ML20112D239

From kanterella
Jump to navigation Jump to search

Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively, Changing Effective Date of Tech Specs Re Equipment Installation & Testing
ML20112D239
Person / Time
Site: Point Beach  
Issue date: 12/27/1984
From: John Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20112D240 List:
References
TAC-55983, TAC-55984, NUDOCS 8501140146
Download: ML20112D239 (4)


Text

@ itiv

/

UNITED STATES f"

o,h NUCLEAR REGULATORY COMMISSION

.E CASHINGTON, D. C. 20555 t

WISCONSIN ELECTRIC POWER COMPANY DOCKET N0. 50-266 POINT BEACH NUCLEAR PLANT, UNIT NO. 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.87 License No. DPR-24 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (thelicensee)datedSeptember 25, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations;

~

D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

i g1Q$ko$N R

e l

l b--

. 2.

Accordingly, Amendment No. 84 to Facility Operating License No. DPR-24 is amended by changing the effective date as indicated in paragraph 3 below.

3.

This license amendment is effective upon completion of equipment installation and testing but not later than March 1,1985.

FOR THE NUCLEAR REGULATORY COMMISSION EY 1

James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance: December 27, 1984 e

O 6

Y

8'.

'o UNITED STATES g

E' NUCLEAR REGULATORY COMMISSION o

g E

WASHINGTON, D. C. 20555

...../

WISCONSIN ELECTRIC POWER COMPANY DOCKET N0. 50-301 POINT BEACH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.92 License No. DPR-27 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Wisconsin Electric Power Company (the licensee) dated September 25, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (i) that the activities authorized by this. amendment can be conducted without endangering the health and sa'fety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

-2 2.

Accordingly, Amendment No. 88 to Facility Operating License No. DPR-27 is amended by changing the effective date as indicated in paragraph 3 below.

3.

This license amendment is effective upon completion of equipment installation and testing but not later than March 1,1985.

FOR THE NUCLEAR REGULATORY COMMISSION l

-fifc b

'/ James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance:

December 27, 1984

.a 9

~

_ _. ~.. _

- -,,