Provides Schedule for 800426-0505 Fuel Insps During Cycle 2 Refueling Outage.Insps Will Be Performed by Westinghouse & Util in Spent Fuel Pool Area.Preliminary Oral Rept Will Be Made Prior to Return to Operation
ML19309C391
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/04/1980
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-42281, NUDOCS 8004080542
Download: ML19309C391 (2)


Text

.--

)

{

C April 4, 1980 Trojan Nuclear Plant Docket 50-344 License NPF-1 Director of Nuclear Reaccor Regulation ATTN:

Mr. A. Schwence, Chief Operating Reac. ors Branch (/l Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

In accordance with the commitment in the Trojan Final Safety Analysis Report (FSAR) Section 4.2.1.4.3 regarding Nuclear Fuel Inspection, the following activities are expected to take place between April 26 and 1

May 5, 1980 during the forthcoming Trojan end of Cycle 2 refueling outage:

1.

A TV visual fuel examination of five Region C, five Region D and five Region B fuel assemblies.

2.

A TV rod bow fuel examination of three Region C and j

three Region B fuel assemblies.

3.

A crud sampling examination of four Region C, two Region D and five Region B fuel assemblies.

4.

A binocular fuel. examination of at least 40 Region B or C fuel assemblies.

5.

As time permits, an optional TV visual fut 1 examina-tion of 12 or more additional Region C or 1 fuel assemblies.

i i

80040806 W

$ oft w

. - ~

i Mr. A. Schwencer April 4, 1980 i

Page 2 These fuel inspections will be performed by Westinghous e Electric Cor-poration and Portland General Electric Company personnesl at the Trojan Spent Fuel Pool area. An oral report of the preliminary results follow-i ing the inspections will be made to the NRC prior to r,ubsequent return to reactor operation. A written report of these preJiminary results will

}

be submitted within 30 days of the oral report.

Sincerely, I'l/

f L

s j

C. Goodwin, Jr.

Assistant Vice President Thermal Plant Operation and Maintenance l

CG/CAZ/4sa4B6 l