
SlalAL TYPICAL OF ONE CONTROL BAllE i
l IIOTE: 1. ANALOG CIRCUITRY IS USED FOR TWE C00FARATOR NETWORK.
- 2. COMPAtt3011 IS DONE FOR ALL C0llTROL SAINIS i
i FIGURE 7. 7-2 CONTROL 8AMM ROD INSERTION MONITOR i
j BEAVER VALLEY POWER STATION-UNIT 2 i
FINAL SAFETY ANALYSIS REPORT f
~!
i
.. ~...
/pscadm eve
)
Pressurizer i
i Level Signal Level i
Programmer i
i v
t
(+)
(-)
Remote Manual f
. Control u
Pl Controller l
u Auto Manuel Control U
I (Control Room) i To Backup
[
l u
Hester Control.
Auto Manual Control (Ramoto) y Charging Flow Control Valve Position 1
l FIGURE 7.7 5 BLOCK DIAGRAM OF PRESSURIZER LEVEL CONTROL SYSTEM C
BEAVER VALLEY POWER STATION UNIT 2 FINAL SAFETY ANALYSIS REPORT l
l i
_... _ _ _.. _ _ _ _. _. _.. _.. _ _ _,., _. - _.,,.... -. ~. -..., _. _....... -..,. - _
A>9dNl4
$1EAN CUMP CONTROL IN MANUAL N
($TEAN PRE 15URE CONTROL)
T T
gyg ggggggggg
- TURBINE IMPULSE gg ir STAGE PRES $URE NO-LOAD Tgyg RAT!./ LAG COMPENSATION P4 LEAD / LAG 9
REACTOR COMPENSafl0N TRIP LOAD REJECTION BISTABLE I
(' ) {
(+ ) (+ [
(*)
DEFEAT LOAD REJECTION STEAN i
DUMP CONTR0Lt ALLibt PLANT TRIP STIAN g g gyggggg gigtggggs 51EAN DUMP C0liTROL NEADER u
PRE lSURE SET PLANT TRIP PRELSURE CONTR0t,LER 1 r b
(-)
LOAD REJECTION CONTROLLER 1 r 1 r LOAD REJECTION l
CONTROL OR Pl PLANT TRIP l
CONTROLLER U
1r 1r CONTROL LOAD REJECTION CONTROL OR PLANT 1r TRIP CONTROL TRIP OPEN $ TEAM DUMP VALVES NOTE: FOR BLOCKING. UN-l BLOCKING 5:6 MAL TO l
, AUTO (TAyo CONDEN$ER STEAM DUMP NANUAL (STEAN CONTROL)
VA LVES U U 1' PRES $URE
$tt FIGURE 7.24 AIR SUPPLY TO CONTROL)
$NEET to 3,
DUMP VALV*$
N000 LATE CONDENSER DUNP VALVE $
FIGUR E 7.7-7 BLOCK DIAGRAM OF STEAM DUMP CONTROL SYSTEM C
BEAVER VALLEY POWER STATION-UNIT 2 FINAL SAFETY ANALYSIS REPORT l
rw a
qw l; I<
-, xy w.:
Il tl m 2:
t dl
!l
..A.....f.. i
.d.
4!
,I I.!
I C'
$1 i
g
~
.. I,
,[!
g y
gg.
.c.....,
I I
v 4 j.':_Z1 gl lllL y
i 4
q g
l x
y m
p....
.I'd -.F._ g..... ;.,
1 l l
[Og...t,........p t g, ii T'YI d
q..... 4.......
...; u..
Ih!.kJf,...-p..
i[.
- h. p $... 3 i
r c.
t h.......f..I,,4l,l
..., N,, -l-!- T, g.,.
M
],
- ll!.g)}...k~?!~!f
il ji..s.....i.....
ll N i
1.g.
-"?~{G..fl R$lNsh) r-'-!N !!l!
~
'k))]._/f&iljh,:it wppi<jjfig{il
- jj
~ " 2*
v..............
,gg j
g.....g?!}t-1
.I rE}-!ill
)
613j{e -,
g.,
J diJi[- Q)h.4.g.j) g jl_p p.....r,[ag l
p
- nq. g....;
g
- y c, qs )bi=ab z
i~,-4 qr W
+
J_-
tj}-
-[y Q
,.-b j j
n d'
d y,
'" /
gp, ee
.Il
!-l-le l[
[
l 0
l e
}.-
--... _.....-_..-.. I Ij l
hi-------____________.I"},i l li j..
0--:---- cr%--.
i '....Lll' il 1
.2 nl ti ut-a:
_.i.p 9
q-
.r m
- l{
5 ft +
L. -
{
.__ _ _ gn_.g !j l
q, )
I
.-_.. _ _ _ _ _ g.i II'
. I! _
,l
-c fi jy
- l ql s s i e
' l,fj----i;- fl 2:
a t 3.___.
pJ:gjg; u
'l M
[w
.I,
hA-----!gi[
l;sj;
- Mb pn$
f, g,
y. -.. gn i
i l {~h}q 4;f
$~
hj l
1 t iefI q'
3 i.------__ht...---as#,
't C
g.
v f,y h,j
- llI 1C C
4 i
((-
---e7y gb r '
g,, {i 4
T
+
l L
i j )6
, c-
,a
-~
k
'j
____l I in s
,(?!!!
=_
l l
v, ifl k !
- i ga e
+,-
q hjNf
~
@[hj[
'An 4.i u. a g
g
.s,
+
Y h-
}'*
g l
t-g-
N'
'I gt pC rp gil j_-
gg
=l El.,
I!
.i
- J 8
M i
g.
aa Ag; g
3 9
t's I
5 l-H e
'k1 A
m-g
.iliOC g Cg mj f.
,j...g qgp.....!
1+
f qn..,..,, r,.
.+
aiin e,i
.i
... at:i::%n.g g }4,.
.--6 i
f s
g e
g.
$ o f E I
yl:;;.7__ -p',... AIf r 'l _gg,t l
sig ejl
..i
... o
,5. g.
y4..p,._..._..............
g-o l
1
........{g'....... g. I@.! lgj$
]
8 s..Q {---- ----2 --- -- % R-4till y[A~~; ' ' " ' ~ " ' ~ ~ ~ ~ ~~ ~~~ " '
i e
3.
@>-@h J$ Y
., l l--.-
ha{ ij g
li f.t
- ij g;-
!!!{!l 4 L._.lDr 18 g ;I j.-
l 1
11!!
'[
11:j!
l.
5
@!*;l 3A l
ii il
-[t@-4 1
l
?.?
j... t...... J p. t..e ff<
U823h l[
fi............... i..d{ 4 Ll j.
il[!
F - 4
.hl 1,::i
.I i
I jg l 4 I
9 f
e 4
i l >l.i I
i pu.
,')
e h
'94
- i s'. $ I -
- d.
e
~, _ _