05000321/LER-1981-057-03, /03L-0:on 810611,temporary Change to HNP-1-6907 (Reactor Core Isolation Cooling Pump Suction Hydro) Found Not Approved by Mgt within Reguired Time.Caused by Personnel Failure to Maintain Adequate Control Over Procedure

From kanterella
(Redirected from ML20009F644)
Jump to navigation Jump to search
/03L-0:on 810611,temporary Change to HNP-1-6907 (Reactor Core Isolation Cooling Pump Suction Hydro) Found Not Approved by Mgt within Reguired Time.Caused by Personnel Failure to Maintain Adequate Control Over Procedure
ML20009F644
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/30/1981
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009F630 List:
References
LER-81-057-03L, LER-81-57-3L, NUDOCS 8107310376
Download: ML20009F644 (2)


LER-1981-057, /03L-0:on 810611,temporary Change to HNP-1-6907 (Reactor Core Isolation Cooling Pump Suction Hydro) Found Not Approved by Mgt within Reguired Time.Caused by Personnel Failure to Maintain Adequate Control Over Procedure
Event date:
Report date:
3211981057R03 - NRC Website

text

-

(7 77)

LICENSEE EVENT REPORT CONTROL ELOCK: l l

l l

l l

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

101i1 I c l A l E l I l H l l l@l 010 l-1010 l 01010 l-1010 l@l 4l 11 11 Il ll@l I

l@

7 8 J LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T loIil SfnN I L l@l 015 l 0 l 0 l 0 l 3 l 2 l1 l@l 01611 l1 l 8 l1 l@l016l3l0l8l1l@

7 3

60 68 DOCKET NUMBER 68 ti9 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h 10121 10n 6-18-81. at 9:00 EDT with Unit 1 at 0% thermal nower and in the start-l iO i3i tup mode, a temporary change (SRO) to HNP-1-6907, RCIC PUMP SUCTION HYDROI l0 pilwas found not approved by the plant management with 14 days as reouired I

!O isi iby Tech Spec Sect. 6.8.3.C.

No significant events occurred.

The oper-l 10lsll ability of the system were not adverselv affected.

This is a repetitivei 10l7!levent (Ref. LER 50-321/1979-067) and there vere no effects upon public I

iOgiihealth and safety due to this event.

I DE CODE SUSC DE COMPONENT CODE SUSCODE S

E lOl9l l 2 l 2 l@

@ (CJ @ l 2l 2l 2l 2l 2l 2l @ (2_j @ l2 l @

7 8

9 10 11 12 f3 18 19 20 SEQUENTI AL OCCURRENCE REPORT REVISloN LE R RO EVENT YEAR REPORT NO, CODE TYPE N O.

@ sgg i 8l 11 1-1 1015171 l/l I0l3!

l LI l---J [0_j a

21 22 23 24 26 27 28 29 30 31 32 m

TK r A

ON PL NT ME HOURS 22 S8 iT FOR1 8.

UPPLIE MAN FACTURER l Hlgl34Hlg l352l@ l2 l@

l 0l 0l 0l l

l Yl@

LY_J@

IZI@

1Z1919191@

33 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 [T,-] lAn oversight of personnel to maintain adequate control over the temporarvi O

Ichange procedure was the cause.

Site personnel have been reminded of I

, i i i,,,iithe necessity of controlling the changes and its subsequent approval. Thel i1 i3i junit is now in full compliance with requirements of Tech Specs and no I

g lfurther reporting is required.

I 80 7

8 9 STA S

% POWER OTHER STATUS dis O Y

DISCOVERY DESCRIPTION W W@ l 0l 0l 0l@l NA l

lAl@l Administrative Check l

ACTIVITY CO TENT RELE ASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELE ASE

, Ii I6 I l.Z j @ LZ]@l NA l

L.

NA l

PERSONNEL EXPOS ES NUMBER TYPE

DESCRIPTION

l i 171 l 0 l 0 l 0 l@l 2 l@l NA l

PERSONNF t iN;u' RIES NUMBE R

DESCRIPTION

g l0l0l0l@l NA l

80 7

8 9 11 12 LOSS OF OR OAMAG TO FACILITY lZl@l NA l

i 9 80 7

8 9 10 NRC USE ONLY E @OESCRIPTION @ N,{DRADOCl405000

_ [lllll;[l lllj 8107310376 810630 IS l

[2 j oj on ti9 80 5 7

8 9 10 n-t.

t.

. Serv. PHONE:

912-%7 7MT NAME OF PREPARER

(

LER #:

50-321/1981-057 Licensee:

Georgia Power Company Facility Name:

Edwin I. Hatch Docket #:

50-321

Narrative

Report for LER 50-321/1981-057 On 6-18-81, at 9:00 EDT, with Unit 1 at 0% thermal power in the Startup Hot Standby Mode it was found that the temporary SRO revision to HNP-1-6907, "RCI" PUMP SUCTION HYDR 0" was not submitted for PRB approval within 14 days of the change as required by Tech Spec Section 6.8.3.C.

The review due date was 6-11-81 and the procedure change was not approved until 6-18-81 by the plant management.

No significant event occurred.

This was determined reportable under Tech Spec Section 6 9.1.9.C.

The

cause

of the event was due to an oversight by personnel in maintaining appropriate control over the temporary SRO changes due dates.

Personnel have been reminded ~of the necessity of maintaining adequate evntrol over temporary SRO procedures, especially over submittal dates for procedure approval.

This is a

repetitive event (Ref.

LER 50-321/1979-067) and there were no effects upon public health and safety due to this event.

The unit is now in full compliance with the requirements of Tech Specs and no further reporting is required.

l l