05000321/LER-1981-061-03, /03L-0:on 810629,during Steady State Operation, Offgas Hydrogen Analyzers 1N62-N009A & B Were Reported Inoperative.Caused by Analyzer a Out of Calibr.Cause of B Problem Not Stated

From kanterella
(Redirected from ML20009C578)
Jump to navigation Jump to search
/03L-0:on 810629,during Steady State Operation, Offgas Hydrogen Analyzers 1N62-N009A & B Were Reported Inoperative.Caused by Analyzer a Out of Calibr.Cause of B Problem Not Stated
ML20009C578
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/09/1981
From:
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20009C577 List:
References
LER-81-061-03L, LER-81-61-3L, NUDOCS 8107210239
Download: ML20009C578 (2)


LER-1981-061, /03L-0:on 810629,during Steady State Operation, Offgas Hydrogen Analyzers 1N62-N009A & B Were Reported Inoperative.Caused by Analyzer a Out of Calibr.Cause of B Problem Not Stated
Event date:
Report date:
3211981061R03 - NRC Website

text

-

i

.O P

LER #:

50-321/1981-061 Licensee:

Georgia Power Company Facility Name:

Edwin I. Ha ch Docket #:

50-321

Narrative

Report for LER 50-321/1981-061 On 6-29-81, while the plant was in steady state operation at 2400 MWt and while performing HNP-1-3604, GE H2 Analyzer Calibration, analyzer N62-N009A was found out of calibration, and N62-N009B was found inoperative.

The event date

'i s unknown but was reported inoperative on 6-29-81.

Tech Specs table 2.1.3.h, page 2-7, requires one operable channel.

Plant operation was not affected as a result of this event.

The health and safety of the public was not affected.

This is a repetitive event as last reported on LER 50-321/1981-056.

The cause of this event is presently unknown.

MR 1-81-5048 has been issued to correct the problem.

An update report will be submitted.

A generic review revealed no inherent problems.

e107210239 810709 PDR ADOCK 05000321 S

PDR