Application for Amend to License NPF-7,making Implementation Schedule of License Condition 2.C.21(h) Re Containment Dedicated Penetrations Consistent W/Schedule for NUREG-0737, Item II.B.2.Proposed Condition & Fee Encl
ML20008G256
Person / Time
Site: North Anna Dominion icon.png
Issue date: 07/01/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.2, TASK-2.E.4.1, TASK-TM 406, NUDOCS 8107070180
Download: ML20008G256 (4)


Text

. .

VINGINIA ELucrHIC AND Powna COMPANY nicnxoxo,vmoxxu encoi

, 9 dC0k' N 4 JUL 0 6193;, -

July 1, 15d1 O

\#\ %b

n. u. t.... .o q r NuctaAa oramanons 'M N Mr. Harold R. Denton, Director Serial No. 406 Office of Nuclear Reactor Regulation N0/DWL,WRM:acm Attn: Mr. Robert A. Clark, Chief Docket No. 50-339 Operating Reactors Branch No. 3 License No. NPF-7 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

PROPOSED AMENDMENT TO OPERATING LICENSE NPF-7 NORTH ANNA POWER STATION UNIT NO.2 Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment to Operating License NPF-7 for North Anna Power Station Unit No. 2.

The proposed change is enclosed.

In our letter to the NRC dated March 5, 1981 (Serial No. 142), Vepco stated our position regardit.g Item II.E.4.1 of NUREG-0737. NRC Staff concurrence of this position has not been received as of the date of this submittal. In brief, Vepco's position is that the requirements of Item II.E.4.1, " Dedicated Hydrogen Penetrations", have been met at the North Anna Power Station. The commitment remains to modify the Hydrogen Control System valves from manual to remotely actuated valves; however, this commitment results from the requirement of NUREG-0737 Item II.B.2, " Plant Shielding". Accordingly, the implementation schedule of condition 2.C.21(h) should be consistent with the schedule of Item II.B.2, which is January 1, 1982 or the first refueling outage thereafter, but no 'later than July 1,1982.

This request has been reviewed by the Station Nuclear Safety and Operat.ing Committee and the Safety Evaluation and Control staff. It has been determined that this request does not involve an unreviewed safety question.

We have evaluated this request in accordance with the criteria in 10 CFR 170.22. It has been determined that this request involves a safety issue which the Staff should be able to determine does not represent a significant hazards consideration; therefore, a Class III license amendment fee is required. A voucher check in the amount of $4,000.00 is enclosed in payment of the required fee.

Very trul. yours,

/'

R. H. Leas urg Vice Pres! dent - Nuclear Operations 8107070100 8107 h[

  1. kk',,,

, PDR ADOCK 05000

  • P _

9 R W n'gg\

Via01MIA ELECTaTC AND Powsa COMPANY TO Harold R. Denton Attaciments:

1. Proposed License Condition 2.C.21.(h)
2. Voucher Check No. 32391 for $4,000.00 cc: Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II e

COMMONWEALTH OF VIRGINIA )

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R. H. "..rasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this / day of  %,v2~, , 19 8/ .

My Commission expires: .::7 - 7 S , 19 '[

b C' Notary Public 7h #h (SEAL) y . 9 y , - - - - , . _- - . - . . . - - , , , , . -

3 Proposed License Condition 2.C.21.(h)

(h) Containment Ded! rted Penetrations (Section 22.3 Item II.E.4.1)

VEPCO shall install redundant remote actuat ad valves in series to isolate the containment vacuum pumps from the combustible gas con-trol system. VEPCO shall also convert the manual valves in the hydrogen recombiner piping to remote manual actuation no later than the implementation schedule of Item II.B.2 of NUREG-0737 per con-dition 2.C.21(d) above.

d w

.n _ _ . , - . , . - . . - . . . , . _ . _ , _ _ , . , , _ - . . . ~_ ,,y .,-, . . . ,.. . .,,.....___p , , c.,,,,.r. . .r-.. _ , . , . . , ~ _ . .