05000311/LER-1981-058-03, /03L-0:on 810709,boric Acid Storage Tank Level Decreased to Less than Spec Min.Caused by Constant Demand for Makeup to RCS to Compensate for Changes to RCS Specific Vol.Boric Acid Batching Initiated

From kanterella
(Redirected from ML20010B853)
Jump to navigation Jump to search
/03L-0:on 810709,boric Acid Storage Tank Level Decreased to Less than Spec Min.Caused by Constant Demand for Makeup to RCS to Compensate for Changes to RCS Specific Vol.Boric Acid Batching Initiated
ML20010B853
Person / Time
Site: Salem 
Issue date: 08/07/1981
From: Dickey F
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010B852 List:
References
LER-81-058-03L, LER-81-58-3L, NUDOCS 8108180384
Download: ML20010B853 (1)


LER-1981-058, /03L-0:on 810709,boric Acid Storage Tank Level Decreased to Less than Spec Min.Caused by Constant Demand for Makeup to RCS to Compensate for Changes to RCS Specific Vol.Boric Acid Batching Initiated
Event date:
Report date:
3111981058R03 - NRC Website

text

N;c FCIM 366 U. S. NUCLE AA CECULATO3Y COMMiniCA

'W LICENSEE EVENT REPORT CONTftOL BLOCC l l

l l

l l

l (PLEASE PRINT 03 TYPE ALL CEOU12EO INFOAMATIO4 i

e lo li; lN lJ ls Ic ls 12 l@l o f ol -l c i o f o f ol o l -l o f o l@l 4 l d l l 1l 1l@LLj g 7

8 9 LICENSEE CODE 14 15 LICENSE N v6ER 26 26 LICEN$E TVPE JQ

$) CAT bd COv7 IoIil

.":,$"J l tlOl of sl of ol o f 31 il 1 )@l 0 l 7 l 0 l 9 l 8 I lfl 0 l 8l0 l7 l 6 l 1lg

?

8 6a 61 pp NET NgMBER 68 69 EVENT OATE 78 75 REPORT C AT E 6;

" EVENT DESCA,PTION AND PROBABL'E CONSEQUENCES h Io l l l On July 9, 1981, during unit cooldown, the boric acid storage tank (BAe./ level gl decreased to less than specification minimum due to primary system makeup to j

Io la i l compensate for changes in Reactor Coolant System specific volume. At 1418 hours0.0164 days <br />0.394 hours <br />0.00234 weeks <br />5.39549e-4 months <br />, lc Ie1 [ July 9, 1981, the boric acid storage tank was declared inoperable and action

@l statement 3.1.2.6.a was entered.

l0 l 7 l l J

l0j6l l

,j 7

so E:

Sv$TEV CAU$E

CAUSE

Cove vA;yt C00E CODE SU80COE COM*0NENT COOE sug;OOE SW8000E lCl9l l Rl Bl@ W@ l A l@ l A lC l C lU l M l U l@ Qg g g 7

8 9

lo 11 12 13 16 19 20 SE OJENTI AL OCCUPRENCE RE* ORT R E vtS'ON EEm og EVENT VE aR RE*DaT NO COOE TYPE N;

O17REP l8l1l l_l l0l5l8l lA l0l3l lL l gog 2,

n 22 2

u v

n 2,

so 1,

2:

K N A T ON ON PLANT M TM MQgR$ 22 58 i POR 8.

SueP LI MAN FA T cEr lXl@lZl@

lZl@

lZl@

l0l0l0lUl

]g g

lLlg lZl9l9l9 33 38 3t 36 37 40 41 42 43 as as CAUSE DESCAIPTION AND COA 8tECTivE ACTIONS h lt io l l Although boric acid batching was initiated, it was unable to maintain BAST level Ii ii j l above the minimum requirement. The unit cooldown rate was decreased.nd batching j Iij7[ l was continued until BAST level was restored. At 1511 hours0.0175 days <br />0.42 hours <br />0.0025 weeks <br />5.749355e-4 months <br />, July 9, 1981, the leveJ ggl was restored and action statement 3.1.2.6.a was terminated.

l LLid ! I I

7 8 9 O

ST U

% POWER OTHERSTATUS SCO RV Qi$00ygRv OgsgRIPTION l1 l5 l b h l0 l0lOlhl N/A l

l Alhl Operator Observation l

Activity CO TENT RELEASE 08 RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE NA l

l NA

}

QW

@@l 7

e s to is A4 45 s:

PERSONNEL EXPOSURES NUMBER TYPE DESCRnPTt04 ITTD1ofofol@lZl@l NA

_I PERSONNE L INJURIES WUMBER OE50RIPTION

!dolCdi NA 1 H 7

8 9 11 12 83 LOS$ OF OR CAMAGE TO FACILITY TYPE CESCRIPTION b dh!

NA 7

a e io so 155UE CEECRIPTION 1

2lol hl NA l

llllIIIlIIIIII a e io es se so ;

ank & key

~

w Aus nc *REPARER PHONE-~

8108180384 810807 PDR ADOCK 05000311

.S PDR;