Letter Sequence Approval |
|---|
|
Results
Other: 05000344/LER-1980-006, Forwards LER 80-006/01T-0, 05000344/LER-1980-006-01, /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap, ML19309C391, ML19323C628, ML19323C633, ML19341A169, ML19341A172, ML19341A175, ML19345F215, ML19345F217, ML19347F033, ML19347F037, ML20003D352, ML20005A518
|
MONTHYEARML19309C3911980-04-0404 April 1980 Provides Schedule for 800426-0505 Fuel Insps During Cycle 2 Refueling Outage.Insps Will Be Performed by Westinghouse & Util in Spent Fuel Pool Area.Preliminary Oral Rept Will Be Made Prior to Return to Operation Project stage: Other 05000344/LER-1980-006-01, /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap1980-05-0808 May 1980 /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap Project stage: Other 05000344/LER-1980-006, Forwards LER 80-006/01T-01980-05-0808 May 1980 Forwards LER 80-006/01T-0 Project stage: Other ML19323C6281980-05-12012 May 1980 Forwards License Change Application 61 Requesting Amend to License NPF-1 Project stage: Other ML19323C6331980-05-12012 May 1980 License Change Application 61 Requesting Amend to License NPF-1,adding License Condition Re Fuel Assemblies.Waives Requirement That Each Fuel Assembly Contain 264 Fuel Rods. Outer Zircaloy-4 Clad Fuel Rods May Be Replaced Project stage: Other ML19320C1701980-06-27027 June 1980 Forwards Amend 45 to License NPF-1,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19341A1751981-01-0707 January 1981 Requests That Util Startup & Power Escalation Testing Rept Be Withheld from Public Disclosure Per 10CFR2.790.Original Affidavit AW-76-31 Encl Project stage: Other ML19341A1691981-01-13013 January 1981 Forwards Proprietary & Nonproprietary Versions of Improved Bol,Hzp,Power Distribution Prediction, Per 801118 Request. Requests Withholding (Ref 10CFR2.790) Project stage: Other ML19341A1721981-01-13013 January 1981 Nonproprietary Version of Improved Bol,Hzp Power Distribution Prediction Project stage: Other ML19345F2151981-02-0505 February 1981 Forwards License Change Application 70,amending License NPF-1 to Waive Requirement Re Fuel Assembly Rods.Fuel Assemblies in Core Contain Three Stainless Steel Dummy Fuel Rods.W/Class III Amend Fee & Certificate of Svc Project stage: Other ML19345F2171981-02-0505 February 1981 License Change Application 70,amending License NPF-1 to Waive Tech Spec 5.3.1 Requirement Re Fuel Assembly Rods.Fuel Assemblies in Core Contain Three Stainless Steel Dummy Fuel Rods.Westinghouse Evaluation Encl Project stage: Other ML20003D3521981-03-20020 March 1981 Responds to NRC 810310 Telcon Requesting Addl Info Re License Change Application 70.Updated Table 2 Reflecting Final Cycle 4 Design Encl.Prompt Approval Requested to Avoid Impacting Spring Refueling Outage Project stage: Other ML19347F0331981-05-0808 May 1981 Amend 60 to License NPF-1,approving Use of Two Modified Fuel Assemblies Containing Three Stainless Steel Rods for Fuel Cycle 4 & One Subsequent Fuel Cycle Project stage: Other ML19347F0371981-05-0808 May 1981 Notice of Issuance & Availability of Amend 60 to License NPF-1 Project stage: Other ML19347F0361981-05-0808 May 1981 Safety Evaluation Supporting Amend 60 to License NPF-1 Project stage: Approval ML19347F0311981-05-0808 May 1981 Forwards Amend 60 to License NPF-1,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML20005A5181981-06-25025 June 1981 Forwards Preliminary Results of Insp of Fuel Assemblies Subj to cross-flow Baffle Jetting Per Paragraph 2.C(11) of License NPF-1 & FSAR Project stage: Other 1981-01-13
[Table View] |
Text
~
7ey jaA CIog
,(
k UNITED STATES y
yg NUCLEAR REGULATORY COMMISSION 3*-
E WASHINGTON, D. C. 20555 o
8
'%,,,,,, o'#
May 8, 1981 8
Docket No. 50-344 2 t,1AY 131981 > c h*)j.s. NUCitAR tiG v
42 Mr. Bart D. Withers Vice President Nuclear f
Portland General Electric Company 121 S.W. Salmon Street Portland, Oregon 97204
Dear Mr. Withers:
The Commission has issued the enclosed Amendment No. 60 to Facility Operating License No. NPF-1 for Trojan Nuclear Plant. The amendment.
consists of changes to the license in response to your application dated February 5,1981, as supplemented March 20, 1981.
The amendment approves the use of two modified fuel assemblies containing three stainless steel rods for fuel cycle 4 and one subsequent fuel cycle.
Copies of the Safety Evaluation and the Notice of Issuance are also enclosed.
Sincerely, f
n l
("
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Enclosures:
1.
Amendment No. 60 to NPF-1 2.
Safety Evaluation 3.
Notice of Issuance cc: w/ enclosures See next page i
3105150ld)
Portland General Electric Company cc: Mr. J. W. Durham, Esquire Vice President and Corporate Counsel Portland Generai Electric Company 121 S. W. Salmon Street Portland, Oregon 97204 Multnomah County Library Social Science and Science Department 801 S.W. 10th Avenue Portland, Oregon 97205 Michael' Halmros, Resident Inspector U. S. Nuclear Regu1. tory ~ Commission 4
Trojan Nuclear Plant?
P. O. Box 0 Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Commiss.ioners
~
Columbia County St. Helens, Oregon 97501 Director, Criteria and Standards Division Office of Radiation Programs ( AllR-460)
U. S. Environmental Protection Agency Washington, D. C.
20460 cc w/ enclosure (s) and incoming dated: 2/5/81,3/20/81 Donald W. Godard, Supervisor Siting and Regulation Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oegon 97310
.~
l