05000321/LER-1981-066-03, /03L-0:on 810701,during Steady Operation & While Performing Reactor Water Level Functional Test & Calibr, Bota Reactor Recirculation Pumps Tripped,Resulting in Power Reduction.Caused by Personnel Error

From kanterella
(Redirected from ML20009E466)
Jump to navigation Jump to search
/03L-0:on 810701,during Steady Operation & While Performing Reactor Water Level Functional Test & Calibr, Bota Reactor Recirculation Pumps Tripped,Resulting in Power Reduction.Caused by Personnel Error
ML20009E466
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/17/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009E465 List:
References
LER-81-066-03L, LER-81-66-3L, NUDOCS 8107280235
Download: ML20009E466 (2)


LER-1981-066, /03L-0:on 810701,during Steady Operation & While Performing Reactor Water Level Functional Test & Calibr, Bota Reactor Recirculation Pumps Tripped,Resulting in Power Reduction.Caused by Personnel Error
Event date:
Report date:
3211981066R03 - NRC Website

text

LICENSEE EVENT REPORT CONTROL BLOCK: {l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATioN) 1 6

10 l i l l Gl Al El Il Hj 1l@l O l 0 l -l 0 l 0 l O l 01 O l - l O l O l@l 4 l 1 l 1 l 1 l 1 l@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMSER 25 26 LICENSE TYPE JO

$7 CAT 58 CON'T 10111 37,$$lLl@lOi5l0l0lOl3l2111@l0l7l0l1]8l11@l01711171811j@

7 8

60 61 DOCKET NUMBER 68 69 EVENT DATE 14 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB A8LE CONSEQUENCES h 10 l 2 l l While the plant was in steady state operation at 92% power and performing i

iO i3l l Reactor Water Level (ADS) Functional Test _ and Calibration, both Reactor l

10141 l Recirculation Pumps tripped when returning 1821-N042B, Reactor Water l

101._11 Level ( ADS) Yarway, to service. Tech Specs 3.6.J.1 requires forced l

l0 ls l l circulation above 1% power. All ECCS systems were operable. A temporary l

l O l 71 l forced power reduction resulted.

The health and safety of the public was l

l O is i l not affected.

This is a non-repetitive event.

l 80 7

8 9 E

CODE SUSC E COMPONENT CODE St,8 CODE SU E

1019l II lB l@ l Al@ l C l@ lI l N l S l T l R I V l@ l Sl@ l Zl@

7 8

9 10 11 12 13 18 19 20 SEQUENTI A L OCCURRENCE REPORT REVISION LER RO EVENT YE AR REPORT NO.

00DE TYPE N O, O agg,1 18111 1-1 1016161 l/l

~10 13 1 l Ll l-l 101 s

,,,_ 21 22 23 24 26 27 28 29 30 31 32 K N A N

O PLANT ME HOURS SB I FOR B.

L MANUF C RER l H l@l Z l@

l B l@

l Z l@

l0l01Il0l l Y l@

lNl@

lNl@

lBl0l8l01@

33 34 35 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h

.' IiiOI l The cause of this event was personnel error.

The technicians failed to l

li til I valve in instrument 1821-N0428 slowly enough.

The resulting perturbation I

i, i7i l in the common sensing line caused Reactor High Pressure Recirc Pump Trip l

lij3l l switches to actuate.

P'.. sonnel were counseled on proper instrument l

li#4i i valving.

I 7

8 9 80 ST S

% POWER OTHER STATUS IS O RY DISCOVERY DESCRtPTION li I 5 I l El@ l 0 l 9 l 2 l@l NA l

lBl@l Surveillance Testing l

ACTIVITY CO TENT RELEASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE li Is l U @ l Zl@l NA l

l NA-l 7

8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUM8ER TYPE

DESCRIPTION

l i 17 l l Ol Ol 0l@l Z l@l NA l

IES PERSONNE L INJU NuMeeR -

oESCRiPTiCN@

li Ia l l 0l 01 Ol@l NA l

7 8 9 11 12 80 LOSS OF OR DAMAG TO FACILITY l 1 l 9 l l Z l@l NA..

l

~

8107280235 810717

,o 7

8 9 10 PUB LICITY PDR ADOCK 05000321 NRC UsE ONLY iSSuEo oeSCRiPriCN S

PDR Na I

i IIIIiiiiiiii!

L2 l.a.J Ln_181 7

8 9 10 68 69 80 7.

R. T. Nix, Supt. of Maint.

pgoyg;912-367-7781

{

NAME OF PREPARER

..- ~

LER No.:

50-321/1981-066 i

Licensee:

Georgia Power Company Facility:

Plant E. I. Hatch 3-Docket No.:

50-321 i

Narrative

Report for LER 50-321/1981-066 i

On July 1,1981, while the plant was in steady state operation at 92%

power and performing Reactor Water Level (ADS) Functional Test and Calibration, both Reactor Recirculation Pumps tripped when returning 1B21-N0428, Reactor Water Level (ADS) Yarway, to service.

Tech Specs 3.6.J.1 requires forced circulation above 1% power. All ECCS systems were operable.

This event resulted in a temporary forced power reduction.

The health and safety of the public was not affected.

The cause of this event was personnel error.

The technician failed to valve in instrument IB21-i!042B slowly enough.

The resulting perturbation in the common sensing line caused Reactor High Pressure Recirc Pump Trip switches to actuate.

Personnel were counseled on proper instrument valving.

J A generic review revealed no inherent problems.