Other: 05000344/LER-1980-006, Forwards LER 80-006/01T-0, 05000344/LER-1980-006-01, /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap, ML19309C391, ML19323C628, ML19323C633, ML19341A169, ML19341A172, ML19341A175, ML19345F215, ML19345F217, ML19347F033, ML19347F037, ML20003D352, ML20005A518
|
MONTHYEARML19309C3911980-04-0404 April 1980 Provides Schedule for 800426-0505 Fuel Insps During Cycle 2 Refueling Outage.Insps Will Be Performed by Westinghouse & Util in Spent Fuel Pool Area.Preliminary Oral Rept Will Be Made Prior to Return to Operation Project stage: Other 05000344/LER-1980-006-01, /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap1980-05-0808 May 1980 /01T-0:on 800425,during Preplanned Fuel Insp Program,Two Fuel Assemblies Found to Have Abnormal Clad Degradation.Caused by water-jet Impingement on Fuel Pins Via Enlarged Baffle Plate Joint Gap Project stage: Other 05000344/LER-1980-006, Forwards LER 80-006/01T-01980-05-0808 May 1980 Forwards LER 80-006/01T-0 Project stage: Other ML19323C6281980-05-12012 May 1980 Forwards License Change Application 61 Requesting Amend to License NPF-1 Project stage: Other ML19323C6331980-05-12012 May 1980 License Change Application 61 Requesting Amend to License NPF-1,adding License Condition Re Fuel Assemblies.Waives Requirement That Each Fuel Assembly Contain 264 Fuel Rods. Outer Zircaloy-4 Clad Fuel Rods May Be Replaced Project stage: Other ML19320C1701980-06-27027 June 1980 Forwards Amend 45 to License NPF-1,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML19341A1751981-01-0707 January 1981 Requests That Util Startup & Power Escalation Testing Rept Be Withheld from Public Disclosure Per 10CFR2.790.Original Affidavit AW-76-31 Encl Project stage: Other ML19341A1691981-01-13013 January 1981 Forwards Proprietary & Nonproprietary Versions of Improved Bol,Hzp,Power Distribution Prediction, Per 801118 Request. Requests Withholding (Ref 10CFR2.790) Project stage: Other ML19341A1721981-01-13013 January 1981 Nonproprietary Version of Improved Bol,Hzp Power Distribution Prediction Project stage: Other ML19345F2151981-02-0505 February 1981 Forwards License Change Application 70,amending License NPF-1 to Waive Requirement Re Fuel Assembly Rods.Fuel Assemblies in Core Contain Three Stainless Steel Dummy Fuel Rods.W/Class III Amend Fee & Certificate of Svc Project stage: Other ML19345F2171981-02-0505 February 1981 License Change Application 70,amending License NPF-1 to Waive Tech Spec 5.3.1 Requirement Re Fuel Assembly Rods.Fuel Assemblies in Core Contain Three Stainless Steel Dummy Fuel Rods.Westinghouse Evaluation Encl Project stage: Other ML20003D3521981-03-20020 March 1981 Responds to NRC 810310 Telcon Requesting Addl Info Re License Change Application 70.Updated Table 2 Reflecting Final Cycle 4 Design Encl.Prompt Approval Requested to Avoid Impacting Spring Refueling Outage Project stage: Other ML19347F0331981-05-0808 May 1981 Amend 60 to License NPF-1,approving Use of Two Modified Fuel Assemblies Containing Three Stainless Steel Rods for Fuel Cycle 4 & One Subsequent Fuel Cycle Project stage: Other ML19347F0371981-05-0808 May 1981 Notice of Issuance & Availability of Amend 60 to License NPF-1 Project stage: Other ML19347F0361981-05-0808 May 1981 Safety Evaluation Supporting Amend 60 to License NPF-1 Project stage: Approval ML19347F0311981-05-0808 May 1981 Forwards Amend 60 to License NPF-1,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML20005A5181981-06-25025 June 1981 Forwards Preliminary Results of Insp of Fuel Assemblies Subj to cross-flow Baffle Jetting Per Paragraph 2.C(11) of License NPF-1 & FSAR Project stage: Other 1981-01-13
[Table View] |
Text
.--
)
{
C April 4, 1980 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reaccor Regulation ATTN:
Mr. A. Schwence, Chief Operating Reac. ors Branch (/l Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
In accordance with the commitment in the Trojan Final Safety Analysis Report (FSAR) Section 4.2.1.4.3 regarding Nuclear Fuel Inspection, the following activities are expected to take place between April 26 and 1
May 5, 1980 during the forthcoming Trojan end of Cycle 2 refueling outage:
1.
A TV visual fuel examination of five Region C, five Region D and five Region B fuel assemblies.
2.
A TV rod bow fuel examination of three Region C and j
three Region B fuel assemblies.
3.
A crud sampling examination of four Region C, two Region D and five Region B fuel assemblies.
4.
A binocular fuel. examination of at least 40 Region B or C fuel assemblies.
5.
As time permits, an optional TV visual fut 1 examina-tion of 12 or more additional Region C or 1 fuel assemblies.
i i
80040806 W
$ oft w
. - ~
i Mr. A. Schwencer April 4, 1980 i
Page 2 These fuel inspections will be performed by Westinghous e Electric Cor-poration and Portland General Electric Company personnesl at the Trojan Spent Fuel Pool area. An oral report of the preliminary results follow-i ing the inspections will be made to the NRC prior to r,ubsequent return to reactor operation. A written report of these preJiminary results will
}
be submitted within 30 days of the oral report.
Sincerely, I'l/
f L
s j
C. Goodwin, Jr.
Assistant Vice President Thermal Plant Operation and Maintenance l
CG/CAZ/4sa4B6 l