/03L-0:on 810106,w/unit in Steady State Power Operation,Qa Audit Showed That Temporary Procedure Change HNP-818 Was Not Approved by Plant Manager within 14 Days of Implementation.Caused by Deletion of Requirement
ML20003B215
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/29/1981
From: Mcdaniel C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20003B209 List:
References
LER-81-004-03L, LER-81-4-3L, NUDOCS 8102100521
Download: ML20003B215 (3)


LER-1981-004, /03L-0:on 810106,w/unit in Steady State Power Operation,Qa Audit Showed That Temporary Procedure Change HNP-818 Was Not Approved by Plant Manager within 14 Days of Implementation.Caused by Deletion of Requirement
Event date:
Report date:
3211981004R03 - NRC Website

text

'

LICENSEE EVENT REPORT l

l l

l l

lh dl CONTHol ULoCK:

(PLEASE PHINT OG TYPC ALL HEQUIRED INFOHMATION)

G l A l E l I l H l 1 l@l 0 l0 l-l 0 l0 l 0 l 0 l 0 l-l0 l 0 l@l4 l1 l1 l1 l1 l@l l

l@

o 9

utt'QtECODE 14 tb ucENSL NuvutH 2 *J 2G Lict NSE TYPE JJ b1 LAI b8

's "J LL jgl0 l5 l0 l0 l0 l3 l2 l 1 l@[ 0 l 1 l 0 l 6 l 8 l 1 l@l 01 1 l 2 l 9 l 8 l 1 l@

o i 7

8 60_

61 DOCK E T NU'.*D E tt t,8 03 EVENT DATE 74 75 FtEPOlli DAT L ti0

[ VENT DESCnlPTioN AND Pno0AOLE CONSLOUENCES h l0n 1-6-81, with Unit I in steady state power operation and with Unit II l

O 2 [O ;3; l shutdown for refueling, a QA audit of the Hatch procedure program showed l

lthat itNP-818, " Temporary Procedure Change" did not fully meet Tech. Spec.

l o 4 lsection 6.8.3.C requirement'that temporary changes be documented, PRB l

0 s l reviewed and approved by Plant flanager within 14 days of implementation.

l 0 c llt only required that they be documented and PRB reviewed within 14 days.

I O 7 gQin;lThis is a non-repetitive event and posed no threat to the public.

I

' $'o'e"

'#"$c' sSe^cif5E C

C0 COMPONENT CODE SUBC dE SU E

IOloi I z Iz l@ l0 l@ iz l@ l zl zl zl zl zl zl@ LZJ@ lz i@

7 8

9 10 13 12 13 18 19 20 EEOUE NTI AL OCCURRENCE FIE FOf ti HEVISION

,,,, EVENT YE AH REPDFtT NO.

CODE TYPE N O.

@ IFR/ROl8 l1 l g

l0 l0 l 4l y

l0 l3 l lL l l __.l l0l

_3.

n n

24 2o 2r 28 2,

3a 3,

32

/ x^Et r"

!O' HOUHS 22

^^

MAN F CT RER A

O L

T B

FOR1 B.

UP [Y jg l N [g lI1 lg l z [9 l9 l9 [g VIG@LJ@

LJ@

Lzjg l 0 l 0 l 0 l l

l Z

Z JJ 34 35 3G 31 40 41_

42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h liiollThe requirement for Plant fianager' signature on procedure revision l

l request was deleted on 3-10-80.

HNP-818 " Temporary Procedure Change" l

3,

iwas revised to require the Plant lianagers' signature on the procedure l

[ revision request sheet in accordance with Tech. Spec. Section 6.8.3.C.

l i, g ; lThe SR0 changed procedures were signed by the Plant flanager.

I 7

8 9 80

$TA 5

%FOWER OTHf Ft STATUS 15 iY DISCOVE RY DESCntPTION [EJQ l 0 l 7 [ 3 jgl N/A l

lAl@l QA Audit l

i s d

cOSTENT l'

AuOuNTOrACuvnv @ l LOCATIOf(OF HELEASE @

ACuviTY

[_I*sto Or.r or AsEJglZlgl t

not N/A l

N/A l

i c rEnsONNti r xrOsuAEs OrsCmenON @

N ne i

10 lU D ln0 jgl YElg[

N/A l

7

' rensONNt t iNau' lies 9

otsCmenON@

l 0 lumin0l0lgl N/A l

N l0 9

il 12 E0 f

',n*','#cT,SJN ' ^ " " @

I.' IrI LZJOI

"/^

l o

n,

io no pi g'scm'"o" g 8102100 D nfA runuciiv NRC USE ONLY i

,,,,,i,,,,,,lj

,i 3 n,

.. a 63

80. ;;

C. L. ficDaniel pngyc.912-367-6686, ext.177_{

g

LERf:

50-321/1981-004 O,

Licensee: Georgia Power Company Facility Name:

Edwin I. Itatch Docket #:

50-321 Page 1 of 2

. flarrative Report for Ler 50-321/1981-004 Cn January 6,1981, with Unit I in steady state power operation at 73% thermal power and with Unit'II shut down for refueling, an audit of the Plant Hatch procedure program being performed by the Quality Assurance Department showed that HNP-818, "TEliPORARY PROCEDURE CHANGE", did not fully meet the requirements of Tech. Spec. Section 6.8.3.C (required that temporary change be documented, reviewed by PRB and approved by the Plant llanager within 14 days of implementation).

This is a non-repetitive event; there was no effect on public health or safety due to.this event.

The then existing revision of HNP-818 only required that a change be documented and PRB reviewed within 14 days of implementation.

The Tech. Spec. requirement was formerl the Plant Manager's (or approved alternate) y satisfied by the fact that signature was required on the procedure revision request sheet which was used to document the change o

and which was PRB' reviewed within 14 days as required by the then existing LJ revision of IINP-818.

However, on 3-10-80 the requirement for the Plant Manager's signature on the procedure revision request was deleted when revision 11 of HNP-9 " Procedure Writing and Control" was signed by the Plant Manager (PRB approved on 2-19-80).

Upon discovery of the inadequacy of HNP-818, an effort was initiated to revise the procedure such that it would satisfy Tech. Spec. Section 6.8.3.C.

This new revision was PRB approved and signed by Plant flanager on 1-8-81.

This new revision explicitly requires that the temporary changes be documented, reviewed by PRB, and signed by the Plant Manager within 14 days of implementation.

~

Further investigation revealed that there were 28 SR0 changed procedures in Document Control on 1-8-81, a total of 26 had not been signed by the Plant lianager within the 14 day requirement.

27 of the SRO changed procedures found in the initial investigation were signed by the Plant Manager on 1-8-81, the 28th SR0 changed procedure was discovered attached to a procedure containing further revisions and was signed by the Plant flanager on 1-16-81 (all had been previously PRB approved).

Units are now in full compliance with the requirements of Tech. Spec. Section 6.8.3.C., and no further reporting is required.

L,i e

f 7

i

Narrative

Report for l

LERf 50-321/1981-004 January 19, 1981 Page*2 of 2 Revision SR0 Date Approval Date PRB Plant Manager Procedure #

flumber Da_te Due Annroved Approved 1-5187 2

8-25-80 9-08-80 9-02-80 1-08-81 1-3303 7'

8-26-80 9-09-80 8-29-80 1-08-81

~

1-9102 5

9-19-80 10-03-80 9-30-80 1-08-81 1-9104 4

9-19 10-03-80 9-30-80 1-08-81 2-5205 4

9-19-80~

10-03-80 9-25-80 1-08-81 1-3606 1

9-26-80 10-10-80 10-02-80 1-16-81 2-3811 3

9-26-80 10-10-80 10-16-80 1-08-81 1-3314 6

10-02-80 10-16-80 10-09-80 1-08-81 1-3404 8

10-02-80 10-16-80 10-09-80 1-08-81 2-2221 0

10-04-80 10-18-80 10-09-80 1-08-81 2-3001 1

10-06-80 10-20-80 10-16-80 1-08-81 2-3834 3

11-04-80 11-18-80 11-11-80 1-08-81 2-3960 2

11-07-80~

11-21-80 11-11-80 1-08-81 2-5235 2

11-10-80 11-18-80

.,11-11-80 1-08-81 2-3320 4

11-11-80 11-25-80 11-80 1-08-81 2-5352 0

11-13-80 11-27-80 11-20-80 1-08-81 2-1350 3

11-14-80 11-28-80 11-20-80 1-08-81 2-6100 3

11-15-80 11-29-80 11-18-80 1-08-81 2-3177 2-11-19-80 12-03-80 11-25-80 1-08-81 2-3504 4

11-19-80 12-03-80 11-25-80 1-08-81 2-3952 2,

11-22-80 12-06-80 12-04-80 1-08-81

~'

1-5260 5

11-24-80 12-08-80 12-04-80 1-08-81 1-1920 3

12-12-80 12-26-80 12-12-80 1-08-81 2-3173 6

12-12-80 12-26-80 12-16-80 1-08-81

- 6961 1

12-19-80 01-02-81 12-23-80 1-08-81

- 8013 6

12-23-80 01-06-81 12-30-80 1-08-81 2-5205 4

12-26-80 01-09-81*

12-30-80 1-08-81 2-3003 6

12-27-80.

01-10-81*

12-30-80 1-08-81

  • Within 14 day limit t

(-V) t'