Letter Sequence Request |
|---|
|
|
MONTHYEAR05000301/LER-1980-001-01, /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced1980-02-28028 February 1980 /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced Project stage: Other 05000301/LER-1980-001, Forwards LER 80-001/01T-01980-02-28028 February 1980 Forwards LER 80-001/01T-0 Project stage: Other ML19323F9221980-04-21021 April 1980 Forwards Safety Evaluation Supporting Mods to Power Supplies Providing Addl Assurance That Loss of Offsite Power Would Not Cause Diesel Generator Overload.Single Failures Causing Spurious Starting of Emergency Loads Should Be Addressed Project stage: Approval ML19323F9241980-04-21021 April 1980 Safety Evaluation Supporting Mods to Power Supplies Providing Addl Assurance That Loss of Offsite Power Would Not Cause Diesel Generator Overload Project stage: Approval ML19312E1421980-05-29029 May 1980 Forwards Description of Proposed Mods to Instrument Bus Power Supplies,In Response to NRC .Mods Will Be Completed by 810101.Diagram of Proposed Supply Sys to White & Yellow Instrument Busses Encl Project stage: Other ML19340B8231980-11-0303 November 1980 Submits Addl Clarification of Proposed Instrument Bus Mods, in Response to NRC Request.Describes Provisions for Preventing Parallel Operation of New & Old Batteries Project stage: Other ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2 Project stage: Other ML20263G7211981-06-11011 June 1981 Single Line Diagram:125V AC Instrument Bus Supply Sys Project stage: Other ML20005B7471981-08-12012 August 1981 Advises That Proposed Mods to Instrument Bus Power Supplies Are Acceptable.Util Must Provide Schedule for Completing Mods within 30 Days.Tech Spec Changes Must Be Submitted within 90 Days Project stage: Other ML20039B2141981-12-10010 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 73 to Incorporate Mods to Vital Instrument Power Supplies Project stage: Request ML20039B2181981-12-10010 December 1981 Proposed Tech Spec Pages 15.3.7-1,15.3.7-2,15.3.7-3,15.3.7-4 & 15.3.7-5 Re Auxiliary Electrical Sys Project stage: Other ML20084N5641984-04-30030 April 1984 Safety Evaluation Supporting Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20084N5591984-04-30030 April 1984 Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively, Providing Limiting Conditions for Operation Re Instrument Power Supply Sys Equipment Upgrades Project stage: Other ML20091J6641984-05-29029 May 1984 Forwards Class III Fee Per 840522 Request Re 811210 Application for License Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively Project stage: Request ML20093K3391984-07-17017 July 1984 Corrected Pages to Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively,providing Limiting Conditions for Operation Re Instrument Power Supply Sys Equipment Upgrades Project stage: Other ML20098F1501984-09-25025 September 1984 Revised Application for Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively,delaying Effective Date for Amends to 840301 to Ensure Adequate Startup & Testing of New Equipment.Fee Paid Project stage: Request ML20112D2391984-12-27027 December 1984 Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively, Changing Effective Date of Tech Specs Re Equipment Installation & Testing Project stage: Other ML20112D2651984-12-27027 December 1984 Safety Evaluation Supporting Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval 1981-06-11
[Table View] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
o msconsin Elecinc comcouem 231 W. MICHIGAN, P.O. BOX 2046 MILWAUKEE. WI 53201 May 29, 1984 CERTIFIED MAIL Mr. William O. Miller, Chief License Foo Management Branch Office of Administration U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555
Dear Mr. Millcr:
DOCKET NOS. 50-266 AND 50-301 LICENSE APPROVAL FEE SUBMITTAL LICENSE AMENDMENTS 84 AND 88 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Your letter dated May 22, 1984 discussed the license amendment approval foes datormined by your staff to be appropriato for our license amendment application dated December 10, 1981.
You had determined that a Class III approval was necessary because of the nature of the changes requested.
Wisconsin Electric was, therefore, requested to remit an additional sum of $2,800 to complete the fee requirements for review of License Amendment Nos. 84 and 88 to DPR-24 and DPR-27, respectively.
Accordingly, please find enclosed a check in the amount of $2,800 to complete this foc payment.
Very truly yours, f
f fbY Vice Presid nt-Nuclear Power C. W. Fay r
Appt;c;;ng,.
Enclosure (Check No. 788344) en,c,9
,,,o,_
Copy to NRC Resident Inspector
- Aoicant, U3!" of cheere~~
~
- j
(
8406060087 040529
'DR ADOCK 05000266 Dara c;,,,n 2
PDR L ? * '
. CLC lA L O Q