LER 80-013/01T-0:on 801113,suction to 1P4B Boric Acid Transfer Pump Isolated,Rendering Pump Inoperable.Probably Caused by Personnel Error in Returning Valve Lineup to Normal Following Recirculation & Sampling
ML19345B476
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 11/21/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19345B469 List:
References
LER-80-013-01T, LER-80-13-1T, NUDOCS 8012010372
Download: ML19345B476 (3)


Text

_ _ _ . - -- . - . .

NRC FCM 364 U. 5. NUCLE A2 EE!ULATC%Y COMMISSION (7-77)

. LICENSEE EVENT REPORT CON TROL BLOCK: l l

l l l l l 6lh (PLEASE PRINT OR TYPE ALL REQutREO INFORMATIONI o 1 t 8 l9 W LICENSEE l I l PCODE l B l H l 1 l@150 l 0 14 l- l0 LICENSE l 0l 0 l0 l 0 25l -l 0 l 0LICENSE NUM8ER 26 l@4TYPE l 1lJO 1l1l1 l

SI LAT l@l l@

68 CON'T R 8

.$n$ l60L l@lGl0 l 5 l0DOCK l 0ETl0 l 2 l 6 l6 l@l69 1 l1EVENT l ll 3l 8 l 0 ]@l1 l 1 PEPORT 74 l 2 l D1ATEl 8 l 080l@

F NUMBER NB DATE 7S

' EVENT DESCRIPTION AND PROB A8LE CONSEQUENCES h fiTTTI l At about 1300 on 11-13-80 with both units operating it was discovered l F6TO I that the suction to the 1P4B boric acid transfer pump was isolated, thusl 1 o 14 l l making the pump inoperable. The pump was probably isolated after BA l

[TTA l tank recirculation per T.S. sampling at about 1230 on 11-10-80. The I j

io is l l 2P4A pump was also out-of-service for a portion of this time period for l g l maintenance. Having both pumps inoperable is a violation of LCO l

. ioisil 15.3.2.D.2 and reportable per 15.6.9.2.A.2; no similar events. l 7 8 9 80 DE CODE SUBC DE COMPONENT CODE SUS COD'E SU E 7

O 9 8

l Cl Gl@ y@ W@ l P l Ul Ml Pl Xl X l@ [Bj@ W @

9 10 ft 12 13 18 09 20 SE QUENTI AL OCCURRENCE REPORT REVISION

,EVENTYEAR REPORT NO. COOF TvPE N O.

@ g({q gg l8l0l 25 22 l_._j 2J l0 l1l 3 l 24 16 y l0l1l l Tl 8 @

27 28 29 Ju 31 J2 TAKEN AC O ON PLANT ME HOURS S8 if POR 1 9. SUPPLt MANUPACTURER Lx_J@Lo.J@ l36z l@ Lz_J@ l0IoIoIoi IJ_J@ LN_j@ [N_j@ lCi3l0l0l@

JJ 34 36 31 40 41 42 43 44 47 CAUSE DESCRIPTION AND COFiRECTIVE ACTIONS h

[TTTI I The isolation of the pump probably occurred due to personnel error in I i i l returning the valve lineup to normai following recirculation and I r; r q l sampling. Following discovery, the valve lineup was returned to I g l normal, verified by the Duty Shift Supervisor and a pump operability l i 4 l test was performed. A checklist procedure is being prepared. I 7 8 s SO STA' S  % POWE R OTHER STATUS 01 RY DISCOVERY DESCRIPTION

[i_{_j [E_J@ l 0 l 8 l 0 l@l N/A l [A_J@l Operator observation l A Tiviiv CO TENT RELEASED OP RELE ASE AMOUNT OF ACTivlTY LOCATION OP RELEASE W LzJ l N/A

  • * @ W@l N/A l l PERSONNEL ExPOSU ES NuMsER TvPE oESCRiPTiON @

i 2 l 0 l 0 l 0 l@l Z l@[ N/A .

l PERSONNE L INJU IES NUMSER oESCRiPTiON@

7 1 a 8 9 l010l0l@lN/A 11 12 OO I

  • ' " ^ ' '

$*PE E$C7*PTION * " @

g [Z_J@l 8 9 N/A l 7 to 80 2 o 8 9 d l N/A ISSUE @ DESCRIPTION 80120 i n374il i 68 69 i i i i i i iiiiiiri 7 to 80 3 NA**E OF Pl4EPARER *

  • OY PHONE: 414/2~I7~2811

e s

ATTACHMENT TO LICENSEE EVENT REPORT NO. 80-013/OlT-0 Wisconsin Electric Power Company Point Beach Nuclear Plant Unit 1 Docket No. 50-266 At approximately 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on November 13, 1980 it was discovered that the suction to the IP4B boric acid transfer pump was isolated, thus rendering the pump inoperable. The isolation of the pump probably occurred due to personnel error in returning the valve lineup to normal following recirculation of the "B" concentrated boric acid tank for Technical Specification sampling on November 10 at approximately 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />. For a portion of the postulated time that the IP4B pump was inoperable, the 2P4A pump was out-of-service for maintenance. The 2P4A pump was returned to service at 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on November 11. During the time period of 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br /> on November 10 and 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on November 11 both units were operating with two out of four boric acid transfer pumps out-of-service. This mode of operation is allowed by Technical Specification 15.3.2.D.2 for a 24-hour period. However, since the two pumps were out-of-service (one unknowingly) for a period of time that_can only be-estimated, this event is considered a vioation of the limiting condition of operation contained in 15.3.2.D.2 of the Technical Specifications.

4. The pump was returned to service immediately upon discovery by correction of the valve lineup by the auxiliary operator. The correct system lineup was verified by the duty shift supervisor.

Operability of the pump was also verified.

At all times each unit had two sources of borated water available for injection through three paths. The charging pumps had concentrated boric acid available through the remaining two boric acid transfer pumps and refueling water (>2000 ppm boron) from their direct suction. The safety injection pumps which take

their suction directly from the boric acid storage tanks or'the refueling water storage tank were also available.

The boric acid transfer pumps are not part of an automatic system used to mitigate the consequences of an accident. Manual action is required to inject high concentration boron via the boric acid transfer pumps and charging pumps. Automatic injection of high concentration boron is accomplished by the safety injection pumps which take their suction directly from the boric acid storage tank. The capability of automatic injection of high concentration boron was not impaired by the shut valve in the suction of the transfer pumps.

e The Technical Specification requires that the boric acid storage tanks be sampled twice a week. Although the valve lineup for this operation is simple, to prevent a future occurrence of this event a checklist for valve operation is being prepared to verify proper valve lineup following sampling of the boric acid storage tanks.

The resident inspector was notified on November 13.

This event is reportable in accordance with Technical Specification 15,5.9.2.A.2 and is the first occurrence.

.