05000285/LER-1980-030-03, /03L-0:801211,diesel Generator 1 Failed to Start on Secondary Air Sys.Caused by Vanes of Air Motor Sticking & Preventing Motors from Turning.Vanes Cleaned & Motors Installed

From kanterella
(Redirected from ML19351F505)
Jump to navigation Jump to search
/03L-0:801211,diesel Generator 1 Failed to Start on Secondary Air Sys.Caused by Vanes of Air Motor Sticking & Preventing Motors from Turning.Vanes Cleaned & Motors Installed
ML19351F505
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/22/1980
From: Tesarek J
OMAHA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19351F501 List:
References
LER-80-030-03L, LER-80-30-3L, NUDOCS 8101130387
Download: ML19351F505 (4)


LER-1980-030, /03L-0:801211,diesel Generator 1 Failed to Start on Secondary Air Sys.Caused by Vanes of Air Motor Sticking & Preventing Motors from Turning.Vanes Cleaned & Motors Installed
Event date:
Report date:
2851980030R03 - NRC Website

text

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION q 77)

LICENSEE EVENT REPORT O

oNTRolBLOCK:

C l

l l

l l

l lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

lo l t i l Nl El Fl Cl Sl 1l@l 01010l 0l 0l 010l 010l 0l Ol@l 4l ll ll 1l 1l@l l

l@

7 8 9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE J0 67 4AT $8 con'T IOlil 1","C l Ll@l Ol 510l 010l 218l Sl@l 11 Pl 1111 RI nl@l 1121212l 8l Ol@

7 8

60 61 DOCKET NUV8ER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h l0 l2l l During the performance of ST-ESF-6, F.2, Appendix F, Diesel Generator #1 (DG-1) l l O i 3, I

failed 'to start on its secondary air system. DG-1 was removed from service in l

10 i.i i l accordance with Tech. Spec. 2.7(2)i and the secondary air start motors were re-I lo isi l paired. Prior to the incident, DG-1 had successfully started on its primary air l

lO is i l start system.

In addition, DG-2 was started to verify its operability.

I 10171 I I

I 10181I 80 7

8 9 DE CODE SU8C E COVPONENT CODE SUB ODE S

E l0l91 l E lE l@ LEj@ LB_j @ l E l N l G l I l N l E l@ [Z_j@ [__Zj @

7 8

9 10 11 12 13 18 19 20 SEQUE NTI AL OCCURRENCE REPORT REVISION Lg R;po EVENT Y( AR REPORT NO.

CODE TYPE NO.

@ reg l218lQl

(_.]

l013101 y

10 l 3 l l Ll l-l l Of 22 23 24 26 27 28 29 30 31 32 KN A ON ONP NT ME HOURS 22 SB si FOR B.

SUPPL R MANUFACTURER W @lZl@

l Z l@

lZl@

l0l0l0l l

W@

W@

lAl@

lSl0l6l6l@

33 J4 Ja 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h lil0ll The vanes of the air motors were stuck which prevented the motors from turnina. Thel ii 121 l vanes were cleaned, the motors were installed and DG-1 was successfully started on I 1, i 7 ; l its secondary air start system. To prevent future simil ar events, the air start I

gl motors and the air line strainers will be inspected and cleaned annually per 1

iii.i l surveillance test ST-ESF-6.

l 80 7

8 9 STA

% POWE R OTHER STATUS IS O RY DISCOVERY DESCRIPTION l El@ l 0l 7 l 5 l@l NA l

lBl@l Surveillance Test l

i s ACTIVITY CONTENT RELE ASED OF RELE ASE AVOUNT OF ACTIVITY LOCATION OF RELEASE L'_]sJ LZj @ t Zjgl NA l

l NA l

PERSONNEt ExPOsMES NUV8 E R TYPE DESCR6PTION [TTil 101010 l@lZ j@l NA l-PE RSONNE t iN;UR'iES NUV8E R CESCRIPTION l0 l0 l0 l@l NA l

i a 80 7

8 9 11 12

'#PE * "cESC n,'T ON '''@

S

^"'

l NA l

i 9 80 7

8 9 10 ISSUE @l DESCRIPTION [N_J HA l

lllllilllllllI 2 o 8kb11(Og,7 John J. Tesarek 402-426-4011

,,ggg pgoyg

LER No.80-030 Omaha Public Power District Fort Calhoun Station Unit No.1 Docket No. 05000285 ATTACHMENT N0. 1

Safety Analysis

Fort Caltuun Station Unit No.1 is designed such that a single failure cannet adversely affect the ability of the plant to be safely shutdown in the event of an accident. Although OG-1 failed to start on its secondt.ry air start system, it had previously successfully started on its primary air system.

In addition, DG-2 and both redundant offsite power supplies (161 KV and 345 KV) were available during the time that DG-1 failed to start on its secondary air system.

8

O

  • LER No.80-030 Omaha Public Power District Fort Calhoun Station Unit No, 1 Docket No. 05000285 ATTACHMENT NO. 2

Corrective Action

M.0. #8169 was initiated to repair the secondary air start motors of DG-1.

An inspection of the motors revealed that the vanes were stuck which prevented the motors from turning. The primary and secondary air start systems will be tested periodically per ST-ESF-6.

In addition, the primary and secondary air start motors and the air line s', 'ainers on the primary and secondary aid start systems will be inspected and cleaned annually per ST-ESF-6. The air line lubricators on the primary and secondary air start systems will also be inspected annually and, if necessary, they will be cleaned.

'I y

c c

e

---e an e r

- v

i 1

LER No.80-030 Omaha Public Power District Fort Calhoun Station Unit No.1 i

Docket No. 05000285 ATTACHMENT N0. 3 l

Failure Data Previous related incidents are detailed in Unusual Event 73-5, Ab-normal Occurrence 75-20 and LER 77-12.