MONTHYEARML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days1994-11-22022 November 1994 Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe1994-09-0606 September 1994 Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe ML20072S0741994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072S0331994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Setpoint for Reactor Pressure to Isolate Shutdown Cooling Sys ML20072R9891994-09-0606 September 1994 Application for Amend to License DPR-35 Involving Proposed Administrative Change to TSs Re Control Room Annunciator. Amend Involves Relocation of Alarms for Drywell Suppression Vacuum Breakers ML20069M3181994-06-0909 June 1994 Application for Amend to License DPR-35,revising TS to Increase Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys.Proposed Change Also Made to Section 4.5.H, Maint Of...Discharged Pipe to Reflect Amend 149 ML20067B6941994-02-0909 February 1994 Application for Amend to License DPR-35,proposing Changes to TS by Revising Wording for Page 3 of License DPR-35,adding Clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion ML20058N0131993-12-10010 December 1993 Application for Amend to License DPR-35,proposing Changes to Ts,Re Request for Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20062J3311993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to Remove Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint BECO-93-133, Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors1993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0411993-08-0909 August 1993 Application for Amend to License DPR-35,proposing 24 Month Fuel Cycle ML20044G1251993-05-20020 May 1993 Application for Amend to License DPR-35,revising TS Re MSIV Turbine Inlet Low Pressure Setpoint to Reduce Potential Spurious Isolations Caused by Existing Higher Setpoint.Ge Repts MDE-70-0586 & NEDO-31296 Encl ML20128P3651993-02-11011 February 1993 Application for Amend to License DPR-35,changing TS to Increase Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changing Max Loads Allowed to Travel Over Spent Fuel Assemblies to 2,000 Lbs.Holtec Rept HI092925 Encl BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii)1992-10-30030 October 1992 Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) BECO-92-121, Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time1992-10-23023 October 1992 Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time BECO-92-116, Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations1992-10-0808 October 1992 Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.971992-08-17017 August 1992 Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 BECO-92-097, Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations1992-08-10010 August 1992 Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations BECO-92-079, Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions1992-07-24024 July 1992 Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing1992-04-0808 April 1992 Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests1992-02-0707 February 1992 Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests ML20086J5411991-12-0606 December 1991 Application for Amend to License DPR-35,revising Section 3/4.9, Auxiliary Electrical Sys,To Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO1991-10-24024 October 1991 Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR1991-10-0707 October 1991 Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR BECO-91-076, Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years1991-06-11011 June 1991 Application for Amend to License DPR-35,revising Thermal & Pressurization Limit Curves of Tech Specs Figures 3.6.1 & 3.6.2 & Adding New Curve to Figure 3.6.3 to Cover Operation Between 10 & 32 Effective Full Power Years BECO-91-052, Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant1991-04-10010 April 1991 Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant 1999-06-16
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20196D0071999-06-16016 June 1999 Application for Amend to License DPR-35,changing TS Re Reactivity Control by Incorporating Operating Requirements That Are Consistent with NEDO-21231, Banked Position Withdrawal Sequence ML20206R8101999-05-11011 May 1999 Application for Amend to License DPR-35,requesting NRC Review & Approval of Change to TS Section 3/4.5.C, HPCI, Sys,Section 3/4.5.D, RCIC Sys & Bases Associated with Sections ML20206H9651999-05-0505 May 1999 Application for Amend to License DPR-35,modifying Licensing Basis for EDG on-site Diesel Fuel Storage Requirement & Corresponding TSs ML20203B5721999-02-0505 February 1999 Redacted Application for Amend to License DPR-35, Transferring FOL & Matls License 20-07626-04 from Boston Edison to Entergy Nuclear ML20202B4821999-01-21021 January 1999 Application for Amend to License DPR-35,using New Values for post-accident Containment Pressure in Plant NPSH Analyses Performed for ECCS Pumps.Calculations Supporting Request, Encl ML20198G5731998-12-21021 December 1998 Application for Amends to License DPR-35 & Matls License 20-07626-04,transferring PNPS from Boston Edison to Entergy Nuclear.Proprietary Info Encl.Proprietary Info Withheld. Pages 608 Through 621 of Incoming Submittal Not Included ML20249C7081998-06-26026 June 1998 Application for Amend to License DPR-35,correcting Typos & Updating Bases.Changes Are Considered Administrative ML20217H2681998-03-25025 March 1998 Application for Amend to License DPR-35,modifying Tech Specs 3.6.A.1 & 4.6.A.1 as It Pertains to Primary Sys Boundary, Thermal & Pressurization Limitations & Surveillance Requirements & Basis 3/4.6.A.Calculation Encl ML20203D4851998-02-20020 February 1998 Application for Amend to License DPR-35,to Change TS 3/4.5.B & Bases to Incorporate Ultimate Heat Sink Temperature 75 F, as Required by Amend 173.Request Fulfills Commitment to Submit TS Amend for UHS Temperature by First Quarter 1998 ML20203A0781998-02-11011 February 1998 Application for Amend to License DPR-35 UFSAR Section 10.7, Clarifying Design Basis for Salt Water Svc Water Sys BECO-LTR-97-107, Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed1997-10-24024 October 1997 Application for Emergency Amend to License DPR-35,changing TS 3.7.A.5 as Pertains to Periodic Surveillance Testing of Check Valve 30-CK-432.Exemption from LCO Footnote Provides Would Expire When Testing Is Performed BECO-97-096, Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-14331997-09-19019 September 1997 Application to Propose Changes to Tss,Relocating Radioactive Effluent TS & Radiological Environ Monitoring Program to Odcm,Per GL 89-01 & NUREG-1433 BECO-LTR-97-002, Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld1997-01-24024 January 1997 Application for Amend to License DPR-35,requesting Rev to Safety Limit Minimum Critical Power Ratio.Encl Attachment 1 Re Description & Evaluation of Proposed TS Change to Min Critical Power Ratio Safety Limit Withheld ML20135C1271996-11-26026 November 1996 Application for Amend to License DPR-35,modifying Definition 1.M, Primary Containment Integrity, to Include All Instrument Line Flow Check Valves to Make Definition Consistent W/Lco 3/4.7.A.2.a.4 ML20108C0261996-05-0101 May 1996 Application for Amend to License DPR-35 Re Core Alteration & LCO & Surveillance Conditions Associated W/Secondary Containment BECO-96-042, Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control1996-05-0101 May 1996 Application for Amend to License DPR-35,revising Note 7 to Table 3.1.1,note 6 to Table 3.2.C.1 & Section 3/4.4, Standby Liquid Control ML20111B4121996-05-0101 May 1996 Application for Amend to License DPR-35,revising TS to Reflect Implementation of 10CFR50 App J,Option B ML20108C0781996-05-0101 May 1996 Application for Amend to License DPR-35,relocating Administrative Controls Re QA Review & Audit Requirements of Section 6 from Plant TS to Util QA Manual BECO-LTR-96-040, Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant1996-04-25025 April 1996 Application for Amend to License DPR-35,proposing Part of Overall Effort to Improve Outage Performance at Plant BECO-95-074, Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 111995-07-14014 July 1995 Application for Amend to License DPR-35,reflecting Use of Advanced GE-11 Fuel Design in Cycle 11 ML20078N4751995-02-0909 February 1995 Application for Amend to License DPR-35,increasing Reactor High Water Level Isolation Trip Level Setting BECO-94-126, Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days1994-11-22022 November 1994 Application for Amend to License DPR-35,increasing Current EDG Allowed out-of-svc Time in Specification 3.5.F from 72 H to 7 Days ML20078K7881994-11-22022 November 1994 Application for Amend to License DPR-35 to TS Re Change to MSIV Leakage Requirement BECO-94-128, Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-2011994-11-22022 November 1994 Application for Amend to License DPR-35,revising Suppression Chamber Water Level Operating Range,Increasing & Revises Water Level Recorder Range in Response to Commitment from Insp 50-293/91-201 BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly1994-11-22022 November 1994 Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly ML20072S0741994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Standby Gas Treatment & Control Room High Efficiency Air Filtration Sys Requirements ML20072S0331994-09-0606 September 1994 Application for Amend to License DPR-35 Re Proposed TS Change to Setpoint for Reactor Pressure to Isolate Shutdown Cooling Sys ML20072R9891994-09-0606 September 1994 Application for Amend to License DPR-35 Involving Proposed Administrative Change to TSs Re Control Room Annunciator. Amend Involves Relocation of Alarms for Drywell Suppression Vacuum Breakers BECO-94-098, Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe1994-09-0606 September 1994 Application for Amend to License DPR-35,requesting Change to Reflect Standard TSs Re Maintenance of Filled Discharge Pipe ML20069M3181994-06-0909 June 1994 Application for Amend to License DPR-35,revising TS to Increase Allowed out-of-service Time from 7 Days to 14 Days for Ads,Hpci & RCIC Sys.Proposed Change Also Made to Section 4.5.H, Maint Of...Discharged Pipe to Reflect Amend 149 ML20067B6941994-02-0909 February 1994 Application for Amend to License DPR-35,proposing Changes to TS by Revising Wording for Page 3 of License DPR-35,adding Clarifying Words to Aid Operators & Removing Obsolete Mechanical Snubber Acceptance Criterion ML20058N0131993-12-10010 December 1993 Application for Amend to License DPR-35,proposing Changes to Ts,Re Request for Changes Supporting 24 Month Fuel Cycle (Submittal 3) ML20059J1651993-11-0404 November 1993 Corrected Amend 149 to License DPR-35,correcting Administrative Errors ML20062J3311993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to Remove Low Condenser Vacuum Scram in Order to Reduce Spurious Scrams,Unnecessary Plant Transients & Turbine First Stage Pressure Setpoint BECO-93-133, Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors1993-10-19019 October 1993 Application for Amend to License DPR-35 Proposing Changes to TS by Removing Scram & Group 1 Isolation Valve Closure Functions Associated W/Msl Radiation Monitors ML20046D0411993-08-0909 August 1993 Application for Amend to License DPR-35,proposing 24 Month Fuel Cycle ML20044G1251993-05-20020 May 1993 Application for Amend to License DPR-35,revising TS Re MSIV Turbine Inlet Low Pressure Setpoint to Reduce Potential Spurious Isolations Caused by Existing Higher Setpoint.Ge Repts MDE-70-0586 & NEDO-31296 Encl ML20128P3651993-02-11011 February 1993 Application for Amend to License DPR-35,changing TS to Increase Allowed Fuel Assembly Storage Cells from 2,320 to 3,859 & Changing Max Loads Allowed to Travel Over Spent Fuel Assemblies to 2,000 Lbs.Holtec Rept HI092925 Encl ML20127P5311993-01-25025 January 1993 Amend 145 to License DPR-35,revising TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per-cycle & Performance Discharge Test Every Five Yrs BECO-92-126, Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii)1992-10-30030 October 1992 Application for Amend to License DPR-35,revising TS Sections 1.0,4.3,4.4,4.5,4.6,4.7 & Associated Bases to Conform SRs for ASME Code Class 1,2 & 3 Pumps & Valves to IST Program, Per 10CFR50.55a(g)(5)(ii) BECO-92-121, Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time1992-10-23023 October 1992 Application for Amend to License DPR-35,proposing Changes to TS Section 2.1, Safety Limits, to Reflect Use of Advanced GE-10 Fuel Design & Section 3.3.C, Scram Insertion Times, to Correct Error in Control Rod Scram Insertion Time BECO-92-116, Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations1992-10-0808 October 1992 Application for Amend to License DPR-35,consisting of Temporary Change to TS Sections 3.7.B.1.C,3.7.B.1.e, 3.7.B.2.a & 3.7.B.2.C,requiring Both Trains of SGTS to Be Operable During Irradiated Fuel Handling Operations BECO-92-101, Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.971992-08-17017 August 1992 Application for Amend to License DPR-35,changing TS 3/4.2 Re HPCI Instrumentation to Support Mod Planned During Refueling Outage 9 of Control Conduit for Several Valves in HPCI Indication in CR Per Reg Guide 1.97 BECO-92-097, Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations1992-08-10010 August 1992 Application for Amend to License DPR-35,revising TS Surveillance Requirements & Associated Bases for Station Batteries to Conform W/Industry Practices & Mfg Recommendations BECO-92-079, Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions1992-07-24024 July 1992 Application for Amend to License DPR-35,revising TS Sections 3/4.5,3/4.7 & 3/4.9 & Associated Bases to Incorporate LCO & SRs for Shutdown Cooling Sys & Core Standby Cooling Sys During Shutdown & Refueling Conditions BECO-92-039, Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing1992-04-0808 April 1992 Application for Amend to License DPR-35,changing TS Section 4.7 Re Primary Containment Integrity to Remove Words Each Operating Cycle for MSIV & Personnel Airlock Door Testing BECO-92-012, Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests1992-02-0707 February 1992 Application for Amend to License DPR-35.changing TS to Extend Reactor Protection Sys Instrumentation Surveillance Test Intervals from 1 Month to 3 Months to Provide for 12 & 6 H Allowable out-of-svc Times for Repairs & Tests ML20086J5411991-12-0606 December 1991 Application for Amend to License DPR-35,revising Section 3/4.9, Auxiliary Electrical Sys,To Incorporate Surveillance for Inverters Associated W/Hpci & RCIC Sys BECO-91-136, Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO1991-10-24024 October 1991 Application for Amend to License DPR-35,changing Tech Spec 3.5.D.2, RCIC Sys,Under Exigent Circumstances to Provide Limited Extension of 7-day LCO BECO-91-127, Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR1991-10-0707 October 1991 Application for Amend to License DPR-35,revising TS Section 3/4.12, Fire Protection, Per Generic Ltr 88-12.Amend Will Relocate Most of Existing Fire Protection TSs Into Fire Protection Program Ref in FSAR 1999-06-16
[Table view] |
Text
W~ j l n
!J k BOSTON EDISON hignm Nuclear Power Staton Roar Hm Hood Pymouth. Monachusetts 02300 January 22, 1991 George W. Davis BECO 91-005 r.,nio, vo newent - Nudw U.S. Nuclear Regulatory Commission Document Control Dest Hashington, DC 20555 License DPR-35 Docket 50-293 PROPOSLD TECHNICAL SPECIflCATION AVERAGE POWER RANGE MONITOR, ROD BLOCK MONITOR AND_HCM1CONCILIMLO!LIRPRONfMLNT PROERM Boston Edison Company proposes the attached revisions to the Technical Specifications, Appendix A of Operating License DPR-35 for the Pilgrim Nuclear Power Station in accordance with 10CFR50.90.
The proposed revision to the Technical Specifications eliminates the setdown requirements for the Average Power Range Monitor flow referenced rod block and scram lines and changes the Rod Block Monitor rod block setpoints from flow-biased to power-dependent. The revisions will enhance plant availability by facilitating more rapid power ascensions.
The bases for our proposed Technical Specification Changes are described in General Electric Report, NEDC-31312-P. This GE proprietary document is submitted along with an affidavit, requesting that the GE Report be withheld frnm public disclosure in accordance with 10CFR2.790(b)(1).
(
d[6 h, G. H. Davis Commonwealth of Massachusetts)
County of Plymouth )
Then personally appeared before me, George H. Davis, who being duly sworn, did state that he is Senior Vice President - Nuclear of Boston Edison Company and m that he is duly authorized to execute and file the submittal contained herein eME in the name and on behalf of Boston Edison Company and that the statements in Og(t said submittal are true to the best of his knowledge and belief.
SS
$ Hy commission expires: difdD" n
MMhf l
&k(A<
et O DATE NOTARY P B.lC 88 /
p Atta:hments: A. Description of Proposed Changes B. Replacement Technical Specification Pages 3$ C. Marked-Up Technical Specification Pages N'
O. GE Report, NEDC-31312-P (One Copy, Proprietary)
I signed original and 37 copies &
/ :J86 84E
- e next page j y g,
805T0N EDISON COMPANY U. S. Nuclear Regulatory Commission Page 2 >
cc: Mr. R. Eaton, Project Manager Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Mail Stop: 14D1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U. S. Nuclear Regulatory Commission Region !
475 Allendale Road -
King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 2nd floor Boston, MA 02111 WGL/ cab /5003 i
i l
i a
i i
l t
l ATTACHMENT A TO BECO 91-D[SfRIPTION OF PROPOSED CHANG ( 4 I
!$0EQ1[0 CHANGES Boston Edison Company proposes to implement everage Power Range Monitor, Bod Block Monitor, and Iechnical Specification (ARTS) Improvement Program for Pilgrim Nuclear Power Station (PNPS) during the scheduled Refueling Outage #8 (Rf0#8). The ARTS improvement program is described in the attached General Electric Report, " ARTS Improvement Program Analysis for Pilorim Nuclear Power Station (PNPS)", NEDC-31312-P. The princinal objectiver 0f the ARTS program are:
- 1) Elimination of setdown requirements for the Average Power Range Monitor (APRM) flow-referenced rod block and scram lines, and
- 2) Elimination of the rod block monitor (RBM) rod blocks during power ascensions.
Realizationoftheseobjectiveswillenhanceplantavailabilitybyfacilitating more rapid power ascensions and man-machine interface improvements in plant operations.
The ARTS Improvement Program affects the APRM system, the RBM system and Technical Specifications. The APRM system is affected oy eliminating the requirement to setdown the APRM flow-referenced rod block and scram setpoints when the fraction of rated power (FRP) is less than the maximum fraction of limiting power density (MfLPD). No APRM system hardware changes are involved. The RBM is affected by replacing the flow-biased RBH trips with power dependent trips, eliminating RBM trip resets, reassigning local power range monitors (LPRMs) in the RBM selection matrix, normalizing the RBM signal
, to a fixed reference instead of the APRM signal, introducing filtering and delaying elements in the RBM circuitry, and simplifying the RBM operability criteria. Technical Specifications are affected by the changes just described for the RBM and APRM systems, and by thermal limits made dependent on both power and flow.
BASIS FOR CHANGE The ARTS improvement program affects both the APRM and RBM systems. These are part of the Neutron Monitoring System. The bases for the ARTS improvement program are described in the attached GE Report, NEDC-31312-P.
l i
Page 1 of 7 j l
l
I
. 1 A. Safety functions of Af fected SystemJlComponents Of the APRM and RBM systems, only the APRM system has a safety design basis.
This safety design basis requires the APRM to generate a scram signal in response to average neutron flux increases to prevent fuel damage resulting from abnormal operational transients or control rod drop accidents. The PNPS safety analyses are based upon this scram signal being generated at 120% of ;
rated core thermal power. This setpoint is not affected by the ARTS '
improvement Program.
In addition to generation of a reactor trip at 120% of rated core thermal power, the APRM provides a signal for comparison to recirculation-drive-flow-referenced control rod withdrawal block and reactor scram trip setpoints. A trip of the control rod block setpoint prevents withdrawal of control rods when core power approaches the flow-referenced reactor scram trip setpoint, possibly avoiding a reactor scram. A trip of the flow-referenced reactor scram setpoint anticipates a reactor scram from the 120% APRM setpoint. The safety analyses are not dependent upon the flow-referenced APRM setpoints because the recirculation drive flow converter is non-safety-related. (The flow converter is safety-related from a pressure boundary perspective, non-safety-related from an electrical trip standpoint.)
Both flow-referenced APRM setpoints will be affected by the ARTS Improvement Program.
The RBM system has no safety design basis and, accordingly, is classified as a-non-safety related system. Nevertheless, the RBM protects against fuel damage by preventing rod withdrawal when the RBM signai exceeds the RBM rod block setpoint. The RBM rod block setpoint is chosen such that no fuel damage occurs as a result of a single rod withdrawal error under the worst permitted conditions of LPRM or RBM bypass. The RBH system will be affected by the ARTS Improvement Program.
in r f f ec t on f un c t i on s o f A f f ec tM_C0gmnqnenh The ARTS Improvement Program does not affect the ability of the APRH and RBH to limit fuel damage in the event of abnormal operational transients or control rod drop accidents. The sole safety function required of the APRM system, the high-flux scram at 120% of reactor core thermal power, is unaffected by ARTS.
The non-safety related functions performed by the APRM, the flow-referenced APRM rod block and scram, are affected by elimination of the setdown requirement when Maximum fraction Limiting Power Density (MFLPD) exceeds fraction of Rated Power (FRP). Elimination of the APRM setdown requirement not only increases the flow-referenced APRM rod block and scram setpoints but allows increased power peaking at reduced core power levels. The transient safety analysis does not depend upon the APRM flow-referenced rod block and scram setpoints, and, consequently, will not directly impact thermal operating limits. The thermal operating limits are indirectly impacted by the increased power peaking made possible by elimination of the APRM setdown requirement.
This indirect impact is accounted for by the power-and-flow-dependent thermal operating limits introduced with ARTS.
l l
Page 2 of 7
i s
1 The RBM has no safety-related function to be affected by ARTS. However, ARTS has a significant effect on the non-safety-related function of the RBM. ARTS eliminates the flow-referenced RBM setpoints, replacing these setpoints with power-dependent setpoints. The power-dependent setpoints continue to provide protection of the minimum critical power ratio (MCPR) safety limit in the event of a rod withdrawal error (RWE) while essentially eliminating RBM rod blocks during plant maneuvers. Also, ARTS provides a rigorous definition of the limiting rod pattern. Prior to reaching the limiting rod pattern, any rod may be fully withdrawn without violating the MCPR safety limit. Hence, RBM operability is not required. Finally, ARTS reassigns the LPRMs in the RBH selection matrix and introduces filtering and delaying elements in the RBM electronics. These modifications yield a RBM response which more accurately reflects the change in MCPR associated with a change in rod position. A more accurate RBM response permits RBM setpoints to be defined which proiect the MCPR safety limit without unnecessarily penalizing operational flexibility.
C. lLn11ysis of Fffect on Safety _Luu.c.UAni Limiting transients were analyzed over the range of power and flow conditions permitted by the PNPS power / flow map to develop plant operating limits (MCPR and maximum average planar linear heat generattoa rate (MAPLHGR)) which assures margins to fuel integrity limits are equal to or largrr than those in existence at the present time. All transient analyses were performed using the standard transient reload licensing methodology with the exception of the loss of feedwater heating (LfWH) event. The LfHH event was analyzed using standard striady-state physics methods, also part of the reload licensing methodology.
These methodologies are documented in References 1 and 3 of GE Report, NEDC-31312-P. Results from these transient analyses were used to establish limits on MCPR and MAPLHGR versus both power and flow which are suf ficiently conservative to be applicable on a generic basis for all GE fuel through GE fuel type GE7. At any given core state, both power- and flow-dependent MCPR and MAPLHGR limits must be determined. The govarning limits will be the maximum MCPR and the minimum MAPLHGR.
Standard LOCA analyses are performed at or near rated power and flow conditions. At reduced core flow, boiling transition can occur sooner than in the licensing-basis LOCA analysis. Heat transfer is significantly reduced during the period between departure from nucleate boiling and core recovery.
This earlier departure from nucleate boiling results in a longer period of reduced heat transfer and, hence, increased cladding heatup. To compensate, a MAPLHGR multiplier of 0.95 is applied for core flows less than 907. of rated.
This multiplier was originally derived to take credit for the reduction in maximum linear heat generation rate (MLHGR) imposed by setdown of the flow-biased APRM rod block and scram. Since ARTS will eliminate the APRH setpoint requirement, the MAPLHGR multiplier was reevaluated. This-reevaluation showed a MAPLHGR multiplier of 0.95 remains adequate with power peaking constrained by the power- and flow-dependent thermal limits introduced by ARTS.
Page 3 of 7 E __ _ _ _ _ - _ _ __ _ - - -
lhe nee kBM system for PNPS required a new Rod Withdrawal Error (RHE) analysis to determine RBH setpoints which protect the MCPR safety limit. This analysis is documented in GE Report NEDC-31312-P. This new statistically-based analysis provides 95% confidence that the MCPR safety limit will hot be violated in 95%
of the RHE initiated from a limiting rod pattern with the more sensitive RCH channel bypassed. This analysis is valid for application to all PNPS cores utilizing GE fuel designs through GE/ and covers the entire range of power / flow combinations permitted by the power / flow map. To provide a bounding analysis, rod patterns were modified to reduce MCPR in bundles near deep rods to approximately 1.20. The initial positions of the selected error rods were either fully inserted near the bundles with the limiting MCPR or withdrawn to the point where a RBM rod block was required to limit MCPR. LPRMs were conservatively assumed to fail randomly with a probability of 15%. This analysis also assumes a MCPR safety limit of 1.07, a value which conservatively bounds any lower MCPR safety limit.
The RBM automatically accounts for inoperative LPRMs by comparing the input signal from each LPRM with a predetermined reference signal. If the LPRM input signal is less than_the referente signal, the LPRM is automatically bypassed in the RBM averaging electronics. A count of the active LPRMs providing input to the RBM averaging electronics is made and the rod withdrawal permissive removed if more than 50% of the LPRMs are bypassed. While the RHE analysis assumes a 15% LPRM failure probability as a failure rate which bounds historical performance, a sensitivity study in the ARTS analysis indicates the severity of a RHE is only weakly dependent on the LPRM failure rate. Hence, the 50%
criteria for operability is acceptable.
Results from the RHE analysis are the basis for the RBH setpoints. The RBH setpoints are chosen such that the RHE is never the bounding transient. The power dependence of the RBH setpoints reflects the greater margin to the MCPR safety limit which must be preserved at lower powers for the bounding transient; that is, the RBM setpoints are increased as power is reduced. Below the low-power setpoint, tne RBM is not required to protect the MCPR safety limit in the event of a RHE and RBH trips are automatically bypassed. Ah APRM signal is used by the RBM to determine core thermal power and the appropriate rod block setpoint. An allowable value for the downscale trip setpoint of 90%
and a nominal trip setpoint of 94% provide sufficient margin to the 100% fiked reference signal to accommodate reverse power effects from rod withdrawals while serving to prevent control rod movement when RBM signals are abnormally low. An abnormally low RBH signal is an indication of a RBM system malfunction. The 90% allowable value for the downscale trip setpoint provides a maximum margin of 10% to the 100% reference level. The current RBM system has a minimum allowable downscale trip setpoint of 5%, providing a margin of 95% to a RBM signal normalized to an APRM reading of 100%. The 95% margin for the downscale trip setpoint for the current RBM system makas it apparent the 10% maximum margin for the ARTS RBM system is a conservative indication of RBM system inoperability.
Page 4 of 7 '
Two adjustable filters are provided in the new RBM electronics. The RBM signal itself is filtered to reduce signal nolse. Since the filtered signal lags the unfiltered $1gnal, the RBM setpoint for the filtered signal is reduced from the value corresponding to the unfiltered signal to preserve the same MCPR margin.
The RBM setpoints also reflect an allowance for instrument inaccuracy. A filter is also provided for the APRM signal input to the power-dependent trip selection logic. This filter improves the accuracy of the trip selection logic by reducing noise and oscillation between setpoints. This filter is compatible with the RBM setpoints over its full range of adjustment.
The new RBM electronics also include two adjustable time delay devices. One device delays the gain adjustment and signal normalization for a period following rod selection. This delay allows the filtered RBH sipnal to approach its asymptotic value. No rod withdrawal is possible during this period. Since a premature gain aojustment and signal normalization would result in a conservatively high RBM signal and a premature rod block, the magnitude of this delay is unrestricted. Pilgrim does not plan to use the second time delay device.
Operability of the RBM system is required when operating with a limiting rod pattern. A limiting rod pattern exists when the complete withdrawal of any rod in the core would result in violation of the MCFR safety limit. As part of the generic RWE analysis for PNPS, a limiting rod pattern was found to exist when:
for power < 90%, MCPR <1.70 for power 1 90%. MCPR <l.40 The analytical methods supporting the ARTS Improvement Program for PNPS are documented in GE Report NEDC-31312-P together with results for reloads with GE fuel types through GE7. The same methodology will. be applied as needed to future fuel types analyzed using reload licensing methodology and the results will be incorporated in the Core Operating Limits Report.
Page 5 of 7
. 1 DITERMINATION Of NO SLCNIf! CANT HAZARDS CONSIDERATIQH The Code of federal Regulations (10CFR50.91) requires licensees requesting an (
amendment to provide an analysis, using the standards in 10CFR50.92, that determines whether a significant hazards consideration exists. The following J j
analysis is provided in accordance with 10CFR50.91 and 10CFR50.92 for the proposed amendment to Pilgrim's APRM and RBM Setpoints during power ascension.
- 1. APRM (HANGES A. The proposed change does not involve a significant increase in the probability or consequences of an accident previously eva'e ated because the proposed change does not create new transients, incrLse the frequency of the transients analyzed, or change governing design criteria. The elimination of APRM setdown requirements provide the same extent of protection as the existing setpoints, because these setpoints have no influence or impact on the design basis accidents.
Information presented in NEOC-31312-P shows that the consequences of accidents and transient events which might be affected by implementation of the ARTS program are bounded by the consequences of the same events initiated from current licensing basis conditions, provided the appropriate adjustments to the operating limits are utilized. The proposed Technical Specification changes will assure that needed adjustments are made.
B The possibility of an accident or malfunction of a different type than analyzed in the FSAR does not result from this change. No changes are proposed which introduce new initiating events. No changes are proposed that affect the reliability or performance of equipment serving a safety function. Therefore, e new failure modes are introduced by the proposed changes in th setpoints for this instrumentation.
C. The proposed change does not involve a significant reduction in the margin of safety since the PNPS safety analyses are based upon an APRM scram signal at 1207. of power. This setpoint is unchanged by this submittal. The elimination of the APRH setdown requirement is compensated by new flow and power dependent thermal operating limits l which ensure safety margins equal to or larger than those in present Technical Specifications,- ]
1 l
l Page 6 of 7 J
2, RBH CHAN$[S A. The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaivated because it does not create new transients, increase the frequency of existing transients, or change the governing design crlteria.
Information presented in NEDC-31312-P shows that the consequences of accidents and transient events which might be affected by implementation of th? ARTS program are bounded by the consequences of the same events initiated from current licensing basis conditions, provided the appropriate adjustments to the operating limits and RBH setpoints are utilized. The proposed Technical Specification changes will essure that needed adjustments are made.
B. The proposed change does not creats the possibility of a new or different kind of accident fron, eny accident previously evalutted because the upgraded setpoints in no way influence, impact or contribute to the probability or consequences of any accident. The Technical Specification will continue to require operation within the required margin of safety to ensure fuel cladding intergrity, which precludes release of radioactive materials, thereby assuring compliance with 10CFR 100 limits.
C. The proposed change does not involve a significant reduction in the margin of safety since the new power depenoent RBM setpoints continue to provide protection of the minimum critical power ration (MCPR) safety limit in the event of a rod withdrawal error.
REQUESTED SCd[QULL The proposed Technical Specification Change will enhance plant operating efficiency by facilitating spectral shift operation and more rapid power ascensions. The proposed Technical Specif::ation changes are planned to be utilized during the cycle 9 operation. He request NRC approval immediately after shutdown for Rf0#8, to implement the APRH/RBM hardware, software and
,setpo ni t changes during the outage.