Other: 05000301/LER-1980-001, Forwards LER 80-001/01T-0, 05000301/LER-1980-001-01, /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced, ML19312E142, ML19340B823, ML19341B086, ML20005B747, ML20039B218, ML20084N559, ML20093K339, ML20112D239, ML20263G721
|
MONTHYEAR05000301/LER-1980-001, Forwards LER 80-001/01T-01980-02-28028 February 1980 Forwards LER 80-001/01T-0 Project stage: Other 05000301/LER-1980-001-01, /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced1980-02-28028 February 1980 /01T-0:on 800221,during Full Power Operation, Momentary Loss of Red Instrument Bus Occurred,Resulting in Power Range Channel N41 Failing Low.Caused by Faulty Capacitor in 2DY01 Power Supply.Capacitor Replaced Project stage: Other ML19323F9221980-04-21021 April 1980 Forwards Safety Evaluation Supporting Mods to Power Supplies Providing Addl Assurance That Loss of Offsite Power Would Not Cause Diesel Generator Overload.Single Failures Causing Spurious Starting of Emergency Loads Should Be Addressed Project stage: Approval ML19323F9241980-04-21021 April 1980 Safety Evaluation Supporting Mods to Power Supplies Providing Addl Assurance That Loss of Offsite Power Would Not Cause Diesel Generator Overload Project stage: Approval ML19312E1421980-05-29029 May 1980 Forwards Description of Proposed Mods to Instrument Bus Power Supplies,In Response to NRC .Mods Will Be Completed by 810101.Diagram of Proposed Supply Sys to White & Yellow Instrument Busses Encl Project stage: Other ML19340B8231980-11-0303 November 1980 Submits Addl Clarification of Proposed Instrument Bus Mods, in Response to NRC Request.Describes Provisions for Preventing Parallel Operation of New & Old Batteries Project stage: Other ML19341B0861980-12-31031 December 1980 Instrument Bus Mods,Point Beach Nuclear Plant,Units 1 & 2 Project stage: Other ML20263G7211981-06-11011 June 1981 Single Line Diagram:125V AC Instrument Bus Supply Sys Project stage: Other ML20005B7471981-08-12012 August 1981 Advises That Proposed Mods to Instrument Bus Power Supplies Are Acceptable.Util Must Provide Schedule for Completing Mods within 30 Days.Tech Spec Changes Must Be Submitted within 90 Days Project stage: Other ML20039B2181981-12-10010 December 1981 Proposed Tech Spec Pages 15.3.7-1,15.3.7-2,15.3.7-3,15.3.7-4 & 15.3.7-5 Re Auxiliary Electrical Sys Project stage: Other ML20039B2141981-12-10010 December 1981 Application for Amend to Licenses DPR-24 & DPR-27,consisting of Tech Spec Change Request 73 to Incorporate Mods to Vital Instrument Power Supplies Project stage: Request ML20084N5591984-04-30030 April 1984 Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively, Providing Limiting Conditions for Operation Re Instrument Power Supply Sys Equipment Upgrades Project stage: Other ML20084N5641984-04-30030 April 1984 Safety Evaluation Supporting Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20091J6641984-05-29029 May 1984 Forwards Class III Fee Per 840522 Request Re 811210 Application for License Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively Project stage: Request ML20093K3391984-07-17017 July 1984 Corrected Pages to Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively,providing Limiting Conditions for Operation Re Instrument Power Supply Sys Equipment Upgrades Project stage: Other ML20098F1501984-09-25025 September 1984 Revised Application for Amends 84 & 88 to Licenses DPR-24 & DPR-27,respectively,delaying Effective Date for Amends to 840301 to Ensure Adequate Startup & Testing of New Equipment.Fee Paid Project stage: Request ML20112D2651984-12-27027 December 1984 Safety Evaluation Supporting Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively Project stage: Approval ML20112D2391984-12-27027 December 1984 Amends 87 & 92 to Licenses DPR-24 & DPR-27,respectively, Changing Effective Date of Tech Specs Re Equipment Installation & Testing Project stage: Other 1981-06-11
[Table View] |
Text
@ itiv
/
UNITED STATES f"
o,h NUCLEAR REGULATORY COMMISSION
.E CASHINGTON, D. C. 20555 t
WISCONSIN ELECTRIC POWER COMPANY DOCKET N0. 50-266 POINT BEACH NUCLEAR PLANT, UNIT NO. 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No.87 License No. DPR-24 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (thelicensee)datedSeptember 25, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations;
~
D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
i g1Q$ko$N R
e l
l b--
. 2.
Accordingly, Amendment No. 84 to Facility Operating License No. DPR-24 is amended by changing the effective date as indicated in paragraph 3 below.
3.
This license amendment is effective upon completion of equipment installation and testing but not later than March 1,1985.
FOR THE NUCLEAR REGULATORY COMMISSION EY 1
James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance: December 27, 1984 e
O 6
Y
8'.
'o UNITED STATES g
E' NUCLEAR REGULATORY COMMISSION o
g E
WASHINGTON, D. C. 20555
...../
WISCONSIN ELECTRIC POWER COMPANY DOCKET N0. 50-301 POINT BEACH NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.92 License No. DPR-27 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Wisconsin Electric Power Company (the licensee) dated September 25, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this. amendment can be conducted without endangering the health and sa'fety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
-2 2.
Accordingly, Amendment No. 88 to Facility Operating License No. DPR-27 is amended by changing the effective date as indicated in paragraph 3 below.
3.
This license amendment is effective upon completion of equipment installation and testing but not later than March 1,1985.
FOR THE NUCLEAR REGULATORY COMMISSION l
-fifc b
'/ James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing Date of Issuance: