ML20005B747

From kanterella
Jump to navigation Jump to search

Advises That Proposed Mods to Instrument Bus Power Supplies Are Acceptable.Util Must Provide Schedule for Completing Mods within 30 Days.Tech Spec Changes Must Be Submitted within 90 Days
ML20005B747
Person / Time
Site: Point Beach  
Issue date: 08/12/1981
From: Clark R
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
TAC-42249, TAC-42250, NUDOCS 8109020073
Download: ML20005B747 (4)


Text

bM

=

r _

+

4._

w

~

.=

DISTRIBUTION h @ ft/3 "-O/f l

~

AUG 121981 Da det fit h NRC PSR J

1 Docket Nos.

L PFR and 50-301 NSIC TERA ORB #3 Rdg D. Eisenhut Mr. Sol Burstein OELD Executive Vice President I&E-3 Wisconsin Electric Power Company R. A. Clark 231 West Michigan Street T. Colburn Milwaukee, Wisconsin 53201 P.M. Kreatzer ACRS-10

Dear Mr. Burstein:

J. Heltemes Gray Files On April 21, 1980 we forwarded to you our Safety Evaluation Report (SER) on the modifications to the instrumentation power supply for Point Beach Nuclear Plant Units 1 and 2 as contained in your submittals of April 30, May 2 and May 21, 1979. The staff condluded in our SER that the modiff-cations to the design of the vital instrument power supply identified in your submittals provided additional assurance that a loss of offsite power would not cause the diesel generators to be overloaded and was therefore an acceptable interim fix. However, a remaining staff concern was that the proposed modifications did not provide protection against single failure causing the spurious starting of all emergency loads in both units.

By letter dated April 21, 1980, we forwarded our SER and requested that you provide additional information to correct this deficiency and that you provide your schedule for completion including any changes needed in the Technical Specifications. You responded to our request by letters dated May 29, 1980 and November 3,1980 with your proposed modifications indi-cating your intent to complete the modifications by January 1,1981.

We have completed our evaluation of your responses and find your proposed modifications to the Point Beach Units 1 and 2 instrument bus power supplies to be acceptable. A detailed analysis is contained in the enc 1csed Safety Evaluation Report (SER).

If not completed, you are requested to subnit within 30 days of receipt of this letter, a schedule consistent with completing the proposed modifications l

at the earliest possible date. You are also requested to submit within 30 days receipt of this letter, your proposal for any necessary TechgigaP / 4' 9 Specification changes associated with these modifications.

s Sincerely, i

0I M

$J

.a

' 1.S

.21

/s

-x b

Robert A. Clark, Chief p.

V Operating Eeactors Branch #3 Division of Licensing G

l

Enclosure:

As stated r

Q-g/ l L

OR 8 :DL 0R,B83 g'zer "M

.cc:..See..next,.pagt

..h.......li t P

TColb ep MAClark Tu-4 8109020073 810812 8/ i 781 8/4/81 8/rv/81 o"

PDR ADOCK 05000266 "nP PDR OFFICIAL RECORD COPY

.uscro % 3 m

E Wisconsin Electric Power Company CC*

Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 1800 M Street, N. W.

6612 Nuclear Road Vashir.gton, D. C.

20036 Two Rivers, Wisconsin 54241 Joseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 302 E. Washington Avenue Madison, Wisconsin 53703 U. S. Environmental Protection Agency Federal Activities Branch Region Y Office ATTN: EIS COORDINATOR 230 S. Dearborn Street Chicago, Illinois 60604 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702

. ~ - -.

Figura 1 1604 l ee.3 7.003 2 (M 4 b13C 14 0 d338 h32C 1342 IG32 j

Vo y 2032 2S42 i

_1 e.

A' i

t i

2 2 6.rtcSy Caaa cas p

1 1

1 l

'l O

C 1

o 6

6 6

d 6

l 1

l

.l l

l l

1-I fg) lH4ERTCRS N

l l

l l

1 I

4-N g

Nl N

N MapT ierJ AL. EC P.

~

8 p

9

@q b tSTet4 G Ege.

p O

Q p

To3 lYo4 2To3 2Yo4 (On:Tc)

(TE La.oN

( A.94Te )

(Ygttog) '

Unix kl

. u s ir *2.

2 e

-_.,-_,..,._,_.m..,

_.-.__y

c.

E SAFETY EVALUATION REPORT INSTRUMENT BUS 610DlFICAT10NS P'OlNT BEACH NUCLEAR PLANT, UNITS } AND 2

1.0 INTRODUCTION

Wisconsin Electric Power Company, the licensee, requested approval for modification to the design of vital instrument bus power supplies in its letter of May 29, 1980. The purpose of the modification is to correct an unacceptable power supply arrangement discovered during the safety evaluation of plant changes resulting from IE Bulletin do.79-06A, dated April 4, 1979.

The safety evaluation of April 21, 1979, indicated that the existing instrument bus design did not provide protection against single failures causing a spurious starting of all emergency loads in both units which would overload the shared emergency diesel generators. The licensee provided additional informaticn describing the proposed modifications in its letter dated November 3, 1980. The purpose of the review is to determine if the proposed design rectifids the single failure inadequacy discovered in the earlier safety evaluation.

2.0 DISCUSSION AND EVALUATION I

The modification to the instrument bus power supplies consists of the addition of two batteries, three battery chargers, six static inverttes, and associated distribution buses and wiring to supply power to the white (1YO3 and 2YO3) ane yellow (1YO4 and 2YO4) instrument buses of both units (see Figure 1).

These modifications essentially duplicate the existing power supply arrangement for the red (1Y01 and 2YO2) and blue (lYO2 and 2YO2) instrument buses.

Under the proposed design, each instrument bus would be powered by one of two static inverters receiving power from a DC bus.. Redundant instru-ment buses (white and yellow) would be powered from independent and redun-dant DC buses. The DC buses would each be powered by a battery bank or a battery charger. A third, shared battery charger would be capable of serving either DC bus but would be interlocked to prevent the redundant DC buses from being connected.

The proposed modification in combination with the existing power supply design for the red and blue instrument buses results in an instru-ment bus system whien can be operated without offsite power.

The design is such that tne worst case single failure in conjunction with a ' loss of off-site power and a LOCA in one unit, would result in the failure of only one instrument aus per unit. Such failure could not result in a spurious starting of all emergency loads in both units.

3.0 Conclusion Based on the above, the staff concludes that the proposed modifications to the Point Beach Nuclear Plant, Units 1 and 2,. instrument bus power supplies result in an instrument bus system which is capable of operation without offsite power. Additionally, the four instrument buses per unit are redundant and independent such that no single failure in conjunction with a loss of offsite power and a LOCA in one unit would result in a spurious starting of all emergency loads in both units. Accordingly, the staff finds the modifications to be acceptable.

1

_g__

sy-y e.-v-%-w--

ye arge gs--me-=,.s-ee--g.--g+-s,.wp 3

9y

-,w--1y-iew,wev-w---e w---

9,,. - -- -, - - - -

.----g,+-mgi9yywagg

.cu----ee3--.sg---.m.,,e------w g-tog--

as--weegw.mr-m-u-+*-*-my--

o w er-EM-9--es-.--

1+".

-