DUKE POWER Goxiwxy P.O. DOx 03180 CHAHLOTTE, N.C. 28242 If AL II. TUCKER TELEPHONE vuarer rup.,
(704) 373-4531 mensam emone.ctum i
November 1, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Ms. Elinor G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370
Dear Mr. Denton:
Attached are responses to concerns related to NUREG-0612, Control of Heavy Loeds at Nuclear Power Plants. Attachment I contains responses to the draft technical evaluation report whicli was transmitted by Elinor G. Adensam's letter of September 9, 1982. Attachment 2 contains the results of an evaluation of load handling operations in the spent fuel pool areas as requested in Section 2.2 of Enclosure 3 to the generic letter of December 22, 1980. Attachment 3 contains the results of an evaluation of load handling operations in the Auxiliary Building as requested in Section 2.4 of Enclosure 3 to the generic letter referenced above.
[
Note that in a conference call with NRC on October 15, 1982 concerning the draft technical evaluation report, it was agreed that this submittal would be delayed until November 1, 1982 in order to include responses to this draft report.
Please contact R. E. Harris (704-373-8771) if there are additional questions or concerns.
l Very truly yours, E
l'&
Hal B. Tucker REH:jfw Attachments cc:
Mr. James P. O'Reilly, Regional Administrator Mr. P. R. Bemis U. S. Nuclear Regulatory Commission Senior Resident Inspe.ttor Region II McGuire Nuclear Station 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 L
8211040137 821101 PDR ADOCK 05000369 p
PM The following are responses to concerns identified in the draft technical evaluation report attached with Ms. Elinor G. Adensam's letter of September 9, 1982:
1.
Problem: Lack of load paths for the diesel generator cranes.
Response: The diesel generator cranes are sole-purpose systems for a single diesel generator; these cranes do not carry heavy loads over other safety-related equipment and are used to service equipment when the diesel generator has been placed out of service in accordance with plant technical specifications. For these reasons, we feel that load paths are not necessary.
2.
Problem: Safe load paths not developed for jib cranes.
Response: Load drops from jib cranes will not affect safe shutdown equipment.
(See Duke's response to Section 2.4 of Enclosure 3 to the December 22, 1980 generic letter.) Therefore, safe load paths are not necessary.
3.
Problem: Safe load paths are not developed for ice condenser bridge cranes.
Response: A general purpose or " preferred" load path will be developed.
Movement of individual loads within the ice condenser will be by the most direct route to this general purpose path for subsequent movement to other areas in the ice condenser. These procedures will be developed by May 1, 1983.
4.
Problem: Safe load paths are not developed for the reactor building polar cranes.
Response: Safe load paths will be developed for the major equipment handled by the reactor building polar cranes by May 1, 1983. This will include the reactor head, missile shields, reactor coolant pumps and motors, reactor coolant pump hatch plugs, reactor internals, reactor internals lifting rig, and the reactor head lifting rig.
5.
Problem: No information has been provided to verify that deviations from established load paths will require written alternatives which must be approved by the plant safety review committee.
Response: Deviations from established load paths will be reviewed and approved by a qualified reviewer as with station procedures 6.
Problem: No information has been provided to determine compliance with Guideline 2, NUREG-0612, Section 5.1.1.(2) for cranes in the Reactor Building.
Response: Duke Power will implement procedures by May 1, 1983 which comply with Guideline 2 NUREG-0612, Section 5.1.1.(2) for cranes in the Reactor Building.
7.
Problem: Insufficient information has been provided to evaluate compliance with Guideline 4, NUREG-0612, Section 5.1.1.(4) concerning special lifting devices.
Response: Duke has requested manufacturers of special lifting devices to provide information for an evaluation of compliance with Guideline 4, NUREG-0612, Section 5.1.1.(4).
When this information is received, Duke will perform the evaluation and notify NRC of the results.
8.
Problem:
(1) Sling selection is not based upon the sum of the static and maximum dynamic loads.
(2) Slings are not marked with the equivalent static load that produces the maximum static and dynamic loads.
(3) Slings restricted in use to only certain cranes have not been clearly marked to so indicate.
Response: No hoists at McGuire are capable of speeds greater than 30 fpm.
In addition, lifts over the reactor vessel and spent fuel acrmally are performed at much slower speeds. Therefore, dynamic loads are small relative to the static loads. Since all slings are manufactured per ANSIB 30.9 with a safety factor of 5, the dynamic loads are of insignifi-cant concern relative to sling integrity. No slings have been restricted in use to only certain cranes.
9.
Problem: Ice Condenser bridge cranes were designed according to the specifications of EOCI-61 instead of CdAA-70. Differences between these standards should be addressed to verify that CMAA-70 requirements are satisfied or provide suitable justification for concluding that the requirements have been satisfied by equivalent means.
Reeponse: Duke's earlier submittal identified the ice condenser bridge crane as a top running bridge, multiple girder, electric overhead traveling crane. The crane has been replaced with four separate under-hung, single girder bridge sranes. Specification CMAA-70 applies to top running bridge, multiple girder, electric overhead traveling cranes.
Since the ice condenser bridge cranes are underhung, CMAA-70 does not j
apply to the design of these cranes.
- 10. Problem: The Licensee has made no statements or conclusions regarding compliance with Interim Protection Measure 1.
Response: McGuire Unit 1 Technical Specification 3.9.7 is comparable to STS 3.9.7 and meets the requirements of Interim Protection Measure 1.
i
- 11. Problem: The Licensee has made no statements or conclusions regarding Interim Protection Measure 6.
Response: The special review required by Interim Protection Measure 6 has been completed and appropriate changes to procedures, training, etc.
have been made.
I DUKE POWER COMPANY MCGUIRE NUCLEAR STATION SPENT FUEL POOLS NUREG 0612 i
1 i
Introduction The information presented in this report is the result of a detailed evaluation of load handling operations in the Spent Fuel Pools at McGuire Nuclear Station.
This information was
.::ested by the NRC in their letter dated December 22, 1980 concerning NUREG-06'2, "The Control of Heavy Loads at Nuclear Power Plants."
Scope This report addresses the requirements set forth in Section 2.2 of Enclosure 3 to the NRC's letter as they pertain to the Spent Fuel Pools at the McGuire Nuclear Station.
Cranes Considered The cranes considered in this review are listed below:
A107a, A107b, A107c A108a, A108b A110a, A110b, A110c A111a, A111b Information on these cranes can be found in Table II' of the previous report sent to the NRC titled, "McGuire Nuclear Station, Auxiliary Building, Spent Fuel Pool Area, Control of Heavy Loads, (NUREG 0612)."
Load Drops There will be two " Load Drops" considered for this evaluation which will encompass all other possible load drop accidents. These two " Load Drops" are,
- 1) Cask Drop Evaluation and 2) Weir Gate Drop Analysis.
- 1) Cask Drop Evaluation An evaluation has been performed to assess the possibility of a spent fuel transfer cask entering the spent fuel pool. This evaluation included analysis of the following three truck casks which are currently regarded as potential candidates for spent fuel transfer intrastation or between McGuire Nuclear Station and Oconee Nuclear Station:
a.
Model No. NFS-4, Nuclear Fuel Services, Inc.
b.
Model No. NLI-1/2, National Lead Company c.
Model No. TN-8, Transnuclear, Inc.
No special equipment is required to handle the Oconee spent fuel cask since cask hoisting equipment at McGuire is similar to Oconee.
The area in which the cask is handled is designed for a 30 foot drop of a proposed 100 ton rail cask and the structure is reinforced concrete with a rock foundation. The cask handling crane stops are located in a position to prevent the cask from being moved into the fuel pool area. The cask area is separated from the spent fuel pool by a three foot reinforced concrete wall.
Local damage to the concrete will be negligible and no safety related equip-ment is located in the cask travel path.
L A description of the analysis and the results of the analysis for the NFS-4 truck cask is given below and in Figure 9.1.2-1A.
The analyses of the NL1-1/2 and TN-8 truck casks are similar to that of the NFS-4 cask and all show that the respective casks will not enter the spent fuel pool.
In order to provide additional assurance that the cask will not fall into the spent fuel pool, the path of the cask will be controlled by application of administrative control as shown in Figure 9.1.2-18.
By requiring the cask to follow either of these paths, the circumstances of Case #3 cannot occur and any potential for the cask falling into the spent fuel pool is negated.
Case #1 - The cask handling crane is assumed to be traveling at its maximum speed of 50 fpm and hits the crane stops nearest the spent fuel pool. The crane stops, and the cask is assumed to continue traveling toward the spent fuel pool rotating about a line through the centerline of the crane drum. The cask continues to swing until the kinetic energy is completely converted to potential energy (i.e. the cask raises up as it rotates about the crane drum).
At the instant the cask swings as cloye to the spent fuel pool as possible, the cable breaks and the cask falls. The conclusion is that the cask falls on the edge of the spent fuel pool wall and falls away from the spent fuel pool due to its center of gravity being behind the wall. See Figure 9.1.2-1A (1 of 3) for an illustration of this case.
Case #2 - The cask handling crane is assumed to be traveling at its maximum speed of 50 fpm and hits the crane stops nearest the spent fuel pool. The crane stops and the cable breaks at the same instant, therefore the cask does not swing but is moving at 50 fpm. The cask is assumed to be at its highest position, which is approximately 4 feet off the floor. The distance the cask travels at 50 fpm in the time it takes for the cask to fall 4 feet is determined and it is concluded that the cask will not hit the spent fuel pool wall but will fall directly into the cask pit. See Figure 9.1.2-1A (2 of 3) for an illustra-tion of this case.
Case #3 - The cask is assumed to be over the edge of the cask pit wall and the cable breaks. The cask either drops on the edge of the wall or the cask is lowered on to the edge of the wall. Either case gives the same initial con-ditions because in the event of a drop the kinetic energy is assumed to be l
absorbed by the cask's bottom energy absorber, as stated in the Safety Analysis Report for the cask. Therefore, the cask's potential energy will cause the cask to tip toward the spent fuel pool wall.
Energy losses at impact with the spent fuel pool wall are conservatively considered and the results of the analysis show that the remaining energy is not sufficient to cause the cask to fall into the spent fuel pool. See Figure 9.1.2-1A (3 of 3) for an illustra-tion of this case.
- 2) Weir Gate Drop Analysis The heaviest objects moved over the Spent Fuel Pool are the two spent fuel pool weir gates. Analysis of the dropping of either one of the two weir gates in the McGuire Spent Fuel Pool shows that some fuel assembly damage could occur. However, the site boundary dose rates for the most severe cases are well within the limits set forth in 10CFR100. These dose rates are presented in Table 15.5-5.
Movement of the weir gate located at the transfer canal (3700 lbs) is not possible without suspending it momentarily above from two to eight spent fuel storage locations. The weir gate at the fuel cask decontamination pit (4200 lbs) is not suspended over the spent fuel pool but does move in very close proximity to i t.
However, each of these gates is supported by two separate cables, either of which is capable of supporting the entire load should the other break. The gates are seldom moved near the spent fuel locations and then only for brief periods of time.
Dose calculations were performed using the methods and requirements of Regulatory Guides 1.25 and 1.109. The release assumptions for these dose calculations are identical to those in Table 15.5-11 except in the weir gate drop analysis the spent fuel pool building filters are available.
(SeeTable15.5-1,E.9)
The Weir gate drop analysis considers two limiting cases. The first case assumes that freshly discharged McGuire fuel assemblies are stored in the pool areas over which the weir gates would be handled. These fuel assemblies will have decayed for 7 days prior to their placement in the pool. A structural analysis of the drop incident indicates that a maximum of 7 McGuire assemblies would be damaged due to storage rack deformation. All fuel rods in each damaged assembly are assumed to be breached and to release all of the gap activity.
This incident results in a two-hour exclusion area boundary dose of 7.8 rem whole body and 200 rem to the thyroid.
For the second case it is assumed that only Oconee fuel assemblies are stored in the affected areas of the spent fuel pool. The number of assemblies damaged for this case is expected to be much greater because the Oconee assemblies protrude above the tops of the pool storage racks. Therefore, all assemblies which could be contacted upon a weir gate drop are assumed to be severely j
l damaged. Analysis shows that 78 Oconee assemblies would be contacted by the dropped gate. Using the same methods and assumptions stated above, the whole body dose is 4.1 rem. The thyroid dose is negligible. Although the number of assemblies damaged in the second case is much greater the consequences are much less severe because of the 270 day decay time for the Oconee fuel.
l CONCLUSION McGuire Nuclear Station is in full compliance to Section 2.2 of Enclosure 3.
All information requested under Section 2.2 for the Spent Fuel Pools is included in this report.
l l
1 l
l l
t I
(% Crane Drum alcrane 3
Age. inst 6 tops iit i
?
. y' n
l I
ey T
& ruck Cask - Model No NFS 4 v
I I
o 1
i in l
I m
l I
I I
I I
I I
I I
- i00*
i-1
'N i
i 1
I l.
I I
ji 1
l I l
I l I
i i
i i, l
,! l-_
_ _.l,
l 1
I i.
i i.
___._a v
i I
l C as k Pit Fuel Fool p7 -
I 4'- G s-G 5'- O v
CASK DROP EVALUATION mt roan McGUIRE NUCLEAR STATION Figure 9 1.2-1 A (1 of 3)
Revision 38
- =. - -
1
e NTruck Cask - Model No NFS-4 r--
-i l
I I
I g__..___.J l
I I
I I
I l_4 l_
l l
1 1
I I
l I
I I
m I4 I
I I
i i
l l
1 I
i l
I l
n i
i i
i i
i 9
l l
g g _.,..___q l
I l_ _ _1.._ _ _ j f
,5 Cask Pa
~-
-~
Fuel Pool 6
I
, Q' o 4'-G i
4'- ro
_.._5__0_..,
i I
CASK DROP EVALUATION 8
McGUIRE NUCLEAR STATION I
Figure 9 1.2-1A (2 of 3)
Revision 38
- i
I I
i i
I I
8 I
'[-Truck Cmk - Model No. NFS-4 I
I i
m I
l I
l I
I l
l l1 Wafer Jacket Gyp.)
i i
en i
v 1
I I
I I
l 1
I I
i I
i I
l I
i
\\
I g
/,s' s'
l l
/
I S/
'./
($
'/
/n
..~-
.z.
A
/
Fuel Pool Cask Pi+
O To 90'
==
=
s s
\\
\\
\\
\\
N N
's
\\.A s
N N
\\
9 rnaxg/
g g
l N
s f4
/
_1
' s -..
'h e
n q
s s
s N
\\
N Caek Pit q.o
-. 5.o.-
w Fuel Pool Mg
/
CASK DROP EVALUATION k
1 McGUIRE NUCLEAR STATION Figure 9.1.2-I A (3 of 3)
Revision 38
-...-...w..
- .= -
51 o
_ _ ___ __ _ _ _ _f, E d r eme of Man bk l
I i
e I
D A
l 6I e
(
)m I
.v I
o
-r mr' r
l N
V l
.9 i
I i
T I
i I
e s
a, C
V u
e o
e i
"0 u
+
0 g'
3 pI i
I
,o e
Cask Pit l
P S
I 2'- 0 g-0 Fuel Pool i
4 q'l-o.__.j' l
=
-~
8 r
e t-u
,'O l
l o
O d
l l'
g C
.I IS a as N
l l
L k
Jd N
o 3e
/
j i
o.
uJ 5
I QN:
r
\\
l i
Jh
_\\
w w
l l
7 r
r()
I i
ip I
h i
t
,_A I
i i
4q r
CASK DROP EVALUATION w' \\ McGUIRE NUCLEAR STATION i
s Figure 9.1.2-1B Revision 38
(Page I of 2)
Table 15.5-5 Calculated Offsite Doses for Design Basis Accidents conservative Es timates 2-hr Dose at 2500 ft.
30 day Dose at Exclusion Radius 29000 ft.
(REN)
Low Population Zone (REM)
Accident Whole Body Thyroid Whole Body Thyroid S team Generator I
Tube Rupture 2.8 x 10'I 4.1 2.5 x 10-2 4.2 x 10
-l Full Load Rejection Main Steam Release 2.4 x 10-3 1.4 x 30-1 g,5 x 30-4 8.0 x 10-2 Waste Gas Decay Tank Rupture 0.5
-2 4.4 x 10 Liquid S torage 1
Tank Rupture 2.0 4.9 1.8 x 10 4.4 x 10'I Rupture of Major
~3
~I Steam Line 2.5 x 10 3.2 x 10 8.7 x 10' 9.2 x 10-2 Design Basis Loss of Coolant llo ECCS Leakage 2.9 1.6 x 10+2 6.1 x 10
10*3 E
With ECCS Leakage 3.0 2.' O x id *2 6.2 x 10~
5.7 x
3i0'i8 6.5 x 10*I Fuel Handling Accident in 1.1 5.1 x 10*I The Fuel Building - Fuel 9.6 x 10' 4.6 Assembly Drop
-2 Rod Ejection Accident 5.1 x 10 7.3
-2 1.0 x 10 2.4
Table 15.5-5 (Continued)
(Page 2 of 2)
Calculated Offsite Doses for Design Basis Accidents Conservative Estimates i
2-Hr Dose at 2500 ft.
30 day Dose at Exclusion Radius 29000 ft.
(REH)
Low Population Zone (REH)
Accident Whole Body Thyroid Whole Body Thyroid I
Tornado Missile impact 7.5 x 10 2.7 x10+2
-I i
on Spent Fuel Pool 1
q20.19 Lower Containment Pressure 2.3 x 10 2.9 2.1 x 10
~3
~
Relief 2.6 x 10' LOCA-Dose Additions Fuel Handling Accident 1.1 5.1 x 10+1 9.6 x 10 4.6
-2 Inside Containment Fuel Handling Accident in the Fuel Building -
Weir Gate Drop if case 1 3.5 2.0 x 10+2 Case 2
-2 3.5 x 10 15.5-5 Revision 40 Entire Page Revised
-)
3
Table 15.5-11 (Page 1 of 2)
Parameters Used to Evaluate Tornado Missile impact On Spent Fuel METEOROLOGY Atmospheric dilution for tornado conditions.
See Table 2.3.4-2 13 SPENT FUEL RADIOACTIVITY INVENTORY BASES Fuel Assembly inventory:
See Table 15.5-3 O
Conservative case maximum assembly inventory 1.65 Peaking factor applied to 1 assembly (a)
Peaking factor applied to the remainder of 1.30 the spent fuel assemblies in the fuel pool 7 days Decay Period Gas Gap Fractions:
0.3 for Kr 85 0.1 for other Noble Gases and lodines 13 RADIOACTIVITY RELEASE BASES See Subdivision 9.1.2 Humber of Fuel Assemblies Damaged
. Release Quantity The entire gap radioactivity inventory contained in each of the damaged assemblies l
Spent Fuel Pool Water lodine Removal 100 (b)
The pool lodine decontamination factor is
. Ventilation System Charcoal Filter lodine Removal Hone DOSE BASES 6,
3.47 x 10 m'/sec (b)
Receptor Breathing Rate O
Revision 40
~
3 Table 15.5-11 (continued)
(Page 2 of 2)
Parameters Used to Evaluate Tornado Missile impact on Spent Fuel NOTES (a) Peaking Factors 1.65 is from Regulatory Guide 1.25 1 30 is an assumed value which is higher than that anticipated from normal operation power densities (see Figures 4.3.2-6 through 4.3.2-11.
(b) Gas Gap Fractions, Spent Fuel Pool lodine DF and Dose Receptor Breathing Rate are taken from Regulatory Guide 1.25.
b, I
l l
l l
i O
Revision 13 New Page
s J
Table 15.5-1 (Page 3 of 7)
Assumptions for Accident Release Calculations CONSERVATIVE REALISTIC
- 4) lodine parti tion factors is 0.l.
- 4) Same 40 E.
FUEL HANDLING ACCIDENT I) 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> decay prior to hand-1) 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> decay prior to ling is assun.ed.
handling is assumed.
- 2) Maximum fuel rod pressurization
- 2) Same is I200 psig.
- 3) Maximum water depth between fuel 3)
Same rod and fuel pool surface is 23 feet.
- 4) All gap activity in the damaged
- 4) All gap activity in an outside I
rods is released and consists of:
row of fuel pins is released, a) 10 percent of all noble gases Assembly activities are listed g
and iodines except Kr85 in Table 15.5-3 Gas gap b) 30 percent of Kr85 fractions appear in ER Table 7.1.1-3 Assembly activity appears in y
Table 15.5-3
- 5) Same 5)
Full power operation is assumed 6)
Same prior to shutdown.
~
6) lodine gap inventory is 99.75 percent inorganic and 0.25 organic.
9evis ion f:n
Table 15.5-1 (Poge 4 of 7)
Assumptions for Accident Release Calculations CONSERVATIVE REALISTIC 7)
Pool decontamination factor 7)
Pool decontamination is 133 for inorganic iodine factor of 500 is assumed and I for organic iodine. All for iodine.
noble gases released from the fuel escape from the pool.
- 8) All radioactive material that 8)
Same escapes from the pool is re-i leased from the building over l
a two hour period.
9)
Charcoal filter removal effi-
- 9) Charcoal filter removal effi-ciency is 90 percent for in-ciency is 99 percent for all 4
organic lodines and 70 percent iodines.
l for organic lodines.
t f
F.
MAJOR REACTOR COOLANT SYSTEM
- 1) Twenty five percent of the full
- 1) 'Two percent of the full power
[
]
PIPE RUPTURE power equilibrium iodine in the equilibrium iodine in the core core is imediately available is avaflable for leakage to the i
for leakage to the Containment.
Containment.
Four percent of this is organic.
2)
One hundred percent of the full
- 2) Two percent of the full power y
power equilibrium noble gas in equilibrium noble gases in the the core is immediately avail-core is available for leakage j
able for leakage to the Containment. to the Containment.
l yl
- 3) The leak rate from Containment
- 3) The leak rate from Containment l to annulus is 0.2 percent per to the annulus is 0.05 percent day for the first day and 0.1 per day for the first day and percent per day thereaf ter.
0.025 percent per day there-after.
Revision 4 s
5 1
1 i -
i 3
i i
l t
l l
4 i
1 l
i i
5 DUKE POWER COMPANY MCGUIRE NUCLEAR STATION i
AUXILIARY BUILDINGS i
I i
l I
l l
-4
+
Introduction The information presented in this report is the result of a detailed evaluation of load handling systems as requested by the NRC in their letter dated December 22, 1980 concerning NUREG 0612, "The Control of Heavy Loads at Nuclear Power Plants".
Scope This report addresses specific requirements set forth in Section 2.4 of to the NRC's letter as they pertain to the Auxiliary Buildings at McGuire Nuclear Station.
Crane / Load Combinations Considered The crane / load combinations considered in this review are listed in Table 11 of our previous report to the NRC titled "McGuire Nuclear Station, Auxiliary Building, Spent Fuel Pool Area, Control of Heavy Loads, (NUREG 0612)".
Comprehensive Hazard Evaluation A comprehensive hazard evaluation was perfonned on the crane / load combinations referenced above as requested in Section 2.4-2 of Enclosure 3.
The results of this evaluation are found in the " Load / Impact Area Matrix, Auxiliary Building" table and its attachment which is included in this report.
Impact Areas & Zones The " Approximate Uppermost Impact Area" given in the tables represent the load drop areas for the various cranes and hoists as shown on marked prints attached to Duke Power's previous submittals to the NRC. The range of elevations given in the tables under " Elevation of Equipment", depict load drop zones defined as a range of elevations in the lead drop areas which a load drop from a crane would affect.
If no range of elevations are given, then the elevation given symbolizes a load drop zone between it and the maximum height a load is lifted or between it and the next highest elevation given Results All vital systems and components were reviewed to determine the effects of l
The a load drop assumed to occur anywhere in the load drop areas and zones.
results of this review are noted in the Hazard Elimination Category column of the attached tables.
Conclusion l
After careful evaluation of all possible load / target combinations, it has been concluded that heavy load handling operations in the Auxiliary Buildings will have no effects on vital systems.
- g 5
!i I
LOAD / IMPACT AREA MATRIX
[
AUXILIARY BUILDING i.
l' Crane:
Diesel Generator Access Bridge Crane - A102 I
l Capacity: 2 Ton General Arrangement Drawing No:
MC 1203-2-A a
Fl Approximate Uppermost Impact Area: BBa, ~ 43 - El. 754 + 0 (Bottom of Beam El. )
l}
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMEtlT HAZARD ELIMIt!ATI0fl CATEGORY k
Misc. Diesel Generator Diesel Generator 736 + 6 (1)
Parts - < 4000 lbs.
il I
.I e
l Ik
?
I I
I s
I l
- Equipment required for plant safe-shutdown and/or deccy heat removal
i iip li 1.
LOAD / IMPACT AREA MATRIX r
AUXILIARY BUILDING
'[
Crane:
Diesel Generator Access Bridge Crane - A103 L
Capacity: 2 Ton l
General Arrangement Drawing No:
MC 1203-2-A j
l Approximate Uppermost Impact Area:
BBa, 43 - El. 754 + 0 (Bottom of Beam El. )
i
{
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMEt1T HAZARD ELIMINATI0!l CATEGORY If Misc. Die,sel Generator Diesel Generator 736 + 6 (1)
Parts -
<, 4000 l bs.
l li i
i d
la fi 1
i i
- Equipment required for plant safe-shutdown and/or deccy heat removal
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING
[
Crane:
Diesel Generator Access Bridge Crane - A104 l'
Capacity: 2 Ton General Arrangement Drawing No:
MC 1203-4-A 11 I
Approximate Uppermost Impact Area:
BBa, 70 - El. 754 + 0 (Bottom of Beam El. )
i
'l LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY
.g Misc. Diesel Generator Diesel Generator 736 + 6 (1)
- Parts - < 4000 lbs.
i; Il il li i!
I' l
!3 li
't i
i I
j o Equipment required for plant safe-shutdown and/or decry heat removal
t LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Ih Crane:
Diesel Generator Access Bridge Crane - A105 l
Capacity: 2 Ton y
General Arrangement Drawing No:
HC 1203-4-A
\\
8 Approximate Uppermost Impact Area:
BBa, 70 - El. 754 + 0 (Bottom of Beam El. )
I N
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY U
t' j Misc. Diesel Generator Diesel Generator
'736 + 6 (1) i Parts - % 4000 lbs.
,i-1 l
t i
i J
E 1
l i
- Equipment required for plant safe-shutdown and/or decry heat removal g
9' e
t LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Dog House Misc. Valves & Piping H;norail - Al24 Capacity: 2 Ton General Arrangement Drawing No:
MC 1041-18
- Approximate Uppermost Impact Area:
FF, 60 - El. 803' + 2i" (Bottom o f Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY i
Misc. Valves & Piping - < 4000 lbs.
Mech./ Nuclear Equip.
803 + 2i to 750 + 0
- 1) SM System to Steam (3) & (4)
Generator 2B & 2C 2)
CA System to Steam (3) & (4)
Generator 2B Elec. Equip.
803 + 2 to 750 + 0 (4)c Mech./ Nuclear &
4750 + 0 (4)b Elec. Equip.
1 i
l 0 Equipment required for plant safe-shutdown and/or decry heat removal i
I 4
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDIf1G Crane:
Dog House Misc. Valves & Piping Monorail - Al22 Capacity:
2 Ton General Arrangement Drawing No:
MC 1041-18
' Approximate Uppermost Impact Area:
FF, 69 - El. 803' + 4" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMEt1T ELEVATI0ft 0F EQUIPMEt1T
' HAZARD ELIMINATI0ft CATEGORY Misc. Valves & Piping - < 4000 lbs.
Mech./ Nuclear Equi p.
803 + 4 to 750 + 0 I)
CA System to 2A (3) & (4)
SM System to (3) & (4)
Steam Generator 2A & 2D Elec. Equ i p.
803 + 4 to 750 + 0 (4)c Mech./ Nuclear &
(750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or deczy heat removal
I LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Oog House Misc. valves & Pipiag Monorai1 - Al13 Capacity:
2 Ton
'I General Arrangement Drawing rio:
Mc 1041-6 & Mc 1041-11.4 Approximate Uppermost Impact Area:
FF, 44 - El. 803' + 4" (Bottom o f Beam El. )
L :-
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mi sc. Valven Piping - <i+000 lbs.
Mech./ Nuclear Equip 803 + 4 to 750 + 0 l)
SM System to (3) & (4)
Steam Generator ID Elec. Equip.
80'3 + 4 to 750 + 0 (4)c Mech./ Nuclear 4 750 + 0 (4)b
& Elec. Equip.
I o Equipment required for plant safe-shutdown and/or decry heat removal i
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Dog House Misc. Valves & Piping Monorail - All5 Crane:
Capacity:
2 Ton General Arrangement Drawing No:
MC 1041-6 Approximate Uppermost Impact Area: pp, 52 - El. 803' + 23" (Bot tom o f Beam El. )
SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY LOADS Mech./ Nuclear Equip.
803 + 4 to 750 + 0 (3) & (4)
Misc. Valves & Piping ' < 4000 lbs.
I)
SM System to Steam Generator ID 803 + 4 to 750 + 0 (4)c Elec. Equip.
(*)b Mech./ Nuclear
< 750 + 0
& Elec. Equip.
i i
o Equipment required for plant safe-shutdown and/or decey heat removal l
i.___.
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDIflG Crane:
Main Steam isolation valve Monorail - Al27 Capacity:7i Ton General Arrangement Drawing No:
MC 1041-18
- Approximate Uppermost Impact Area:
op, 59 - El. 817' + 0" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION-CATEGORY Main Steam Isolation Mech./Naclear Equip.
817 + 0 to 750 + 0 (4)d Valva Operating
- 1) SM System to Steam Mschanism - 6220 lbs.
Generator 2B
- 2) CA System to Steam (4)d Generator 2C Elec. Equip 817 + 0 to 750 + 0 (4)c Mech / Nuclear r,
< 750 + 0 (4)b Elec. Equip.
i
- Equipment required for plant safe-shutdown and/or deccy heat removal 4
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDlHG Crane:
Dog House Misc. valves & Piping Monorail - A123 Capacity: 2 Ton General Arrangement Drawing No:
MC 1041-18 Approximate Uppermost Impact Area:
FF, 59 - El. 814' + 0" (Bot tom o f Scam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Misc. Valves & Piping -< 4000 lbs.
Mech./ Nuclear Equip.
817 + 0 to 750 + 0 (4)d
- 1) SH System to Steam Generator 2B
- 2) CA System to Steam (4)d Generator 2C Elec. Equip.
817 + 0 to 750 + o (4)c Mech / Nuclear &
< 750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or decey heat removal e
i
1 LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation Valve Monorail - All6 Capacity: 7 Ton General Arrangement Drawing No:
MC 1041-6 & MC 1041-11.4 Approximate Uppermost Impact Area:
DD,44-El. 817' + 0" (Bot tom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Main Steam isolation Mech./ Nuclear Equip:
Valva Operating
- 1) CA & SH Systems to 817 + 0 to 750 + 0 (4)d M:chani sm - 6220 lbs.
Steam Generator ID Elec. Equip.
817 + 0 to 750 + 0 (4)c Mech./ Nuclear &
<4750 + 0 (4)b Elec. Equip.
i
- Equipment required for plant safe-shutdown and/or decey heat removal Li
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation Valve Monorail - A119 Capacity: 7i Ton General Arraagement Drawing No:
MC 1041-6 Approximate Uppermost Impact Area:
E E, 5 2-El. 817 ' + 0" (Bottom of Beam El.)
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMErlT HAZARD ELIMINATION CATEGORY Ma'n Steam isolation Mech./ Nuclear Equip.
Valva operating
- 1) CA & SM Systems to 817 + 0 to 750 + 0 (4)d Mrchanism - 6220 lbs.
Steam Generator ID Elec. Eq's i p.
817 + 0 to 750 + 0 (4)c Mech./ Nuclear &
q750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Hisc. Dog House Equip. Honorail - A131 Capacity: 71 Ton General Arrangement Drawing No:
MC 1041-11.4 & MC 1040-7 Approximate Uppermost Impact Area:
DD, 43-El. 804 + 2 (Bo t tom o f Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mi sc. Dog House Mech./ Nuclear:
804 + 2 to 784 + 0 (4)d Equip. - < l5,000 lbs.
- 1) Mai n Steam L ~ ne-downstream cf isolation valve.
Elect. Equip.
804 + 2 to 784 + 0 (4)a Mech./ Nuclear &
at 784 + 0 (4)b Elect. Equip.
4
- Equipment required for plant safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Hisc. Dog House Equip. Monorai1 - Al20 Capacity:
71 Ton General Arrangement Drawing No:
MC 1040-7 Approximate Uppermost Impact Area:
DD, 53 - El. 804' + 2" (Bottom of Beam El.)
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Misc. Dog House Mech./ Nuclear:
804 + 2 to 784 + 0 (4)d Equip. - < 15,000 lbs.
- 1) Main Steam Line-downstream of isolation valve.
Elec. Equip.
804 + 2 to 784 + 0 (4)a Mech./ Nuclear T, 4784 + 0 (4)b Elec. Equip.
o Equipment required for plant safe-shutdown and/or decry heat removal I
4;
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Dog House Equip. Monorail - Al29 Capacity: 71 Ton General Arrangement Drawing No:
MC 1040-7 Approximate Uppermost Impact Area:oo, 59 - El. 804' + 2" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Misc. Dog House Mech./ Nuclear:
804 + 2 to 784 + 0 (4)d Equi p. - < 15,000 l bs.
- 1) Main Steam Line-downstream of isolation valve.
Elec. Equip.
804 + 2 to 784 + 0 (4)a Mech./ Nuclear &
<. 784 + 0 (4)b Elec. Equip.
l i
4 1
- Equipment required for plant safe-shutdown and/or decey heat removal 1
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Dog House Equip. Monorail - A132 Capacity: 71 Ton General Arrangement Drawing No:
MC 1040-7
' Approximate Uppermost Impact Area:
00, 69 - El. 804' + 2" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Misc. Dog House Mech./ Nuclear:
804 + 2 to 784 + 0 (4)d Equip. -<l5,000 lbs.
- 1) Main steam Line downstream of isolatico volve.
Elec. Equip.
804 + 2 to 784 + 0 (4)a Mech./t:ac. lear 5
< 784 + 0 (4)b Elec. Equip.
i Equipment required for plant safe-shutdown and/or decry heat removal r
a
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Dog House Misc. Valves & Piping Monorail - All2 Capacity:
2 Ton General Arrangement Drawing No:
HC 1041-6 & MC 1041-11.4
- Approximate Uppermost Impact Area:
FF, 43 - El. 803' + 4"
( Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT
^ HAZARD ELIMINATION CATEGORY Misc. Valves & Piping - < 4000 l b s.
Mech./ Nuclear Equip 803 + 4 to 750 + 0 (4)d
803 + 4 to 750 + 0 (4)c Mech./ Nuclear &
4750 + 0 (4)b Elec. Equip.
U l
- Equipment required for plant safe-shutdown and/or decey heat removal
\\
l LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation valve Honorail -All7 Capacity: 71 Ton General Arrangement Drawing No:
MC 1041-6 & MC 1041-11.4 Approximate Uppermost Impact Area:
00, 43-El. 817' + 0" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Main Steam isolation Mech./ Nuclear Equip.
803 + 4 to 750 + 0 (4)d Valve Operating l) CA,SM and SV Systems M:chanism - 6220 lbs.
Elec. Equip.
803 + 4 to 750 + 0 (4)c Hech./ Nuclear &
< 750 + 0 (4)b Elec. Equip.
t 1
- Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Dog House Equip. Jib Crane - A136 Capacity: 2 Ton General Arrangement Drawing No:
MC 1040-7
' Approximate Uppermost Impact Area:
GG,43-El. 831 +0 (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mi sc. Dog House Equip.- <4000 lbs.
Main Steam Oper. Rel.
1)
Auxiliary Bldg.
Valva - 2600 lbs.
Mech./ Nuclear Equip.
831 + 0 to 784 + 0 (4)a Elec. Equip.
831 + 0 to 784 + 0 (4)a Mech./ Nuclear 4784 + 0 (4)b l
& Elec. Equip.
2)
Dog House Mech./ Nuclear 831 + 0 to 821 + 0 (4)a
& Elec. Equip.
Mech./ Nuclear &
40821 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or deccy heat removal
LOAD / IMPACT AREA MATRIX AUXILI ARY BUILDING Crane:
Dog House Equip. Jib Crane - A137 Capacity:
2 Ton General Arrangement Drawing No:
MC 10h0-7 Approximate Uppermost Impact Area: GG, 53 - El. 831
+0 (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mi sc. Dog House Equip. - < 4000 l bs.
Main Steam Oper. Rel.
- 1) Auxiliary Bldq.
Valve - 2600 lbs.
Mech./ Nuclear 831 + 0 to 784 + 0 (4)a equip.
Elec. Equip.
831 + 0 to 784 + 0 (4)a Hech./ Nuclear &
4 784 + 0 (4)b Elec. Equip.
2)
Dog House Mech./ Nuclear &
831 + 0 to 821 + 0 (4)a Elec. Equip.
Mech./ Nuclear &
/ 821 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or deccy heat removal
+
1
1 I
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Dog House Equip. Jib Crane - A138 Capacity: 2 Ton General Arrangement Drawing No:
MC 1040-7 Approximate Uppermost Impact Area: GC, 59 - El. 831' + 0" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mi sc. Dog House Equi p. - < 4000 lbs.
Main Steam Oper. Rel.
- 1) Auxiliary Bldg.
Valve - 2600 lbs.
Mech./ Nuclear 831 + 0 to 784 + 0 (4)a Equip.
Elec. Equip.
831 + 0 to 784 + 0 (4)a Mech./ Nuclear 4 784 + 0 (4)b
& Elec. Equip.
2)
Dog House Mech./ Nuclear 831 + 0 to 821 + 0 (4)a
& Elec. Equip.
Mech./ Nuclear
< 821 + 0 (4)b
& Elec. Equip.
- Equipment required for plant safe-shutdown and/or decey heat removal
?
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Dog House Equip. Monorail - A139 Capacity: 2 Ton l
General Arrangement Drawing No:
MC 1040-7 Approximate Uppermost Impact Area:
GG, 69 - El. 831' + 0 "
(Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mi sc. Dog House Equip. -54000 lbs.
Main Steam Oper. Rel.
- 1) Auxiliary Bldg.
Valve - 2600 lbs.
Mech./ Nuclear
- 83) + 0 to 784 + 0 (4)a Equip.
Elec. Equip.
831 + 0 to 784 + 0 (4)a Mech./ Nuclear
< 784 + 0 (4)b
& Elec. Equ i p.
2)
Dog House Mech./ Nuclear 831 + 0 to 821 + 0 (4)a
& Elec. Equip.
Mech./ Nuclear 4821 + 0 (4) b
& Elec. Equip.
l
- Equipment required for plant safe-shutdown and/or dec y heat removal i
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation valve Monorail - Al26 Capacity: 7i Ton General Arrangement Drawing No:
MC 1041-18 Approximate Uppermost Impact Area:
EE, 69 - El. 817' + 0" (Bo ttom o f Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Ma~n Steam isolation Mech./ Nuclear Equip 817 + 0 to 750 + 0 Valva Operating l) SM System to Steam (4)d Mechanism - 6220 lbs.
Generator 2A
- 2) CA System to Steam (4)d Generator 2D Elec. Equip.
817 + 0 to 750 + 0 (4)c Hech./ Nuclear &
4 750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or deccy heat removal
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDitlG Crane:
Dog House Misc. Valves & Piping Honorail - Al21 l
Capacity: 2 Ton General Arrangement Drawing No:
MC 1041-18 Approximate Uppermost Impact Area:
FF, 69 - El. 803' + 4" (Bottom of Scam El. )
LOADS SAFETY-RELATED* EQUIPf1Ef1T ELEVATION OF EQUIPMEtlT HAZARD ELIMINATI0ft CATEGORY Misc. Valves & Piping - < 4000 lbs.
Mech./ Nuclear Equip.
817 + 0 to 750 + 0 l)
SM System to Steam (4)d Generator 2A 2)
CA System to Steam (4)d Generator 20 Elec. Equip.
817 + 0 to 750 + 0 (4)c I
Mech./ Nuclear &
4 750 + 0 (4)b j
Elec. Equip.
- Equipment required for plant safe-shutdown and/or decey heat removal
i t
?
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation valve Honorail - Al25 Capacity: 71 Ton General Arrangement Drawing No:
MC 1041-18 Approximate Uppermost Impact Area:
EE, 68 - El. 817' + 0" (Bottom of Deam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Main Steam isolation Mech./ Nuclear Equip.
817 + 0 to 750 + 0 Valva Operating 1)
SM System to Steam (4)d Michanism - 6220 lbs.
Generator 20.
2)
CA System to Steam (4)d Generator 2A i
Elec. Equi p.
817 + 0 to 750 + 0 (4)c Mech./ Nuclear &
( 750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or deccy heat removal i
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation Valve Monorail - Al28 Capacity: 71 Ton General Arrangement Drawing No:
MC 1041-18 Approximate Uppermost Impact Area:
00, 60 - El. 817' + 0" (Bottom o f Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Main Steam isolation Mech./ Nuclear Equip.
817 + 0 to 750 + 0 Valve Operating 1)
SM System to Steam (4)d M chanism - 6220 lbs.
Generator 2C 2)
CA System to Steam (4)d Generator 2B Elec. Equip.
817 + 0 to 750 + 0 (4)c Mech./ Nuclear &
<.750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Main Steam isolation Valve Monorail - All8 Capacity: 7i Ton General Arrangement Drawing No:
MC 1041-6 Approximate Uppermost Impact Area:
EE, 5 3 - El. 817 ' + 0" ( Bo t tom o f Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Main Steam Isolation Mech./ Nuclear Equip.
817 + 0 to 750 + 0 Valve Operating
- 1) SM System to Steam (4)d M:chanism - 6220 lbs.
Generator 18 2)
CA System to Steam (4)d Generator IC Elec. Equip.
817 + 0 to 750 + 0 (4)c Mech./ Nuclear &
< 750 + 0 (4)b Elec. Equip.
- Equipment required for plant safe-shutdown and/or decry heat removal I
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Dog House Misc. Valves & Piping Monorai1 - Al14 Capacity: 2 Ton i
General Arrangement Drawing No:
MC 1041-6 Approximate Uppermost Impact Area: FF, 53-El. 814' + 0" (Bottom of Beam El. )
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Misc. Valves & Piping - <4000 lbs.
Mech./ Nuclear Equip 814 + 0 to 750 + 0 i
}
to Steam Generator 18.
2)
CA System to Steam (4)d Generator IC Elec. Equip.
814 + 0 to 750 + 0 (4)c Mech./ Nuclear &
4750 + 0 (4)b Elec. Equip.
l l
- Equipment required for plant safe-shutdown and/or deccy heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Honorail - A095 Capacity:
5 Ton General Arrangement Drawing No:
MC 1202-5-A
' Approximate Uppermost Impact Area: AA, 52 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 9100 lbs.
Mech./ Nuclear Equip.
l Misc. Equip. - <l0,000 lbs.
733 + 0 (4)a
- 1) Steam supply to 716 + 0 at hatch opening (4)a Auxiliary Feedwater on El. 733 + 0 Pump Turbine Elec. Equip.
733 + 0 (4)a 716 + 0 at hatch opening (4)a on El. 733 + 0 Hech./ Nuclear &
ed733 + 0 not at hatch (4)b Elec. Equip.
opening.
l Equipment required for plant safe-shutdown and/or deccy heat removal v
l i
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDIflG Crane:
Hisc. Equipment Monorail - A096 Capacity: 5 Ton General Arrangement Drawing No:
MC 1202-5-A
- Approximate Uppermost Impact Area:
AA, 60 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMErlT HAZARD ELIMINATION CATEGORY Hatch Cover - 9100 lbs.
Mech./ Nuclear Equip.
Mi sc. Equi p. - < 10,000 lbs.
733 + 0 (4)a
- 1) Steam supply to 716 + 0 at hatch opening (4)a Auxiliary Feedwater on El. 733 + 0 Pump Turbine Elec. Equip.
733 + 0 (4)a 716 + 0 at hatch opening (4)a on El. 733 + 0 Mech./ Nuclear &
4 733 + 0 not at hatch (4)b Elec. Equip.
opening
- Equipment required for plant safe-shutdown and/or deccy heat removal t
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A077 Capacity:
2 Ton General Arrangement Drawing No:
Mc 1205-2-A Approximate Uppermost Impact Area:
LL, 54 - El. 767 + 0 LOADS SAFETY-RELATE 0* EQUIPMENT ELEVATION 0F EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4300 lbs.
Mech./ Nuclear Equip Misc. Equ i p. - < 4000 lbs.
El. 767 + 0 (4)a El. 750 + 0 @ ha t ch f rom (4)a floor above Elec. Equip.
El. 767 + 0 (4),
El. 750 + 0 @ hatch f rom (4)a floor above Mech./ Nuclear &
Elec. Equip.
El. 750 + 0 not @ hatch from (4)b floor above
< 750 + 0 (4)h o Equipment required for plant safe-shutdown and/or deczy heat removal t
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A079 Capacity:
3 Ton General Arrangement Drawing No:
MC 1205-2-A Approximate Uppermost Impact Area:
KK, 53 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 3800 lbs.
Mech./ Nuclear Equip Misc. Equ i p. - < 6000 l bs.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Elec. Equip.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
750 + 0 not @ hatch f rom (4)b floor above
< 750 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decry heat removal
1 0
LOAD / IMPACT AREA MATRIX AUXILIARY BUILD!flG Crane:
Misc. Equip. Monorail - A083 Capacity:
10 Ton General Arrangement Drawing No:
MC 1205-2-A
- Approximate Uppermost Impact Area:
PP, 52 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4500 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - <20,000 lbs.
767 + 0 (4)a KC and RN Systems 750 + 0 @ hatch from (4)a floor above j
Elec. Equip.
767 + 0 (4)a Train A 750 + 0 @ hatch ~from (4)a floor above Mech./ Nuclear &
Elec. Equip.
750 + 0 not @ hatch from (4)b f rom floor above
" '50 + 0 (4)b s
i i
t s.
Equipment' required for plant safe-shutdown and/or decey heat removal
,a 1
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A085 Capacity: 3 Ton General Arrangement Drawing No:
MC 1205-2-A l
Approximate Uppermost Impact Area:
-cG, 54 - El. 767 + 0 I
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hstch Cover - 3500 lbs.
Mech./ Nuclear Equip I
Misc. Equip. - < 6000 lbs.
A Train 37 + 0 (4) a
'A Train 50 + 0 (4)a i33 + 0 @ hatch from (4)a floor above Elec. Equip.
767 + 0 (4)a 750 + 0 (4)a t
Heat Exchanger 733 + 0 @ hatch from (3)
I floor above Mech./Noclear &
Elec. Equip.
733 + 0 not @ hatch.
(4)b from floor above
< 733 + 0 (4)b i
- Equipment required for plant safe-shutdown and/or deccy heat removal 9
J
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Duct Shaf t Access Honorail - A086 Capacity: 2 Ton General Arrangement Drawing No:
MC 1205-2-A
- Approximate Uppermost Impact Area:
Ja, 53 - El. 767 + 0 j'
m LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARDELIMiNATIONCATEGORY Equip. for Duct Shaf t - < 4000 lbs. Mech./ Nuclear Equip.
767 + 0 (4)a 750 + 0 (4)a Elec. Equip.
A Train 767 + 0 (1)
A Train 750 + 0 (1)
- 11 Mech./ Nuclear &
Elec. Equip.
< 750 + 0 (4)b 1
lI
- Equipment required for plarit safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Honorail - A081 Capacity:
10 Ton General Arrangement Drawing No:
i!C 1205-2-A Approximate Uppermost Impact Area:
JJ, 53 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4000 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - < 20,000 l bs.
767 + 0 (4)a 750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above 716 + 0 @ hatch from (4)a floor above Elec. Equip.
A Train-Ni Sys tem no t 767 + 0 (1) present 750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Terminal Box 150 and 716 + 0 @ hatch from (1) cables to velves INI 1158, floor above 1NI 3348, and INI 3338.
Mech./ Nuclear &
Elec. Equip.
< 750 + 0 no t @ ha t ch f rom (4)b floor above e
- Equipment required for plant safe-shutdown and/or deccy heat removal
}
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Mi sc. Equi p. Jib Crane - A149 Capacity: 2 Ton General Arrangement Drawing No:
MC 1204-2-A
- Approximate Uppermost Impact Area:
N/A i
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMEllT HAZARD ELIMINATI0rl CATEGORY NON-EXISTENT (Crane has been deleted) i i
l 1
i i
I
- Equipment required for plant safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A037 Capacity:
2 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
HH, 52 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4100 lbs.
Mech./ Nuclear J'~.p.
B B Filter & Seal injection 750 + 0 (4)a Fi l ter Equi p.
< 4000 lbs.
Seal Water Filter, 733 + 0 (1)
Seal inJ. Filter A & B, and Steam Generator Filter A&B Elec. Equip.
750 + 0 (4)a l
733 + 0 (4)a Hech./ Nuclear &
Elec. Equip.
<733 + 0 (4)b o Equipment required for plant safe-shutdown and/or decry heat removal
a LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Jib Crane - A071 Capacity: 2 Ton General Arran0ement Drawing No:
MC 1204-2-A
' Approximate Uppermost Impact Area:
KK, 55-El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hisc. Equip. - 4000 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a BB Piping 733 + 0 @ hatch friom (4)a floor above Elec. Equip.
A & B Train
- 750 + 0 (1) 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch (4)b from floor above
<733 + 0 (4)b ACable to the following valves:
INI 255B INI 258A I FW 498 kqUipke$t required for plant safe-shutdown and/or decry heat removal
+
I k
- i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Honoaril - A034 Capacity:
5 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area: JJ, 54 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 9100 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - < 10,000 lbs.
750 + 0 (4)a KC Heat Exchanger IA 733 + 0 (1)
Electrical Equip.
750 + 0 (4)a 733 + 0 (4)a Mech./ Nuclear &
Elec. Equip.
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decry heat removal t
A
'4 LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
FiIter Storage Access Monorai1 - A035 Capacity:
5 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area: MM, 53 - El. 750 + 0 LOADS SAFETY-RElATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Filter Storage -<10,000 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a KC Piping 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decey heat removal
1 LOAD / IMPACT AREA MATRIX AUXILIARY BUILDlHG Crane:
Misc. Equi p. Monorai l - A036 Capacity:
2 Ton General Arrangement Drawing No:
Mc 1204-2-A i
' Approximate Uppermost Impact Area:
KK, 52 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4000 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - < 4000 lbs.
750 + 0 (4)a NV Reactor Coolant Filter 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
<- 733 + 0 (4)b
- Equipment required for plant safe-shutdow and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorai1 - A039 Capacity: 2 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
NN, 56 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 3200 lb,.
Mech./ Nuclear Equip.
N C Evap. Fi l ter Equip. - < 4000 lbs.
750 + 0 (4)a Elec. Equip.
750 + 0 (4)a Mech./ Nuclear &
Elec. Equip.
< 750 + 0 (4)b Equipment required for plant safe-shutdown and/or decry heat removal O
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Demin. Access Monorail - A042 Capacity:
4 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
MM, 54 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATI0ft CATEGORY Hatch Cover - 6900 lbs.
Misc. Demin. Equi p. - <8000 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above' Elec. Equip.
750 + 0 (4)a 733 + 0 9 hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b l
l
- Equipment required for plant safe-shutdown and/or decey heat removal i
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Filter Access Monorail - A043 Capacity:
3 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
MM, 55 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4600 lbs.
Mech./ Nuclear Equip.
LHST Primary & Secondary 750 + 0 (4)a Fil ter Equip. - < 6000 lbs.
WM Piping 733 + 0 @ hatch from (4)a floor above i
Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
<733 + 0 (4)b l
- Equipment required for plant safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Demin. Access Monorail - A044 Capacity: 4 Ton General Arrangement Drawing No:
MC 1204-2-A 4
Approximate Uppermost Impact Area:
MM, 55 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY t
Hctch Cover - 6900 lbs.
Mech./ Nuclear Equip.
Misc. Demin. Equi p.
<8000 1bs.
750 + 0 (4)a NR Piping 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deccy heat removal T
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A050 Capacity: 3 Ton General Arrangement Drawing No:
MC 1204-2-A
' Approximate Uppermost Impact Area:
MM, 52 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4100 lbs.
Mech./ Nuclear Equip.
R2 sin Sluice Filter Equip.
<6000 lbs.
750 + 0 (4)a WS Piping 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deccy heat removal
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A053 Capacity: 3 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
KK, 53 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 5700 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a NS Mixed Bed Demineralizer 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above 4 733 + 0 (4)b e
- Equipment required for plant safe-shutdown and/or deccy heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Jib Crane - A072 Capacity: 3 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
LL, 55 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPNENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 5300 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - < 6000 lbs.
750 + 0 (4)a WM Piping 733 + 0 @ hatch from (4)a floor abova Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above 4 733 + 0 (4)b o Equipment required for plant safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDIflG Crane:
Misc. Equip. Monorail - A068 Capacity: 2 Ton General Arrangement Drawing No:
MC 1204-2-A
- Approximate Uppermost Impact Area:
NN, 51-El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMEtiT HAZARD ELIMINATI0ft CATEGORY Hatch Cover - 4000 lbs..
Mech./ Nuclear Equip.
Misc. Equip. - < 4000 lbs.
750 + 0 (4)a MV Piping 733 + 0 @ hatch from (4)a floor above Elec. Equi p.
Train B 750 + 0 (1) 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch (4)b from floor above
< 733 + 0 (4)b P
- Equipment required for plant safe-shutdown and/or decty heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Jib Crane - A070 Capacity:
3 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
LL, 53 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 5100 lbs.
Mech./ Nuclear Equip.
Misc. Equip.
<6000 lbs.
750 + 0 (4)a NS Mixed Bed Demineralizer 733 + 0 @ hatch from (4)a floor above Elec. Equip.
A & B Train 750 + 0 (4)a 733 + 0 9 hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
<733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deccy heat removal
i 1,
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Honorai1 - A052 Capacity: 3 Ton General Arrangement Drawing No:
MC 1204-2-A Approximate Uppermost Impact Area:
LL, 53 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4500 lbs.
Mech./ Nuclear Equip.
Cat. Bed Demin. Equip
< 6000 lbs.
750 + 0 (4)a NS Mixed Bed Demineralizer 733 + 0 @ hatch from (4)a floor above Elec. Equip.
A & B Train 750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
- 4. 733 + 0 (4)b o Equipment required for plant safe-shutdown and/or deccy heat removal l
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Cen. Chg. Pump & Pump Motor Access Monorail - A019 Capacity: 4 Ton General Arrangement Drawing No:
MC 1202-2-A Approximate Uppermost Impact Area:
HH, 55 -
.El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVAT10ft 0F EQUIPMENT HAZARD ELIMINATI0fl CATEGORY Hatch Cover - 6300 lbs.
Mech./ Nuclear Equip.
Cen. Chg. Pump - 7500 lbs.
733 + 0 (4)
Cen. Chg. Pump Motor - 4710 lbs.
NV & RN Systems 716 + 0 @ hatch from (1) & (2)*
floor above Elec. Equip.
B Train 733 + 0
( 1 ) **
A Train 716 + 0 @ hatch from
( 1 ) **
floor above Mech./ Nuclear &
" Hethod for Shutdown:
Elec. Eyd s.
716 + 0 not @ hatch from (4)b SSF for Seal inj., NI floor above Pumps for charging.
(716 + 0 (4)b
"'- SSF & Train B cables have adequate separation.
~
- Equipment required for plant safe-shutdown and/or deccy heat removal m
i 1.
LOAD / IMPACT AREA MATRIX, AUXILIARY BUILD!ttG l
j Crane:
Safety inj. Pump & Pump Motor Access Honorai1 - A027 Capacity: 2i Ton l
General Arrangement Drawing flo:
HC 1202-2-A Approximate Uppermost Impact Area:
HH, 53 - El. 733 + 0 il' LOADS SAFETY-RELATED* EQUIPMErlT ELEVATI0tl 0F EQUIPMErlT HAZARD ELIMIrlATI0tl CATEGORY l
Hatch Cover - 2300 lbs.
Mech./ Nuclear Equip.
' j Safety inJ. Pump - 5260 lbs.
733 + 0 (4)a Safety inj. Pump Motor - 3900 lbs.
NI System 716, + 0 @ hatch f rom (4)e floor above Elec. Equip.
733 + 0 (4)a f
Train A Pump Motor 716 + 0 @ hatch from (1)
I floor above a
j Mech./ Nuclear &
l.
Elec. Equip.
716 + 0 no t @ hatch f rom (4)b floor above
< 716 + 0 (4)b l
I 1
l 1
I l
,1 l
l s
i i
1 l
I l
t
- l
- Equipment required for plant safe-shutdown and/or deczy heat removal l
i l
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Recp. Chg. Pump, Pump Hotor, and Fluid Drive Access Honorail - A017 Capacity: 6 Ton General Arrangement Drawing No:
HC 1202-2-A Approximate Uppermost Impact Area: JJ, 54 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Ricp. Chg. Pump - 11,200 lbs.
Mech./ Nuclear Equip.
R:cp. Chg. Pump Motor - 1250 lbs.
733 + 0 (4)a Fluid Drive - 2090 lbs.
NV & FW Piping 716 + 0 @ hatch from (1) & (2)*
floor above Elec. Equip.
733 + 0 (4)a 716 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
7I6 + 0 not @ hatch (4)b from floor above
< 716 + 0 (4)b
- Nethod for Shutdown:
l SSF for Seal Inj. and NI Pumps for charging.
l I
- Equipment required for plant safe-shutdown and/or decry heat removal
i LOAD / IMPACT ARFA MATRIX AUXILIARY BUILDitlG Crane:
Hisc. Equip. Honorail - A031 l
1 Capacity: 5 Ton I
General Arrangement Drawing flo:
HC 1202-2-A 8
Approximate Uppermost Impact Area:
JJ, 54 - El. 733 + 0 i
A I
[
LOADS SAFETY-RELATED* EQUIPMENT ELEVATI0tl 0F EQUIPMEtlT HAZARD ELIMIflATI0tl CATEGORY 00blbs.
733 + 0
'(4)a sc E p.-<
NV & FW Piping 716, + 0 @ hatch from (1) & (2)Y',
floor above Elec. Equip.
733 + 0 (4)a 716 + 0 @ hatch f rom (4)a floor above Hech./ Nuclear &
e Elec. Equip.
716 + 0 not @ hatch from (4)b 8
floor above
?.
fl
< 716 + 0 (4)b R
R
?
I
- Hethod for Shutdown:
l SSF for Seal inj. and N1 Pumps for charging.
I I
- Equipment required for plant safe-shutdown and/or deccy heat removal
.i i
i.
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Safety inj. Pt'mp & Pump Motor Access Monorail - A024 Capacity:
21 Ton l
General Arrangement Drawing No:
MC 1202-2-A Approximate Uppermost Impact Area: GG, 53 - El. 733 + 0 E
i LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY E
Hatch Cover - 2300 lbs.
Mech./ Nuclear Equip.
f Sa fe ty i nj. Pump - 5260 l bs.
733 + 0 (4)a Safety i nj. Pump Motor - 3900 lbs.
Ni Pump 18 and RN
. 716 + 0 @ hatch from (3)
Piping to Motor Cooler floor above Elec. Equip.
733 + 0 (4)a NI Pump Motor 18 716 + 0 @ hatch from (3) s floor above 3
f Mech./ Nuclear and
[
Elec. Equip.
716 + 0 not @ hatch from (4)b floor above
< 716 + 0 (4)b 1
i i
?
t l
- Equipment required for plant safe-shutdown and/or deccy heat removal e
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Cen. Chg. Pump & Pump Hotor Access Honorail - A020 Capacity:
4 Ton General Arrangement Drawing No:
MC 1202-2-A Approximate Uppermost Impact Area:
Ha, 55 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 6300 lbs.
Mech./ Nuclear Equip.
Cen. Chg. Pump - 7500 lbs.
733 + 0 (4)a Can. Chg. Pump Hotor - 4710 lbs.
NV Charging Pump 716 + 0 @ hatch from (1) floor above Elec. Equip.
733 + 0 (4) a B Train 716 + 0 @ hatch from (1) floor Mech./ Nuclear &
Elec. Equip.
716 + 0 not @ hatch from (4)b ficor above
< 716 + 0 (4)b l
t
- Equipment required for plant safe-shutdown and/or decty heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDIflG l
Crane:
N D Pump Access Honorail - A005A, A005B, A005C Capacity: 5 Ton i
l General Arrangement Drawing No:
MC 1201-2-A
[
Approximate Uppermost Impact Area:
GG, 54 - El. 716 + 0
- t LOADS SAFETY-RELATED* EQUIPMENT ELEVATI0tl 0F EQUIPMENT HAZARD ELIMIflATI0t! CATEGORY Hatch cover - 9100 lbs.
Mech./ Nuclear Equip.
t N D Pump.- 9500 lbs.
716 + 0 (4) a l
KC, ND, RN Systems 695 + 0 @ hatch from (1) & (3)
Train A & B and non-floor above essential headers Elec. Equip.
e I
A & B Train 716 + 0 (1) & (3)f f
A & B Train 695 + 0 @ hatch from (1) & (3)^
2 floor above Mech./ Nuclear &
Elec. Equi p.
695 + 0 not @ hatch from (4)b floor above h
i g' *0ue to si te speci fic considerations, system separation is maintained.
4 j o Equipment required for plant safe-shutdown and/or deccy heat removal
t!;
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING
(
Crane:
Misc. Equ i p. Mono rai l - A010 I;
I Capacity: 4 Ton 1j General Arrangement Drawing No:
HC 1201-2-A i
jf.
Approximate Uppermost Impact Area:
GG, 55 - El. 716 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY
- Hatch Cover - 7200 lbs.
Mech./Nucl ear I Mi sc. Equi p. - < 8000 lbs.
716 + 0 (4)a RN Train 1% Air 695 + 0 @ hatch from (3)
,j Handling Unit floor above Elec. Equip A Train 716 + 0 (1)
Ai r Handling Uni t 695 + 0 @ hatch from (3) h Mo to rs floor above ll j-Mech./ Nuclear &
p Elec. Equi p 695 + 0 not @ hatch from (4)b floor above i
1 lI l
1
)l i
3 t
l
- Equipment required for plant safe-shutdown and/or deccy heat removal i
i 1
N ti LOAD / IMPACT AREA MATRIX AUXILIARY BUILDIrlG l
j Crane:
RHR & Sump Pump Access Monorail - A002A & A002B Capacity: 5 Ton General Arrangement Drawing flo:
MC 1201-2-A 8
Approximate Uppermost Impact Area:
GG, 55 - El. 716 + 0 i.
I l.0A05 SAFETY-RELATE 0* EQUIPMENT ELEVATI0fl 0F EQUIPMErlT HAZARD ELIMINATI0tl CATEGORY t
}HatchCover-7200lbs.
Mech./ Nuclear l N O Pusap - 2050 lbs.
71.6 + 0 (4)a
[ N D Pump Motor - 8350 lbs.
RN Train IA Air 695 + 0 @ hatch from (3) e Handiing Unit floor above j
j
~ - - '
Elec. E' quip. '. ' -
8 r'
I3 A Traint
-(
716 + 0 (1)
(/(
Ai r thindling Uni t i
695 + 0 9 hatch from (3)
Motors!
- i floor above
/ ', 4,'
s s'
s t
Mech.?Nucl ehr' &'
Elec.[Iqui)'
~
695 + 0 not @ hatch from (4)b
/
e
/,
floor above t
[,,
f.
~
t a
/*
?,
f i
3 4
1 l lj t
- r
\\
(, '
f
^C',..
j i f
a l
c c.
/
. e
, s 't l
n p
l
- Equ// ment h uired fo,r plant safe-shutdosn and/or deccy heat' r'emoval -
w ar-
,g
+.
+
y s
o fj p
+.
4[
j */
r-
~
4 r-d '
2_
/
.x z.m
C
/ ',
r e
}
i g.
y}
s f
{ j' --
,f A
' ^ '
s
~
f
~
LOAD /IMTAN AREA'HAIRIX s'
Adii_l ARY BU!ZDfrG ' l c:
'/
e j
Crane:
N 3 Pump Accasn Monorail
' /'006A, A0068 t.
Capacity: 5 Ton j
General Arrangement Drawing No:
MC 1201-2-A
. lj i
l:
Approximate Uppermost Impact Area:
GG, 55 - El. 716 + 0 i
LOADS SAFETY-RELATED* EQUIPMErli ELEVATION OF EQUIPf4ErlT HAZARD ELIMIflATI0ft CATEGORY l'if Httch Cover - 7200 lbs.
Mech./ Nuclear Equip.
l l N S Pump - 2470 lbs.
716 + 0 (4)a N S Pump Motor - 7500 lbs.
Containment Spray 695- + 0 @ hatch f rom (3)
Pump 18 and RN floor above l
supply to Air Handling Unit t
i Elec. Equip.
716 + 0 (4)a l
Containment Spray 695 + 0 @ hatch from (3) l Pump 1 B Motor floor above 9
Mech./ Nuclear &
Electrical Equip.
695 + 0 not @ hatch from (4)b j
floor above l
t
- i
- 1 a
I
',i gj
- Equipment required for plant safe-shutdown and/or decry heat removal
I i
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A076 Capacity: 2 Ton General Arrangement Drawing No:
MC 1205-3-A
' Approximate Uppermost Impact Area:
LL, 58 - El. 767 + 0 LOADS SAFETY-RELATE 0* EQUIPMENT ELEVATION OF EQUIPMEllT HAZARD ELIMINATI0ft CATEGORY Hitch Cover - 4300 lbs.
Mech./ Nuclear Equip.
Mi sc. Equip. - < 4000 lbs.
767 + 0 (4)a NR System 750 + 0 @ hatch from (4)a floor above Elec. Equip.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
750 + 0 not @ hatch from (4)b floor above (750 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decey heat removal
?
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A078 Capacity:
3 Ton General Arrangement Drawing No:
MC 1205-3-A
' Approxima te Uppermost Impact Area:
gg, 59 - El. 767 & 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 3800 lbs.
Mech / Nuclear Equip.
Misc. Equip.
< 6000 lbs.
767 + 0 (4)a Letdown Heat Exchanger, 750 + 0 @ hatch from (4)a KC & HV Piping floor above Elec. Equip.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
750 + 0 not @ hatch from (4)b floor above
< 750 + 0 (4)b o Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equi p. Monorai l - A080 Capacity: 10 Ton General Arrangement Drawing No:
MC 1205-3-A
' Approximate Uppermost Impact Area:
PP, 60 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4500 lbs.
Mech./ Nuclear Equip.
Mi sc. Equi p. - < 20,000 lbs.
767 + 0 (4)a KF Heat Exchanger, 750 + 0 @ hatch from (4)a Kf and KC Piping floor above Elec. Equi p.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
El ec. Equip.
750 + 0 not @ hatch from (4)b floor above
< 750 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Equip. Access tbnorail - A082 Capacity:
10 Ton General Arrangement Drawing No:
MC 1205-2-A & MC 1203-3-A Approximate Uppermost Impact Area: LL, 56 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Misc. Equip. - t20,000 lbs.
Mech./ Nuclear Equip.
767 + 0 (4)a Cooling Water Supply to 750 + 0 @ hatch f rom (1)
RHR Heat Exchanger floor above 2A,ND System Elec. Equip.
767 + 0 (4)a KC,FW,NI Systems, 750 + 0 9 hatch from (1)
Train B floor above Mech./ Nuclear &
Elec. Equip.
750 + 0 no t @ hatch f rom (4)b floor above
< 750 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deccy heat removal f
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Mi sc. Equip. Honorai l - A084 Capacity: 10 Ton General Arrangement Drawing No:
Mc 1205-3-A
' Approximate Uppermost Impact Area:
JJ, 58 - El. 767 + 0 i
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY
' Hatch Cover - 4500 lbs.
Mech./ Nuclear Equip.
Misc. Equip. -s20,000 lbs.
767 + 0 (4)a RN to KC Heat Exchanger 2B 750 + 0 (1)
Seal Water i nJ. Fi l ter Li nes 733 + 0 @ hatch from (4)a floor above Ni Piping 716 + 0 (4)a Elec. Equip.
Train A 767 + 0 (1) 750 + 0 (4) 733 + 0 @ ha tch f rom (4) floor above Train B 716 + 0 @ hatch from (1) floor above Mech./ Nuclear &
El ec. Equip.
< 750 + 0 not @ hatch (4)b f rom floor above
- Equipment required for plant safe-shutdown and/or decey heat removal
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING r
Crane:
Duct Shaft Access Monorail - A087 Capacity:
2 Ton General Arrangement Drawing No:
MC 1205-3-A
' Approximate Uppermost Impact Area:
JJ, 59 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Equip. for Duct Shaf t - <4000 lbs.
Mech./ Nuclear Equip.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Elec. Equip.
767 + 0 (4)a 750 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
750 + 0 not G hatch from (4)b floor above
< 750 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deccy heat removal
c 4
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorai 1 A088A & A0888 Capacity:
5 Ton General Arrangement Drawing No:
Mc 1205-3-A
' Approximate Uppermost Impact Area: MM, 56 - El. 767 i- 0 ELEV' TION OF EQUIPMENT HAZARD ELIMINATION CATEGORY LOADS SAFETY-RELATE 0* EQUIPMENT A
Hatch Cover - 8400 lbs.
Mech./ Nuclear Equip.
Misc. Equi p. - < 10,000 lbs.
767 + 0 (4)a 750 + 0 (4)a Elec. Equip.
767 + 0 (4)a B Train 750 + 0 (1)
Mech./ Nuclear &
Elec. Equip.
< 750 + 0 (4)b I
Equipment required for plant safe-shutdown and/or deczy heat removal f
i t
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equi p. Monorai l - A090 Capacity:
3 Ton General Arrangenent Drawing No:
MC 1205-3-A
' Approximate Uppermost Impact Area: cc, 58 - El. 767 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 3500 lbs.
Mech./ Nuclear Equip.
Mi sc. Equi p.
< 6000 lbs.
767 + 0 (4)a 750 + 0 (4)a Seal Water Heat Exchanger, 733 + 0 (4)a KC, RN Systems RN, A & S Train 716 + 0 @ hatch from (1) & (3)*
floor above Elec. Equip.
A Train 767 + 0 (1) 750 + 0 (4) 733 + 0 (4)
A & B Train 716 + 0 @ hatch from (1) & (3)*
floor above
't Due to si te speci fic Mech./ Nuclear &
considerations, sytem Elec. Equip.
separation is maintained.
< 716 + 0 @ hatch from (4)b floor abave
< 733 + 0 not @ hatch from (4)b floor above 1
o Equipment required for plant safe-shutdown and/or decry heat removal
I i.
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Hisc. Equip. Monorail - A033 Capacity:
5 Ton General Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area: aj, 58 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGO!;f Hatch Cover - 9100 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - s10,000 lbs.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above 716 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above 716 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
4 750 + 0 no t @ ha tch f rom (4)b floor above
< 716 + 0 @ hatch f rom (4)b floor above O Equipment required for plant safe-shutdown and/or deccy heat removal i
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Filter Access Monorail - A046 Capacity:
3 Ton General Arrangement Drawing No:
HC 12'04-3-A Approximate Uppermost Impact Area:
NN, 56 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 46000 lbs.
Mech./duclear Equip.
N B Evap. Cond. Fi I ter 750 + 0 (4)a Equip. - <6000 lbs.
733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear f, Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deccy heai. removal
b LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A049 Capacity:
2 Ton General Arrangement Drawing No:
HC 1204-3-A
' Approximate Uppermost Impact Area:
MM, 59 - El.750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4000 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Elec. Equip.
i 750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
1 Elec. Equip.
[
733 + 0 not a hatch frcm (4)b floor above
< 733 + 0 (4)b e Equipment required for plant safe-shutdown and/or deccy heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A054 Capacity:
3 Ton General Arrangement Drawing No:
MC 1204-3-A
' Approximate Uppermost Impact Area:
gg, 57 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT.
HAZARD ELIMINATION CATEGORY Hatch Cover - 5400 lbs.
Mech./ Nuclear Equip.
733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A056 Capacity:
5 Ton General Arrangement Drawing No:
MC 1204-3-A
' Approximate Uppermost Impact t.rea:
KK, 58 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 8600 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch f rom (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch f rom (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDitlG Crane:
Access Hatch Honorai1 - A057 Capacity: 2 Ton General Arrangement Drawing No:
MC 1204-3-A
' Approximate Uppermost Impact Area: MM, 60 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMEtiT ELEVATION OF EQUIPMENT HAZARD ELIMINATI0ri CATEGORY Hatch Cover - 4100 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch f rom (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above 4 733 + 0 (4)b o Equipment required for plant safe-shutdown and/or decey heat removal s
..n LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A059 Capacity:
4 Ton General Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area:
MM, 58 - El. 750 + 0 4
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 6900 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Elec. Equip.
(4)a 750 + 0 73? + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b f
l 0 Equipment required for plant safe-shutdown and/or deccy heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A060 Capacity:
4 Ton General. Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area:
MM, 57 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 6900 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch f rom (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch f rom (4)b floor above 4 733 + 0 (4)b e
- Equipnent required for plant safe-shutdown and/or decty heat removal 4
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A061 Capacity:
3 Ton General Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area: HM, 59 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 4500 lbs.
Mech./ Nuclear Equip.
733 + 0 @ hatch from (4)a floor above Elec. Equip.
733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above 4 733 + 0 (4)b o Equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A062 Capacity:
3 Ton General Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area:
KK, 60 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 5600 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
<733 + 0 (4)b
- equipment required for plant safe-shutdown and/or decey heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Honorai1 - A064 Capacity:
2 Ton General Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area: KK, 60 - El. 750 + 0 LOADS SAFETY-RELATE 0* EQUIPMENT ELEVAT10tl 0F EQUIPMEtiT llAZARD ELIMINAT10tl CATEGORY Hatch Cover - 4000 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Elec. Equ'p.
733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above 4 733 + 0 (4)b o Equipment required for plant safe-shutdown and/or deccy heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Monorail - A063 Capacity:
3 Ton General Arrangement Drawing No:
MC 1204-3-A Approximate Uppermost Impact Area:
KK, 59 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATI0tl CATEGORY Hatch Cover - 5700 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above 4 733 + 0 (4)b l
- Equipment required for plant safe-shutdown and/or deccy. heat removal s
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Jib Crane - A073 Capacity:
3 Ton i
General Arrangement. Drawing No:
MC 1204-3-A
' Approximate Uppermost Impact Area:
LL, 59 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 5100 lbs.
Mech./ Nuclear Equip.
Misc. Equi p. - < 6000 l bs.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutdown and/or deczy heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Mi sc. Fi l ter Access Monorail - A047 Capacity:
2 Ton General Arrangement Drawing No:
MC 1204-3A
- Approximate Uppermost Impact Area: KK, 57 - El. 750 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Mech./ Nuclear Equip.
Hatch Cover - 3200 lbs.
750 + 0 (4)a Misc. Fil ter Room
-733 + 0 @ hatch from (4)a Equi p. - < 4000 lbs.
floor above Elec. Equip.
A Train 750 + 0 (1) 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
~
(4)b 733 + 0 not @ hatch from floor above
< 733 + 0 (4)b t
- Equipment required for plant safe-shutdown and/or decry heat removal 9
a e
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Access Hatch Honorail - A058 Capacity:
2 Ton General Arrangement Drawing No:
HC 1204-3 r Approximate Uppermost Impact Area:
JJ, 60 - El. f as + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hstch Cover - 4100 lbs.
Mech./ Nuclear Equip.
750 + 0 (4)a NV i nj. Fil ter, Seal 733 + 0 @ hatch from (4)a Water Fil ter floor above Elec. Equip.
750 + 0 (4)a 733 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
733 + 0 not @ hatch from (4)b floor above
< 733 + 0 (4)b
- Equipment required for plant safe-shutccwn and/or deccy heat removal
1 LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Safety inj. Pump & Pump Motor Access Honorail - A025 Capacity:
2t Ton General Arrangement Drawing No:
Mc 1202-3-A Approximate Uppermost Impact Area:
cc, 58 - El. 733 + 0 I
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY fe y nj Pu p 526blbs.
733 + 0 (4)a Safety inj. Pump Motor - 3900 lbs.
Ni system 716 + 0 @ hatch from (4)e floor above f
Elec. Equip.
Train B 733 + 0 (1)
Train B 716 + 0 @ hatch from (1) floor above Mech./ Nuclear &
Elec. Equip.
716 + 0 not @ hatch from (4)b floor above
< 716 + 0 (4)b
- Equipment required for plant safe-shutdown and/or decry heat removal e
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Cen. Chg. Pump & Pump Motor Access Monorail - A021 Crane:
Capacity:
4 Ton General Arrangement Drawing No:
MC 1202-3-A Approximate Uppermost Impact Area:
HH, 57 - El. 733 + 0 SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMErlT HAZARD ELIMINATION CATEGORY LOADS Mech./ Nuclear Equip.
Hatch Coer - 6300 lbs.
733 + 0 (4)
Cen. Chg. Pump - 7500 lbs.
716 + 0 @ hatch from (1) & (2) f NV & RN Systems floor above Can. Chg. Pump Motor - 4710 lbs.
Elec. Equip.
(1)**
733 + 0 A Train
' 716 + 0 @ hatch f rom (1 ) **
A Train floor above Mech./ Nuclear &
Elec. Equip.
716 + 0 not @ hatch from (4)b
-- Method for Shutdown:
floor above SSF for Seal inj., Nt Pumps for charging.
<716 + 0 (4)b
- SSF Trai n B cables have adequate separation.
4 i
Equipment required for plant safe-shutdown and/or decry heat removal e
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Cen. Chg. Pump & Pump Motor Access Mono, rail - A022 Capacity: 4 Ton General Arrangement Drawing No:
MC 1202-3-A
- Approximate Uppermast Impact Area: HH, 59 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 6300 lbs.
Mech./ Nuclear Equip.
4 Crn. Chg. Pump. - 7500 lbs.
733 + 0 (4)
' Cen. Chg. Pump Motor - 4710 lbs.
NV & RN Systems 716 + 0 (1) & (2)v Elec. Equip.
A Train 733 + 0 (1 ) **
A Train 716 + 0 (1 ) **
Mech./ Nuclear &
Elec. Equip.
< 716 + 0 (4)b
- Method for Shutdown:
SSF for Seal i nJ., Ni Pumps for charging.
- SSF Train B cables have adequate separation.
Equipment required for plant safe-shutdown and/or decry heat removal
O LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Safety inJ. Pump & Pump Motor Access Honorail - A028 Capacity:
21 Ton General Arrangement Drawing No:
MC 1202-3-A
- Approximate Uppermost Impact Area:
un, 58 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 2300 lbs.
Mech./ Nuclear Equip.
Safety inj. Pump - 5260 lbs.
733 + 0 (4)a Safety inj. Pump Motor - 3900 lbs.
716 + 0 (3)
Elec. Equip.
A Train 733 + 0 (1)
A Train 716 + 0 (1)
Mech./ Nuclear &
Elec. Equip.
< 716 + 0 (4)b u
- Equipment required for plant safe-shutdown and/or deccy heat removal
a I
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A023 Capacity:
5 Ton General Arrangement Drawing No:
MC 1202-3-A Approximate Uppermost Impact Area:
FF, 57 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 9000 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - 510,000 lbs.
733 + 0 (4)a 716 + 0 North of Column (4)a Line FF NS Pump IA 695 + 0 @ hatch from (1) floor above El ec. Equip.
Train B 733 + 0 (1)
Train A & B 716 + 0 North of Column (1)
Line FF Train A 695 + 0 @ hatch from (1) floor above Mech./ Nuclear &
Elec. Equip.
716 + 0 South of Column
_(4)b Line FF 695 + 0 not @ hatch from (4)b floor above
- Equipment required for plant safe-shutdown and/or decry heat removal
.s-
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Mi sc. Equip. Nonorail - A026 Capacity:
3 Ton General Arrangement Drawing No:
MC 1202-3-A
]
Approximate Uppermost Impact Area: nn, 56 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMEllT HAZARD ELIMINATION CATEGORY
)
__ 1
, Hatch Cover - 4000 lbs.
Mech./ Nuclear Equip.
733 + 0 (4)a
! Mi sc. Equip. - < 6000 lbs.
716 + 0 (4)a Elec. Equip.
733 + 0 (4)a Train A 716 + 0 (I)
I 1
\\
l l
l i
- Equipment required for plant safe-shutdown and/or decry heat removal l
k
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Monorail - A032 Capacity:
5 Ton General Arrangement Drawing No:
MC 1202-3-A Approximate Uppermost Impact Area:
JJ, 58 - El. 733 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMEtlT HAZARD ELIMINATION CATEGORY Hatch Cover - 8400 lbs.
Mech./ Nuclear Equip.
733 + 0 (4)a Misc. Equip. - <10,000 lbs.
NV & FW Piping 716 + 0 @ hatch from (1) & (2)*
floor above
)
l Elec. Equip.
A Train 733 + 0 (1)
A Train 716 + 0 @ hatch from (1)
I floor above Mech./ Nuclear &
Elec. Equip.
716 + 0 not @ hatch from (4)b floor above
" M2thod for Shutdown:
SSF for Seal inj. and Ni pumps for charging.
- Equipment required for plant safe-shutdown and/or decry heat removal
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Recp. Chg. Pump, Pump Motor, and Fluid Drive Access Honorail - A018 Capacity: 6 Ton General Arrangement Drawing No:
MC 1202-3-A Approximate Uppermost Impact Area: JJ, 58 - El. 733 + 0 I
LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY l
R::cp. Chg. Pump -11,200 lbs.
Mech./ Nuclear Equip.
R2cp. Chg. Pump Motor - 1250 lbs.
733 + 0 (4)a Fluid Drive - 2090 lbs.
716 + 0 @ hatch from (1) &(2)*
floor above Elec. Equip.
A Train 733 + 0 (1)
A Train 716 + 0 @ hatch from (1) floor above
'- Method for Shutdown:
SSF for seal inj. and Ni pumps for charging.
- Equipment required for plant safe-shutdown and/or deccy heat removal f
6 e
~
i LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING _
Hisc. Equip. Monorail - A003 Crane:
4 Capacity:
5 Ton MC 1201-3-A General Arrangement Drawing No:
GG, 57 - El-, 716 + 0 Approximate Uppermost impact Area:
SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATI0ft CATEGORY LOADS Hatch Cover - 7200 lbs.
Mech./ Nuclear Equip.
(4)a 716 + 0 (3)
Misc. Equi p. - < 10,000 lbs.
695 + 0 NS Pump 1A i
Elec. Equip.
(3) 716 + 0 Train A (3) 695 + 0 Pump Motor A i
a
)
1
- Equipment required for plant safe-shutdown and/or decry heat removal d
e
d d
I LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crane:
Misc. Equip. Jib Crane - A011 Capacity: 3 Ton General Arrangement Drawing flo:
MC 1201-2-A & MC 1201-3-A lj Approximate Uppermost Impact Area:
HH, 56 - El. 716 + 0 il 5
LOADS SAFETY-RELATED* EQUIPMENT ELEVATI0ft 0F EQUIPMEtlT HAZ?.RD ELIMIflATI0ft CATEGORY
! Hatch Cover - 5400 lbs.
Mech;/ Nuclear Equip.
Misc. Equip. -<6000 Ibs.
716 + 0 (4)a j}i 695, + 0 @ hatch from (4)a floor above i.
Elec. Equip.
A Train 716 + 0 (1)
[
695 + 0 @ hatch from (4)a floor above Mech./ Nuclear &
Elec. Equip.
695 + 0 not @ hatch from (4)b floor above a
i i
e i
11 h
s.
4:
Ij Equipment required for plant safe-shutdown and/or deccy heat removal
i i
t LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING o
Crane:
RHR & Sump Pump Access Monorail - A001 Capacity: 5 Ton General Arrangement Drawing No:
MC 1201-3-A Approximate Uppermost Impact Area: cc, 56 - El. 716 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 7200 lbs.
Mech./ Nuclear Equip.
716 + 0 (4)a RN Train I A Air Handling 695 + 0 @ hatch from (1)
Uni t floor above Elec. Equ i p.
A Train 716 + 0 (1)
Ai r Handling Uni t Motors 695 + 0 @ hatch from (3) floor above Mech./ Nuclear &
Elec. Equip.
695 + 0 not @ hatch from (4)b floor above Equipment required for plant safe-shutdown and/or. decry heat removal
-.w
LOAD / IMPACT AREA MATRIX AUXILIARY BUILDING Crine:
Mi sc. Equi p. Mono rai l - A004 Capacity:
5 Ton I
General Arrangement Drawing No:
MC 1201-3-A Approximate Uppermost Impact Area: cc, 58 - El. 716 + 0 LOADS SAFETY-RELATED* EQUIPMENT ELEVATION OF EQUIPMENT HAZARD ELIMINATION CATEGORY Hatch Cover - 9100 lbs.
Mech./ Nuclear Equip.
Misc. Equip. - < 10,000 lbs.
716 + 0 (4)
KC, ND, RN Systems 695 + 0 @ hatch f rom (1) & (3)*
Train A & B and floor above non-essential headers Elec. Equip.
4 A & B Train 716 + s (1) & (3)*
A & B Train 695 + 0 @ hatch from (1) & (3)*
floor above Mech./ Nuclear &
Elec. Equip.
j 695 + 0 not @ hatch from (4)b floor above 2 Due to si te speci fic consideration, system srparation is maintained.
i
- Equipment required for plant safe-shutdown and/or decry heat removal
HAZARD ELIMINATION CATEGORIES 1.
This system has sufficienct separation and redundancy with cross connections and/or isolations to allow it to perform its safety function in the event of a load drop in this area.
2.
The location and function of this system is separable and redundant to that of the Standby Shutdown Facility, allowing the units to be shutdown in the event of a load drop in this area.
3.
Site-specific considerations preclude the need to consider load / target combination. These site-specific considerations are placed into two categories. The first category is crane restrictions. Certain hoists will be identified and locked to prevent their use during plant operation thus eliminating the need for safe-shutdown equipment identifed beneath them. The appropriate changes have been made to the station's crane and hoist program to ensure the continued validity of this category.
The second category of site specific considerations is maintenance sequencing. Certain cranes esage will be limited due to the McGuire Nuclear Station Technical Specifications. These specifications in part speak to restrictions on maintenance, maintenance sequencing, and maintained system redundancy.
4.
Analysis demoastrates that crane failure and subsequent load drop will not damage equipment required for plant safe-shutdown and/or decay heat removal.
a.
Equipment identified not required.
b.
Floor slab thickness of sufficient thickness and strength to prevent load from peretrating slab and striking equipment.
c.
All valves fail to safe postion.
d.
Previously analyzed main steam line break. The auxiliary feedwater system, although damaged, can still supply adequate flow, e.
The load drop can potentially affect suction isolation of one safety injection pump which could result in partial or total loss of RWST l
volume. However, alternate isolation exists which can be controlled from the main control room.
5.
Likelihood of handling system failure for this load is extremely small.
.