05000219/LER-1981-018-01, /01T-0:on 810417,equipment Operator Found Valves Were Blocked from Fully Opening by Scaffolding Placed by Contractor Personnel.Caused by Personnel Error.Scaffolding Repositioned

From kanterella
(Redirected from ML20003J006)
Jump to navigation Jump to search
/01T-0:on 810417,equipment Operator Found Valves Were Blocked from Fully Opening by Scaffolding Placed by Contractor Personnel.Caused by Personnel Error.Scaffolding Repositioned
ML20003J006
Person / Time
Site: Oyster Creek
Issue date: 04/30/1981
From: Crosby P
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003J005 List:
References
LER-81-018-01T, LER-81-18-1T, NUDOCS 8105080319
Download: ML20003J006 (1)


LER-1981-018, /01T-0:on 810417,equipment Operator Found Valves Were Blocked from Fully Opening by Scaffolding Placed by Contractor Personnel.Caused by Personnel Error.Scaffolding Repositioned
Event date:
Report date:
2191981018R01 - NRC Website

text

NRC PORM 364

~

U. S. NUCLE A'3 f.EGULATORY COMMISSION t.lCENSEE EVENT REPORT CCSTuot stoex: l l

l l

l l@

iPLEAsE PRINT OR TYPt ALL REQUIRED INFORMATIOM

~ [o_.LJ.I Ni Jl 0 l C l P l 1 I@l 0l 0l -l 0l 0l 0l 0 l 0 l - l 0 l 0 @l 4 l1 l1 l1 Il l@l l

l@

f 8 9 UCENSEE CCCE 84 IS WCENS4Nuustm 2h 24 UCENSE TYPE JO ti GAT 68 con'T

.__..ICl1l l L l@l 0 l 5 l0 l0 l0 l2 l1 l9 @l 0 l 4 l 1 l 7 l 8 l1 l@l l

l l

l l

l@

- s a

en si ooCxermuusan es se aveur ears 74 75 mepoar cars so EvEN r OESCRIPTION AND PACSA8LE CONSEQUENCE 3 h

_ loI tl On April 17, 1981 the equipent operator assicned to open the Reactor l

._ g o t a g l Bn41dMg to suppression charber vacuum breakers found the valves were Io I si I blocked frctn fully opening by scaffolding placed by contractor personnel.

l l o i s i ; Valve V-26-17 was ocarpletely prevented fran opening and valve V-26-15 l

t c ie t iwas prevented from opening nore than 75 percent. This event is ccxisidere l

l c ; ; ; ;d a violation of T.S. 3.5.A.4.a and reportable in accordance with T.S.

l io!ai 1 9.2.a(6). Valve V-26-15 would have performed its intended function.

l 6

m

a SYSTEV

CAUSE

CAUSE COMP.

VALvt 0002

.0004

$Us00:3 C0'.tPON E';T 03E syg:::t gyg:0=g Ioist i Sl Al@ l Al@ l rl@ lV l A l L lV lE lX l@ l Cl@ (C_j @

J 3

10 11 12 12 18 19 23

$5CUENT1AL CCCW4MENCE REPCMT REVISICN EVENTvfAM RE*CRT NO.

CCCE TYPE NO.

@ ggs 30 Q l1 l

[_]

l 0l1l 8l y

l 0l 1l lTj

[]

y g

Pg 21 22 23 24 24 27 28

S 30 31 32 Aho C P NT MET HCURS S8 8CP S.

SLP y MA p mgm A EN lzl@l l@ Izlh Q@

l 010l 0 l 0 l [Y l@

[N l@

lNl@

l Al 5 l 8 l 5 lg.

u 2<

as u

21 ao

<s a2 sa a

a, CAUSE DESCRIPT1CN ANC CCARECTIVE ACTIONS 27

,,, o, lThe cause of this occurrene is attributed to personnel error. Contractor l personnel placed scaffolding in a position to block the valves tran i

ii,,,

gopening fully. Plant shutdown continued as scheduled and was in the mld l shutdown condition by 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> on April 18, 1981. The scaffolding l

l m ; blocking the valves was repositioned on Monday, April 20, 1981.

so DISCCvtMy CESCRIPTtCN h A

% PCwtA CTNER STATUS iSC Y

l NA l

l A [gl Operator Observation l

lt j s l lD l@ l 0 l 7 l 4 l@l

'2 a

l

',Jrivifv Cafi~T 4=CuNTe, Cmity @ l tocarion C,..tuu @

li I e i l.z ] @o C,azuisl z l@l

.euin

'NA l

NA l

.so~~ao,ossi sC=me, @

NA

~uon.

Tv..

li l 71 1010 lo l@lz l@l l

'=

=

,,,,C, ~,62.,

2.scomC~@

Nuon.

ITTil l O I O 10 l@l NA l

C1108 cm O ACE TO FACluty Q J

Tv*E CE5Catario%

g,,f

- 11191 dj@l NA l

l 7

a 3 to 30

@$t$em, Ties @

NRc usE cNLY l

M y News Release l

Illl ll[tIIIIlf l

l IIII]

"'5 l

810508031)O (609) 693-6037 2

e '

NAME o* *aE8ARER PHCNE: