Other: 05000301/LER-1980-001, Forwards LER 80-001/01T-0, 05000301/LER-1980-001-01, /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced, ML19312E142, ML19340B823, ML19341B086, ML20005B747, ML20039B218, ML20084N559, ML20093K339, ML20112D239, ML20263G721
|
MONTHYEAR05000301/LER-1980-001, Forwards LER 80-001/01T-01980-02-28028 February 1980 Forwards LER 80-001/01T-0 Project stage: Other 05000301/LER-1980-001-01, /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced1980-02-28028 February 1980 /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced Project stage: Other ML19323F9221980-04-21021 April 1980 Forwards Safety Evaluation Supporting Mods to Power Supplies Providing Addl Assurance That Loss of Offsite Power Would Not Cause Diesel Generator Overload.Single Failures Causing Spurious Starting of Emergency Loads Should Be Addressed Project stage: Approval ML19323F9241980-04-21021 April 1980 Safety Evaluation Supporting Mods to Power Supplies Providing Addl Assurance That Loss of Offsite Power Would Not Cause Diesel Generator Overload Project stage: Approval ML19312E1421980-05-29029 May 1980 Forwards Description of Proposed Mods to Instrument Bus Power Supplies,In Response to NRC .Mods Will Be Completed by 810101.Diagram of Proposed Supply Sys to White & Yellow Instrument Busses Encl Project stage: Other ML19340B8231980-11-0303 November 1980 Submits Addl Clarification of Proposed Instrument Bus Mods, in Response to NRC Request.Describes Provisions for Preventing Parallel Operation of New & Old Batteries Project stage: Other ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2 Project stage: Other ML20263G7211981-06-11011 June 1981 Single Line Diagram:125V AC Instrument Bus Supply Sys Project stage: Other ML20005B7471981-08-12012 August 1981 Advises That Proposed Mods to Instrument Bus Power Supplies Are Acceptable.Util Must Provide Schedule for Completing Mods within 30 Days.Tech Spec Changes Must Be Submitted within 90 Days Project stage: Other ML20039B2181981-12-10010 December 1981 Proposed Tech Spec Pages 15.3.7-1,15.3.7-2,15.3.7-3,15.3.7-4 & 15.3.7-5 Re Auxiliary Electrical Sys Project stage: Other ML20039B2141981-12-10010 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 73 to Incorporate Mods to Vital Instrument Power Supplies Project stage: Request ML20084N5591984-04-30030 April 1984 Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively, Providing Limiting Conditions for Operation Re Instrument Power Supply Sys Equipment Upgrades Project stage: Other ML20084N5641984-04-30030 April 1984 Safety Evaluation Supporting Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20091J6641984-05-29029 May 1984 Forwards Class III Fee Per 840522 Request Re 811210 Application for License Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively Project stage: Request ML20093K3391984-07-17017 July 1984 Corrected Pages to Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively,providing Limiting Conditions for Operation Re Instrument Power Supply Sys Equipment Upgrades Project stage: Other ML20098F1501984-09-25025 September 1984 Revised Application for Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively,delaying Effective Date for Amends to 840301 to Ensure Adequate Startup & Testing of New Equipment.Fee Paid Project stage: Request ML20112D2651984-12-27027 December 1984 Safety Evaluation Supporting Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20112D2391984-12-27027 December 1984 Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively, Changing Effective Date of Tech Specs Re Equipment Installation & Testing Project stage: Other 1981-06-11
[Table View] |
Text
4*
ORC M
((g((f
'n UNITED STATES
^
NUCLEAR REGULATORY COMMISSION y.
o WASHING TON, 0. C. 20555 9..
April 21, 1980 Cocket No.
/201 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201
Dear Mr. Burstein:
We have reviewed your April 30, May 2, and May 21, 1973 submittals concerning the modifications to the design of the vital instrurent power supply for the Point Beach Nuclear Plant Units Nos.1 and 2.
These modifications were designed to correct an unacceptable arrangement of cower sources.
Based on our review, as presented in the enclosed safety evaluation, we have concluded that this problem is unique to Point Beach and the previous mod-ification to the power supplies provided additional assurance that a loss of offsite power would not cause the diesel generators to be overloaded and, therefore, was an acceptable interim fix. However, we do not believt that the modification provided protection against single failures causing the spurious starting of all emergency loads in both units.
(Such an event could result from a loss of offsite power and a LOCA in Unit 1, and a failure of the B battery or Unit 1 inverter under the present design.)
It i3 our understanding that additional modifications are being considered be your engineering group to correct this deficiency. We, therefore, request
.Jat you review the enclosed safety evaluation to er.sure that your modifi-cations will resolve the issues presented therein and inform us, within 30 days of your receipt of this letter, of your planned nodifications and your schedule to implement those modifications. Consideration should also be given to the changes which will be needed in the Technical Specifications.
800526 O
!!r. Sol Burstein Acril 21,1980 1
l i
Since we would like to have a timely resolution of this matter, we are available for a meeting if you so desire.
If you have any questions on this matter, please contact us.
Sincerely, f
.?b4 b"A
, ff A. Schwencer, Chief
[st Operating Reactors Eranch #1 Division of Operating Reactors
Enclosure:
Safety Evaluation cc w/ encl:
See next page
-~ - -
Mr. Sol Burstein Wisconsin Electric Pcwer Company April 21, 1980 t
j cc: Mr. Bruce Churchill, Esquire Shaw, Pittman, Potts and Trowbridge j!
1800 M Street, N.W.
Washington, D. C.
20035 t
Document Department j
University of Wisconsin i
Stevens Point Library l
Stevens Point, Wisconsin 54481 Mr. Glenn A. Reed, Manager Naclear Operat'f ons 4
Wisconsin Electric Pcwer Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 i
Ms. Kathleen M. Falk i
General Counse)
Wisconsin's Environmental Decade 114 E. Mifflin Street Madison, Wisconsin 53703 4