Text
,:e k[.f March 16, 1990 p
- c p
.4
' Docket Nos. 50-277~
DISTRIBUTION w/ enclosure-g~
'and 50-278 fuocumst1Je GSuh NRC PDR RClark.
.Mr. ~ George A. Hunger, Jr. -
- Director-Licensing, MC 5-2A-5 PDI-2 Reading. EJordan Philadelphia Electric Company SVarga ACRS(10)
Nuclear _ Group Headquarters BBoger KEccleston Correspondence Control Desk WButler BGrimes
,P.O. Box No. 195' M0'Brien
.f c, Wayne, PennsylvaniaL 19087-0195 q,k,
p
,-7
,g Jear.Mr. Hunger:
SUBJECT:
UNIMPLEMENTEDUNkESOLVEDSAFETYISSUES(TACNO.74538)
+
' ' +
RE':
TPEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
~
t, i
I' On October 19,11989 thestaffissuedGenericLetter(GL)89-21whichrequeste@
i.
information con'cerning the status of implementation of unresolved safety issues:
-(USIs)atPeachBottomAtomicPowerStation, Units 2and3. Based on your ;,
t responses to this GL dated November 30, 1989 and February 13, 1990, our' review
'N
- of HRC records 'and discussions with your staff, the NRC staff has compiled t.he enclosed list of unimplemented USIs. 'The results of the staff's assessment of USI implementation were presented to the Commission at a meeting on February 14,
,3
- 1990E E
Theenclosdretothis.letterpresentsthestaffunderstanding.ofthecurrent'
~
s
' status ofEall unimplemented USI's for the Peach Bottom facility. The staff encourages your efforts to complete the unimplemented USIs. With respect to 1
~
-USI'A titled "BWR Feedwater Nozzle Cracking," we have reviewed the
]
l l implementation information.provided in your February 13, 1990 letter and agree with its conclusions. The staft considers the implementation of USI A-10 to be closed.
9 i
If you have questions or comments concerning the above, please do not hesitate i
l.
to contact us.
J l
Sincerely, a
/s/
Gene Y. Suh, Project Manager Project Directorate 1-2 i oc,32 bo 37 0 [po -
l Division of Reactor Projects 1/11 l
l PDA MmW pot
~
Office of Nuclear Reactor Regulation P,
1
Enclosure:
As stated L
L cc w/ enclosure:
See next page 1
[74538/ HUNGER]
(1 l
PDI-2/PM PDI-2/D 3
- fh0 hit 0
s/ /w i
_~.
3 l
' < jif"%jo.g
(((,
.p.
UNITED STATES
$9l 1
~ NUCLEAR REGULATORY COMMISSION g--
L
- r.
.l WASHING TON, D. C. 20665 S
'...* g March 16, 1990 g
- Docket flos. 50-277
]
and 50-278 Mr. George A. Hunger, Jr.
Director-Licensing, MC 5-2A-5 Philadelphia Electric Company Nuclear. Group Headquarters '
. Correspondence Control Desk 4
P.O. Box.No. 195 Wayne, Pennsylvania-19087-0195
Dear Mr. Hunger:
SUBJECT:
UNIMPLEMENTED UNRESOLVED SAFETY ISSUES (TAC NO. 74538) i RE:
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 l
[
On October 19, 1989 thestaffissuedGenericLetter(GL)89-21whichrequested information concerning the status of implementation of unresolved safety issues (USIs)atPeachBottomAtomicPowerStation, Units 2and3. Based on your responses to this GL dated November 30, 1989 and February 13, 1990, our review D
of NRC. records and discussions-with your staff, the NRC staff has compiled the L-enclosed list of unimplemented USIs. The results of the staff's assessment of USI implementation ~ were presented to the Comission at a meeting on February 14, 1990..
The enclosure to'this letter presents the staff. understanding of the current-status.of all unimplemented USI's for the Peach Bottom facility. The staff encourages your efforts to complete the unimplemented USIs. -With respect to c
L USI A-10. titled "BWR Feedwater Nozzle Cracking," we have reviewed the L
implementation -information provided in your February 13,.1990 letter and agree with its conclusions. The staff considers the implementation of USI A-10 to be closed.
If you have questions or comments concerning the above, please do_not hesitate:
4
..to contact us.
l-l Sincerely, M4W Gene Y..
uh, Project Manager
,.E' Project Directorate I-2 Division of Reactor Projects I/II' Office cf Nuclear Reactor Regulation
Enclosure:
o As stated l
cc w/ enclosure: See next page
,.y
b;iY l
f.; L <*
i L9 ;
ENCLOSURE
+
e PEACH BOTTOM ATOMIC POWER _ STATION,' UNITS ? AND 3
- c UNIMPLEMENTED 'JSI'S 9
i Expected Implemented USI TITLE' Date Remarks A-44 Station Blackout 4/30/91 Licensee's 4/17/89 submittal under staff review.
A-46 Seismic Qualification of 11/30/91 Implementation Equipment in Operating Plants requirements being developed by staff and industry.
A-47 Safety implication of To Be Response to GL Control Systems in LWR Determined 88-19 due 3/90.
Nuclear Power Plants 1
1
1
- 4
o.
k Mr. George A. Hunger, Jr.
Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:
Troy B. Conner, Jr., Esq.
Single Point of Contact 1747 Pennsylvania Avenue, N.W.
P. O. Box 11880 Washington, D.C.
20006 Harrisburg, Pennsylvania 17108-1880 I
Philadelphia Electric Company Mr. Thomas M. Gerusky, Director ATTH: Mr. D. M. Smith, Vice President Bureau of Radiation Protection
[
Peach Bottom Atomic Power Station Pennsylvania Department of Route 1, Box 208 Environmental P4 sources Delta, Pennsylvania 17314 P. O. Box 2063 Harrisburg, Pennsylvania 17120 Philadelphia Electric Company ATTN: Regulatory Engineer, Al-2S Mr. Albert R. Steel, Chairman Peach Bottom Ator.ic Power Station Board of Supervisors Route 1, Box 208 Peach Bottom Township k
Delta. Pennsylvania 17314 R. D. #1 Delta, Pennsylvania 17314 E
Resident Intpector U.S. Nuclear Regulatory Commissica Public Service Comission of Maryland F
Peach Bottom Atomic Power Station Engineering Division
~
P.O. Box 399 ATTN: Chief Engineer E
Delta, Pcinsylvania 17314 231 E. Baltimore Street Baltimore, MD 21202-3486 Regional Administrator, Region I U.S. Nuclear Regulatory Comission Mr. Tom Magette 475 Allendale Road Power Plant Research Program King of Prussia, Pennsylvania 19406 Department of Natural Resources B-3 Mr. Roland Fletcher Tawes State Office Building Department of Environment Annapolis, Maryland 21401 201 West Preston Street Baltimore, Maryland-21201 E-E M