05000321/LER-1981-013-03, /03L-0:on 810228,HPCI Sys Was Declared Inoperable When Oil Line Near Rear Bearing Broke.Caused by Person Stepping on Oil Line & Turbine Vibration Finishing Separation.Line Repaired

From kanterella
(Redirected from ML20003E441)
Jump to navigation Jump to search
/03L-0:on 810228,HPCI Sys Was Declared Inoperable When Oil Line Near Rear Bearing Broke.Caused by Person Stepping on Oil Line & Turbine Vibration Finishing Separation.Line Repaired
ML20003E441
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/26/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003E439 List:
References
LER-81-013-03L, LER-81-13-3L, NUDOCS 8104030468
Download: ML20003E441 (2)


LER-1981-013, /03L-0:on 810228,HPCI Sys Was Declared Inoperable When Oil Line Near Rear Bearing Broke.Caused by Person Stepping on Oil Line & Turbine Vibration Finishing Separation.Line Repaired
Event date:
Report date:
3211981013R03 - NRC Website

text

""

LICENSEE EVENT llEPORT o@

(l coNinot olock: I I~ l l

l l

l (PLEASE PnlNT on TYPE ALL nEotnnLD INFORMATioN) v i

lG l f. j E lI lli ll l@[0 l0 l- [0 l0 l0 l6 l0 l-l0 lU@l 4 l 1l ll 1l 1l@l l

lg e i 7

e s ucENaE Cout i4 is uCtNa tuuuta a

w, uCtNsc iuc

.io si c m da ce" fs.

E $ @ l01 510'_11Ol'l?l1f@l01212 18 l8 11 l@l013l2l6l8l1 l@

7 8

00 61 DOCK E T NUV8E at 66 Fe3 EVENT OATE 14 75 HLPORT DAT E b0 EVENT oESCntPTioN ANo PROBABLE C JNSEQUENCES h O 2 l On February 28, 1981, with the reactor in the shutdown made, while 1

10131 1 performing the llPCI Ra'.ed Flow Test to prove operability, the HPCI

[

l 014 l l System was declared inoperable when an oil line near the rear bearing i

iO is1 [ bro ke.'

As the RCIC System was already in_ erable, the requirements of

[

l [Tpq l Tech Spec 3.5.E.3 were complied with.

This is not a repetitive event i

O 7 l There were no effects to public health and safety due to this evc

[

I O s I 7

8 9 DE CODE SUBCO E COMPONENT CODE SUBCOdE SU ODE 10191 l C lE l@ IE l@ IB l@ l Tl Ul R] Bl Il!'l@ W@ IZ l@

7 8

9 10 11 12 13 18 19 20 SEQUE NTI AL OCCUR R ENCE REPORT REVistON

_ EVENT YE AR REPORT NO.

LODE TYPE N O.

@ y=ggiRO18111 l-l 10!1131 l/l 10131 IL l

[-j 10l g

a

_ 21 22 23 24 26 27 23 29 30 31 32 KEl A

O O PL NT

'H HOURS S B I D

FOR1 8.

$U PL1 M ant.

CTURER [3J@lz l@

l Z l@

lZ l@

l 0 l 01 01 O l l Yl@

lNl@

lNl@

l Tl 114 l 7 l@

34 35 36 3/

40 48 42 43 44 47 33 CAUSE oESCRIPTION AND CORRECTIVE ACTIONS h it l0l l An investigation revealed that the oil line went to the oil pressure l

I li lil l qaune and had apparently been damaged previously by someone steppinq on I

i 2 l

it.

The normal vibration of the turbine then caused it to finish l

l 13 l l separating.

The line was repaired and the HPCI Rated Flow Test per-l 1iI4 I I formed satisfactorily.

I 80 1

8 9 ST 3

% POWER OTHER$TATU$

Dis O DISCOVERY DESCRIPTION W @ l 01 01 0l@ l NA l

U @l Operator Observation l

i s ACTIVITY CONTENT AMOUNT OF ACTivtTY LOCATION OF RELEASE RELE ASED@OF nELE ASELZJ@l NA l

l NA l

[ZJ 1 6 I'

nnsONNE$ expos 5AEs l 010 l 0 l@xyrE @loEsCmpriON @

NuuaEn l Zl NA l

i 7

' nnsONNEt imuns otsCnietiON@

NuvoE n li la l 1010101@l NA l

80 7

8 9 11 12

',WE s'C"^?,'l4 '^"" @

W @l NA l

60 7

48 9 to LStittPTION' ISSUED HA I

lililllillIlli ITT61LttJ81 ca ou 80 ;;

810403gq g s

a s e

R. T. Nix, Sunt. of raint.

912-367-7781

,noyg yx,,o,,nc,,ntn

--)

1 LER Ho.: 50-321/1981-013

, (\\ /~g Licensee: Georgia Power Company Facility: Edwin I. Hatch Docket No.: 50-321

Narrative

Report for LER 50-321/1981-013 On February 28, 1981, with the reactor in the shutdown mode, while performing the llPCI. Rated Flow Test to prove operability, the HPCI System was declared inoperable when an oil line near the rear bearing broke.

As the RCIC System

- was already inoperable, the requirements of Tech Spec 3.5.E.3 were complied with.

An investigation-into the cause of this incident revealed that the oil line had been damaged previously by someone stepping on the line.

The normal vibration of-the, turbine then caused the line to finish separating.

The broken oil line went to an oil -pressure gauge.

t The line was cut off, rethreaded and reconnected in the oil system.

The HPCI Rated Flow Test was then performed satisfactorily.

This was not a repetitive event nor were there any effects to public health and safety.

. Personnel were cautioned not to step on oil lines and the remaining HPCI and RCIC

. (~%, sil. lines; on both units were inspected for similiar damage. " No other problems A / were found.