MONTHYEARML20217C6191999-09-30030 September 1999 Application for Amend to License DPR-22,changing Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys. Change Would Eliminate Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20203A3221999-01-28028 January 1999 Suppl 3 to 971125 LAR to License DPR-22 Re CST Low Level Hpci/Rcic Suction Transfer.Suppl Replaces TS Page 60d,to Include Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1271998-12-31031 December 1998 LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20195C8911998-11-11011 November 1998 Supplemental Application for Amend to License DPR-22, Allowing Removal of One CST from Svc for Maint ML20154L9401998-10-12012 October 1998 Suppl 2 to LAR to License DPR-22,revising Statement on Normal Shift Length & Correcting Typos ML20154L8991998-10-0909 October 1998 Suppl 1 to LAR to License DPR-22,replacing Exhibits B & C of Original Submittal to Reflect Item 2 ML20153F0161998-09-25025 September 1998 Suppl 1 to LAR for Amend to License DPR-22, Replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Re Condensate Storage Tank Low Level Hpci/ RCIC Suction Transfer ML20249C5091998-06-19019 June 1998 Rev 2 to LAR Dtd 960726,requesting Changes to Ts,App a Sections 3.6.C & 3/4.17.B & Associated Bases.Proposed Changes Are to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of MSLB Accident ML20216D2891998-03-25025 March 1998 Application for Amend to License DPR-22,providing Suppl 1 to 980313 Amend Request Re Plant Cycle 19 SLMCPR ML20216C9931998-03-19019 March 1998 Suppl Application for Amend to License DPR-22,requesting Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L1951998-03-13013 March 1998 Application for Amend to License DPR-22,revising TS Re Safety Limit Minimum Critical Power Ratio ML20202H6861997-12-0404 December 1997 Rev 1 to Application for Amend to License DPR-22,increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9531997-11-25025 November 1997 Application for Amend to License DPR-22,revising Tech Specs for Condensate Storage Tank Low Level Suction Transfer Setpoint for HPCI & RCIC Sys ML20210Q2881997-08-21021 August 1997 Suppl to 961125 Application for Amend to License DPR-22, Revising Page 6 of TS to Add Statement Re MCPR Values Applicable to Cycle 18 Only ML20141B9111997-06-19019 June 1997 Rev 2 to Application for Amend to License DPR-22,addressing Use of Containment Pressure for Assuring Adequate Net Positive Suction Head for ECCS Pumps Under worst-case Conditions ML20138F8661997-04-29029 April 1997 Application for Amend to License DPR-22,providing Suppl to 961125 Amend Request Re Safety Limit Minimum Critical Power Ratio ML20137W2141997-04-11011 April 1997 Rev 1 to Application for Amend to License DPR-22 Re Reactor Coolant Equivalent Radioiodine Concentration & Control Room Habitability ML20136B5361997-03-0404 March 1997 Application for Amend to License DPR-22,updating Design Basis Accident Containment Temp & Pressure Response ML20149M7221997-01-23023 January 1997 Application for Amend to License DPR-22,requesting Authorization for Changes to App A,Clarifying TS 3.5/4.5.C Re Min RHR & RHRSW Pump Requirements for Post Accident & Update of Design Basis Accident Containment & Temp Response ML20132C6361996-11-25025 November 1996 Application for Amend to License DPR-22,revising Section 2.1.A,SLMCPR Value & Deleting Sentence from Section 3.11.C of OLMCPR Re Limit Penalty for Single Recirculation Loop Operation ML20117A4281996-08-15015 August 1996 Application for Amend to License DPR-22,requesting Authorization for Changes to App a of Plant License as Shown on Attachments Labeled Exhibits A,B & C ML20116D8161996-07-26026 July 1996 Application for Amend to License DPR-22,changing TS Sections 3.6.C Re Coolant Chemistry & 3/4.17.B Re CR Emergency Filtration Sys ML20116G8911996-07-26026 July 1996 Application for Amend to License DPR-22,proposing Increase Max Reactor Core Power Level by 6.3% to 1,775 Mwt from Current 1,670 Mwt.Request Also Changes TSs Based on Power Rerate Evaluations ML20100Q3761996-03-0101 March 1996 Application for Amend to License DPR-22,removing Surveillance Requirement Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4271995-12-21021 December 1995 Application for Amend to License DPR-22,revising Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7021995-12-11011 December 1995 Application for Amend to License DPR-22,removing SR 4.7.D.4 from Plant TS & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1941995-11-14014 November 1995 Suppl to 950815 LAR to License DPR-22,incorporating Requirements of Option B,Section Iii.A for Type a Testing (Primary Containment ILRT) Per Reg Guide 1.163 ML20091K6731995-08-18018 August 1995 Rev 2 to 940608 LAR to License DPR-22,re Section 3.7/4.7, SGTS ML20087J4211995-08-15015 August 1995 LAR to License DPR-22,revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D7981995-07-0505 July 1995 LAR to License DPR-22,revising TS to Extend Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0921995-06-22022 June 1995 Application for Amend to License DPR-22,revising TS to Support Implementation of BWR Thermal Hydraulic Stability Solution ML20082N8691995-04-20020 April 1995 Rev 1 to 940608 LAR to License DPR-22,deleting 18 Month Surveillance Frequency Re Automatic Initiation of Test Specified in SR 4.7.B.2.b(3) & Modifying LCO for Spec 3.7.C.4 Re Secondary Containment ML20069J1011994-06-0808 June 1994 LAR to License DPR-22,revising TS Section 3.7/4.7, SGTS Re SR to Operate SGTS Monthly as Well as Revising Performance Requirements for SGTS Filters & Process Stream Electric Heaters ML20065B6581994-03-28028 March 1994 Revised Application for Amend to License DPR-22, Incorporating Improvement in Wording Originally Submitted for TS Section 6.7, Reporting Requirements, Re Identification of Approved Analytical Methods for COLR ML20065B6851994-03-28028 March 1994 Application for Amend to License DPR-22,changing TS Tables 3.2.4 & 4.2.1 Re SGTS Initiation Instrumentation ML20063C9821994-01-26026 January 1994 Application for Amend to License DPR-22,requesting Changes to Ts,To Require Valves Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8691994-01-0404 January 1994 Application for Amend to License DPR-22,revising TS Section 3.11, Reactor Fuel Assemblies by Removing Info Re Average Planar Linear Heat Generation Rate & Min Critical Power Ratio.Proposed Rev to Page 1 of 8 from COLR Encl ML20059E6011994-01-0303 January 1994 Application for Amend to License DPR-22,changing TS Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML20058G4311993-11-30030 November 1993 Application for Amend to License DPR-22,removing Chlorine Detection Requirements & Changing Control Room Ventilation Sys Requirments ML20056E1061993-08-10010 August 1993 LAR to Provide Clarification of Sampling & Analysis Requirements,Update Liquid Effluent Sampling & Analysis Requirements & to Correct Typographical Errors in TS Section for License DPR-22 ML20045G6061993-07-0707 July 1993 Application for Amend to License DPR-22,revising Requirements for Monitoring RCS Leakage,Per NRC Guidance Provided in GL 88-01,Suppl 1 & NUREG-1433, BWR/4 Improved Sts. ML20128M7101993-02-12012 February 1993 Application for Amend to License DPR-22,changing Ts,To Increase Minimum Core Spray Pump Flow to More Conservatively Account for ECCS Bypass Leakage Paths ML1129708521982-07-0202 July 1982 to 760907 Application for Amend to License DPR-22,changing Tech Spec to Allow Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed ML1129708171981-03-19019 March 1981 Application for Amend to License DPR-22 Revising Tech Specs App a Re Reactor Protector Sys,Submitted as Revision 1 to 810206 Amend Request ML1129708131981-02-0606 February 1981 Application for Amend to Ol.Changes to Tech Specs Requested Per Encl Exhibits A,B,C & D ML20024G4151978-08-16016 August 1978 Application for Amend to License DPR-22,revising Tech Specs by Raising Permissible Setpoint of Eight Safety/Relief Valves Installed at Plant to 1,108 Psig ML20127H2001978-08-10010 August 1978 Application for Amend to License DPR-22 to Authorize Use of Partial Drilled Model for Plant ML20024G3731978-03-21021 March 1978 Application for Amend to License DPR-22,changing Tech Specs Re Partial Drilled Model for Analyzing Retrofit Fuel Design Scheduled for Fall 1978 Refueling Outage ML20024G3931978-03-20020 March 1978 Application for Amend to License DPR-22,clarifying Sections of Interim Radioactive Effluent Tech Specs ML20024G3991978-03-20020 March 1978 Suppl 1 to 770902 Application for Amend to License DPR-22, Changing Tech Specs to Permit Containment ILRT to Be Terminated in Less than 24 H 1999-09-30
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217C6191999-09-30030 September 1999 Application for Amend to License DPR-22,changing Tech Specs 3/4.17.B, Control Room Emergency Filtration Sys. Change Would Eliminate Unnecessary in-place Testing of HEPA & Activated Charcoal Filters Based on Sys Operating Time ML20203A3221999-01-28028 January 1999 Suppl 3 to 971125 LAR to License DPR-22 Re CST Low Level Hpci/Rcic Suction Transfer.Suppl Replaces TS Page 60d,to Include Approved Amend 103 Changes for Use by NRC in Issuing SER ML20206P1271998-12-31031 December 1998 LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS ML20195C8911998-11-11011 November 1998 Supplemental Application for Amend to License DPR-22, Allowing Removal of One CST from Svc for Maint ML20154L9401998-10-12012 October 1998 Suppl 2 to LAR to License DPR-22,revising Statement on Normal Shift Length & Correcting Typos ML20154L8991998-10-0909 October 1998 Suppl 1 to LAR to License DPR-22,replacing Exhibits B & C of Original Submittal to Reflect Item 2 ML20153F0161998-09-25025 September 1998 Suppl 1 to LAR for Amend to License DPR-22, Replacing Exhibit C Which Contains TS Pages Incorporating Proposed Changes Re Condensate Storage Tank Low Level Hpci/ RCIC Suction Transfer ML20249C5091998-06-19019 June 1998 Rev 2 to LAR Dtd 960726,requesting Changes to Ts,App a Sections 3.6.C & 3/4.17.B & Associated Bases.Proposed Changes Are to Establish TS Requirements That Are Consistent W/Analysis Inputs Used for Evaluation of MSLB Accident ML20216D2891998-03-25025 March 1998 Application for Amend to License DPR-22,providing Suppl 1 to 980313 Amend Request Re Plant Cycle 19 SLMCPR ML20216C9931998-03-19019 March 1998 Suppl Application for Amend to License DPR-22,requesting Consistent Wording Throughout TS & Providing Sound Basis for Frequency of Actions Required Each Shift ML20248L1951998-03-13013 March 1998 Application for Amend to License DPR-22,revising TS Re Safety Limit Minimum Critical Power Ratio ML20202H6861997-12-0404 December 1997 Rev 1 to Application for Amend to License DPR-22,increasing Plant Max Power Level from 1670 Mwt to 1775 Mwt ML20203A9531997-11-25025 November 1997 Application for Amend to License DPR-22,revising Tech Specs for Condensate Storage Tank Low Level Suction Transfer Setpoint for HPCI & RCIC Sys ML20210Q2881997-08-21021 August 1997 Suppl to 961125 Application for Amend to License DPR-22, Revising Page 6 of TS to Add Statement Re MCPR Values Applicable to Cycle 18 Only ML20141B9111997-06-19019 June 1997 Rev 2 to Application for Amend to License DPR-22,addressing Use of Containment Pressure for Assuring Adequate Net Positive Suction Head for ECCS Pumps Under worst-case Conditions ML20138F8661997-04-29029 April 1997 Application for Amend to License DPR-22,providing Suppl to 961125 Amend Request Re Safety Limit Minimum Critical Power Ratio ML20137W2141997-04-11011 April 1997 Rev 1 to Application for Amend to License DPR-22 Re Reactor Coolant Equivalent Radioiodine Concentration & Control Room Habitability ML20136B5361997-03-0404 March 1997 Application for Amend to License DPR-22,updating Design Basis Accident Containment Temp & Pressure Response ML20149M7221997-01-23023 January 1997 Application for Amend to License DPR-22,requesting Authorization for Changes to App A,Clarifying TS 3.5/4.5.C Re Min RHR & RHRSW Pump Requirements for Post Accident & Update of Design Basis Accident Containment & Temp Response ML20132C6361996-11-25025 November 1996 Application for Amend to License DPR-22,revising Section 2.1.A,SLMCPR Value & Deleting Sentence from Section 3.11.C of OLMCPR Re Limit Penalty for Single Recirculation Loop Operation ML20117A4281996-08-15015 August 1996 Application for Amend to License DPR-22,requesting Authorization for Changes to App a of Plant License as Shown on Attachments Labeled Exhibits A,B & C ML20116D8161996-07-26026 July 1996 Application for Amend to License DPR-22,changing TS Sections 3.6.C Re Coolant Chemistry & 3/4.17.B Re CR Emergency Filtration Sys ML20116G8911996-07-26026 July 1996 Application for Amend to License DPR-22,proposing Increase Max Reactor Core Power Level by 6.3% to 1,775 Mwt from Current 1,670 Mwt.Request Also Changes TSs Based on Power Rerate Evaluations ML20100Q3761996-03-0101 March 1996 Application for Amend to License DPR-22,removing Surveillance Requirement Re Periodic Replacement of Containment Purge & Vent Valve Seat Seal ML20095J4271995-12-21021 December 1995 Application for Amend to License DPR-22,revising Main Steam Isolation & App J Leak Rate Test Requirements ML20095E7021995-12-11011 December 1995 Application for Amend to License DPR-22,removing SR 4.7.D.4 from Plant TS & Replaces Seat Seals for Drywell & Suppression Chamber Purge & Vent Valves Every Five Yrs ML20094M1941995-11-14014 November 1995 Suppl to 950815 LAR to License DPR-22,incorporating Requirements of Option B,Section Iii.A for Type a Testing (Primary Containment ILRT) Per Reg Guide 1.163 ML20091K6731995-08-18018 August 1995 Rev 2 to 940608 LAR to License DPR-22,re Section 3.7/4.7, SGTS ML20087J4211995-08-15015 August 1995 LAR to License DPR-22,revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh ML20086D7981995-07-0505 July 1995 LAR to License DPR-22,revising TS to Extend Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation ML20085N0921995-06-22022 June 1995 Application for Amend to License DPR-22,revising TS to Support Implementation of BWR Thermal Hydraulic Stability Solution ML20082N8691995-04-20020 April 1995 Rev 1 to 940608 LAR to License DPR-22,deleting 18 Month Surveillance Frequency Re Automatic Initiation of Test Specified in SR 4.7.B.2.b(3) & Modifying LCO for Spec 3.7.C.4 Re Secondary Containment ML20069J1011994-06-0808 June 1994 LAR to License DPR-22,revising TS Section 3.7/4.7, SGTS Re SR to Operate SGTS Monthly as Well as Revising Performance Requirements for SGTS Filters & Process Stream Electric Heaters ML20065B6581994-03-28028 March 1994 Revised Application for Amend to License DPR-22, Incorporating Improvement in Wording Originally Submitted for TS Section 6.7, Reporting Requirements, Re Identification of Approved Analytical Methods for COLR ML20065B6851994-03-28028 March 1994 Application for Amend to License DPR-22,changing TS Tables 3.2.4 & 4.2.1 Re SGTS Initiation Instrumentation ML20063C9821994-01-26026 January 1994 Application for Amend to License DPR-22,requesting Changes to Ts,To Require Valves Be Tested at Pressure Greater than or Equal to Calculated Peak Containment Internal Pressure Re Design Basis LOCA ML20062N8691994-01-0404 January 1994 Application for Amend to License DPR-22,revising TS Section 3.11, Reactor Fuel Assemblies by Removing Info Re Average Planar Linear Heat Generation Rate & Min Critical Power Ratio.Proposed Rev to Page 1 of 8 from COLR Encl ML20059E6011994-01-0303 January 1994 Application for Amend to License DPR-22,changing TS Surveillance Requirement 4.6.E.1.a to Require Valves to Be Tested Per Section XI Inservice Testing Requirements of ASME Boiler & Pressure Vessel Code ML20058G4311993-11-30030 November 1993 Application for Amend to License DPR-22,removing Chlorine Detection Requirements & Changing Control Room Ventilation Sys Requirments ML20056E1061993-08-10010 August 1993 LAR to Provide Clarification of Sampling & Analysis Requirements,Update Liquid Effluent Sampling & Analysis Requirements & to Correct Typographical Errors in TS Section for License DPR-22 ML20045G6061993-07-0707 July 1993 Application for Amend to License DPR-22,revising Requirements for Monitoring RCS Leakage,Per NRC Guidance Provided in GL 88-01,Suppl 1 & NUREG-1433, BWR/4 Improved Sts. ML20128M7101993-02-12012 February 1993 Application for Amend to License DPR-22,changing Ts,To Increase Minimum Core Spray Pump Flow to More Conservatively Account for ECCS Bypass Leakage Paths ML1129708521982-07-0202 July 1982 to 760907 Application for Amend to License DPR-22,changing Tech Spec to Allow Plant to Remain at Substantial Power Level W/One Recirculation Pump in Operation & Equalizer Valve Closed ML1129708171981-03-19019 March 1981 Application for Amend to License DPR-22 Revising Tech Specs App a Re Reactor Protector Sys,Submitted as Revision 1 to 810206 Amend Request ML1129708131981-02-0606 February 1981 Application for Amend to Ol.Changes to Tech Specs Requested Per Encl Exhibits A,B,C & D ML20148N4531978-11-0606 November 1978 Amend 37 to Provisional Oper Lic DPR-22,changing Tech Spec to Improve Simmer Margin of Safety/Relief Valves ML20024G4151978-08-16016 August 1978 Application for Amend to License DPR-22,revising Tech Specs by Raising Permissible Setpoint of Eight Safety/Relief Valves Installed at Plant to 1,108 Psig ML20127H2001978-08-10010 August 1978 Application for Amend to License DPR-22 to Authorize Use of Partial Drilled Model for Plant ML20024G3731978-03-21021 March 1978 Application for Amend to License DPR-22,changing Tech Specs Re Partial Drilled Model for Analyzing Retrofit Fuel Design Scheduled for Fall 1978 Refueling Outage ML20024G3931978-03-20020 March 1978 Application for Amend to License DPR-22,clarifying Sections of Interim Radioactive Effluent Tech Specs 1999-09-30
[Table view] |
Text
- -
\
i Eq;ubwry 1)ocket file UNITED STATES NUCLEAR REGUIATORY COMMISSION 3-H %
- ~ " ~ ~
NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PIANT Docket No. 50 263 REQUEST FOR AMENIMENT TO OPERATING LICENSE NO. DPR-22 (License Amendment Request Dated March 11, 1976)
Northern States Power Company, a Minnesota corporation, requests authorization for changes to the Technical Specifications as shown on the attachments labeled Exhibit A and Exhibit B. Exhibit A describes the proposed changes along'with reasons for the change. Exhibit B is a set of Technical Specification pages incorporating the proposed changes.
This request contains no restricted or other defense information.
NORTHERN STATES POWER COMPANY By YQ]Y)h)
(?J Wachter Vice President, Power Production 6 System Operation On this lith day of March ,
1976 , before me a rotary public in and for said County, personally appeared L J Wachter, Vice President, Power Production & System Operation, and first being duly swom acknowledged that he is authorized to execute this document in behalf of Northern States Power Company, that he knows the contents thereof and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay.
/
Zurl.)
/
A M.tx_
/
, u:: - ....::me m H' P#
DENISE E. BRANAU WoftdY PUsuC ammurwm 4
' , HEMNZPIM SMNffT i gyCosumiseles Eginetut.M.1ME ' ,
9102110407 760311 PDR ADOCK 05000263 P PDR
9
,p w a. !XJC6id bIkh
. . ... .. - ~ M. _ *.h MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 LICENSE AMENDMEWI REQUEST DATEP MARCH 11, 1976 PROPOSED CHANGES TO THE TECHNICAL SPECIFICATIONS, APPENDIX A 0F PROVISImAL OPERATING LICENSE DPR-22 Pursuant to 10 CFR 50.59, the holders of Provisional Operating License DPR-22 hereby propose the following changes to the Appendix A Technical Specifications:
Table 3.7.1, Primary Containment Isolation PROPOSED CHANGES
- a. Change the nomal position for the "Seppression Chamber Vent Bypass" valve from closed to open,
- b. Aid a new Group 2 isolation valve, " Suppression Chamber to Drywell N2 Recirculation'with a maximum pemitted ope. rating time of 60 seconds and a normal position of open.
REAS0t FOR CHANGES Table 3.7.1 is a list of all primary containment isolation valves in lines two inches in diameter or larger. A new isolation valve, CV-7440, is being added in the 2-inch supression chamber vent bypass line as part of a system to maintain a constant differential pressure between the dryvell and the torus. This valve and the present Sup-pression Chamber Vent Bypass Valve, CV-2384, will be open during opera-tion of the system.
The proposed system (Figure 1) will remove nitrogen from the torus via CV-2384 and newly installed isolation valve CV-7440 using one of two blowers. The blower will discharge nitrogen to the drywell through two 1-inch isolation valves, CV-7437 and CV-7436, originally installed as part of a nitrogen pumpback system. Blower speed and recirculation flow will be manually adjusted to maintain the drywell pressure 1 psi above the torus pressure. The system, up to the second containment isolation valve in the suction and discharge lines, satisfies all design, quality assurance, and testability requirements set forth in 10 CFR 50
(
. - - _ - - . .- - - - . - ._ _- ~ . . - - --
l l
l EKHIBIT A ,
2 SAFETV EYALUATION In a let:er dated February 27, 1976 from Mr. B. C. Rusche, Director, Office of Nucice.r Reactor Regulation, USNRC, to Mr. L. O. Mayer, NSP, the Commission presented the results of their assessment of a proposal te mainLvin a 1-psi differential pressure between the Monticello dry-well and suppression chamber. To facilitate this action, a nitrogen recirculetion system has been designed. Use of this system v111:
- a. minimize containment venting
- b. minimize consumption of nitrogen We believe that the new system can be installed without prior approval of the Commission in accordance with the provisions of 10 CFR 50.59.
An additional containment isolation valve, CV-7440, will be required, however, and must be listed in the Technical Specification Table of Containment-Isolation Valves. In addition, an existing valve, CV-2384, will be normally open during plant operation instead of normally closed.
This system will utilize existing penetrations to the drywell and torus to pressurize the drywell. Containment isolation will be provided by double isolation control valves at both penetrations. The 1-inch line to the drywell already has two isolation valves which were originally in-stalled for the N2 Pumpback System.
A new 2-inch control valve, CV-7440, will be installed in series with CV-2384 to provide for denble isolation of the supply line coming from the torus vent header. This valve witi be controlled by the same circuitry that control; the outboard N2 Pumpback isolation valve, CV-7437.
Since the isolation logic for the outboard isolation valves is separate from the inboard valves, the necessary separation criteria required for isolation valves in series is satisfied (Figure 2).
CV-7440 will be provided with limit switches which indicate if the valve is open or closed. These limit switches will be wired in conjunction with the.1Lmit switches of CV-7437 so that both valves must be closed to get the proper indication in the control room. The handswitch for CV-7437 will also control CV-7440, i
.. _ . -~-- _. - - _
EXHIBIT A SAFETY EVALUATION (continued)
CV-7440 will be a 2-inch Grinnel Air Motor Dikphragm Valve - 3225 which is a Type I nuclear grade valve. This valve is an air to open, spring to close valve and has a Grade "M" EFI Nordel diaphragm which is service-able up to 300 F. This valve is designed to handle a line pressure of 108 psi at a temperature of 2810F which exceeds the torus design require-ments of 41 psi end 2810F.
The piping installed on both lines (to the drywell and to the torus) will be installed in accordance with Bechtel Piping Specification M-40 Class HE as far as the seismic hanger and will utilize certified materials and approved welding procedures.
~
The blowers to be installed are leak-tight and are recommended by the supplier for this particular application in which leakage would consist of potentially low icvel radioactive gas.
The ins tallation of the new control valve (CV-7440) and the new piping which will connect it to the 2" bypass line on the vent header will be an addition to the containment pressure boundary. The design of this piping and the seismic hangers required has been reviewed and approved by the Monticello Architect-Engineer.
Quality Assurance activities will be conducted in accordance with ASME Code Section III paragraph NA4000. Quality Assurance Documentation will be reviewed and approved by an authorized inspector from Hartford Steam Boiler Inspection and Insurance Company prior to the start of work and while it is in progress.
l
I ETJIIBIT A
.k.
TO STANDBY GAS TREATENT SYSTEM
^ - '"
DRYWELL A0 2896 A0 2383 X.205 cv 7436 O
f f- (f torus l CV 7h37 CV 2384 .
hT4 CV 7440 X N X 2100% CAPACITY Blob'ERS
-N N+- X TO N2 PUMPBACK SYSTEM Figure 1. Propose Nitrogen Recirculation System.
DG11 BIT A 5
i, SEAL IN .. ... RESE'T REACTOR BLDG EXHAUST PLENUM HIGH RADIATION 1
.. REACTOR BLDG EXHAUST PLENUM HIGH RADIATION
~
_ .~ REACIOR BLDG EXEAUST PLENUM MONITORS DOWNSCALE 8
m
~~
SPENT FUEL POOL I HIGH RAD 3 TION h --
SPENT PJEL POOL HIGH RADIATION O 2 .~ .~ SPEITI FUEL POOL
> MONITORS DWIGCALE o
s :: ._
__ REACIOR LOW WATER 12/EL
(( -.
OR DRYWELL PRD3SURE HIGH
.L
__ AUT0/CLWE HANDSWITCH SEAL IN y SOLEN 0ID FOR REIAY CV 7437 [ NEW i Cy 7440 SOLEN 0ID
( g' )l v
i Figure 2. Group 2 Isolation logic for Outboard Isolation Valves.
i l
1
l <
}G -y.s 4 '~
au, e..,wa.8 II-14,
.uw &
LICENSE AMENDMENT REQUEST DATED MARCH 11, 1976 EXHIBIT B Ihis exhibit consists of the following pages revised or added to incorporate the proposed Technical Specification changes:
153 Also included are the following pages autxnitted as part of our License Amendment Request dated January 30, 1976 which are affected by installation of the N2 Recirculation System:
153 154H 154J C
1 l_ __ . _ ._. - - - - - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ----- -