NUREG-0485 Vol. 3, No. 3 February 1,1981 SYSTEMATIC EVALUATION PROGRAM STATUS
SUMMARY
REPORT UNITED STATES NUCLEAR REGULATORY COMMISSION N:
1-/Fff
{
1
-(G, J,
tC 1 \\\\-?*
s...../
z = a = __R_.
;=
u fear Reactor Regulation Off ce of u ear Reactor Regulation ff ce f
$/03 /90 7 3 ~/
l TABLE OF CONTENTS I
I 1
l SECTION I SECTION 11 4
i BIG ROCK POINT 2-2 to 2-5 SEP TOPIC LIST 1-2 to 1-3 DRESDEN 1 2-6 to 2-9 DRESDEN 2 2-10 to 2-13 4
i DESIGN BAS.S EVENT GROUP DESCRIPTION 1-4 GINNA 2-14 to 2-17 j
HADDAM NECK 2-18 to 2-21 l
{
DEFINITIONS OF STATUS 1-5 LACROSSE 2-22 to 2-25 l
MILLSTONE 1 2-26 to 2-29 I
SEP TOPIC
SUMMARY
STATUS REPORT 1-6 OYSTER CREEK 2-30 to 2-33 4
l PALISADES 2-34 to 2-37 i
l lNTEGR ATED ASSESSMENT SCHEDULE 1-7 SAN ONOFRE 2-38 to 2-41
)
)
YANKEE ROWE 2-42 to 2-45
\\
i 1
i l
l l
4
m-
--.-.--u
-w l
l Z
O O
1.u
&)
l l
e-erM---e
SYSTEMATIC EVALUAYlON PROGRAM TOPIC LIST TOPIC f TifLE TOPIC f Tlftf TDPtC #
T I TL E Il-1 A. E EClusion Area Authority and Cont rol 111 4 A* T8'"id0 "'55 8 3'5 Design and Protectton Against 5tngle Fatlures It. Population Distr wt'on IV-3 8m Jet Pugs Operating Indications C. Potenttal Hazards or Changes in Potential
- 8. Turbine taissties Hazards Due to Transpt.etation, las t it u t iona l V.1 Cogitance with Codes and Standards (10 CFR In&strial, and Military f actittles 111 4 C. Internally Generated Missiles 50.55a )
11 2 A. Severe Weather Phenomena V-2 App 1tcable Code Cases
- 8. Onsite Meteorological Measurenents Program V-3 Overpressurtaat.on Protection C. Atmospherte Transport and Dif fusion Charac.
V-4 Ptptng and Saf e End integrity teristics f or Accident Analysis D. $tte Proximity Misstles (including Aircraf t) p D.
Availability of Meteorological Data in the
!!!-5 A. Ef fects of Pipe Break on Structures. Systens L**k 89'e Detection Control Room and Cogonents Instde Containnent g
g
!!.3 A. Hydrologic Descrtptica
- 8. Pipe Break Outside Containwnt
,,7 p
I
- 8. Flooding Potential and Protectton Require.
V-8 Steam Generator (SG) Integrity ments 111-7 A. Inservice Inspection. Including Prestressed V-9 Reactor Core Isolation Cooling System (BWR) 1.
Capabiltty of Operat tag Plant to Cope Concrete Containnents with E tther Grouted with Des tgn lat is F looding Condit to"s or Ungrouted Tendons V-10 A. RHR Heat ERChanger Tube Failures C. Safety-related Water Supply bittmate Heat
- 8. Design Codes. Destgn Criterta, toad
- 8. RHR Reltability Sink (UH5))
Coneinations, and Reactor Cavity Design Criteria II.4 Geolog and Seismology Pressure Systems C. Delamination of Prestres* ed Concrete Con-A. Tectonic Province tatement Structures
- 8. RHR Interlock Requirements
- 8. Prostetty of Capable Tectonte Structures D. Containcent Structural Integrity Tests V*II A
ter P t of Solling Water Reactor in Plant Vicinity p
111 8 A. Loose Parts Monitoring and Core Barrel C. Historical SeismlCity within 200 Miles of Plant Vtbrat ton Monttoring 3
Wow Hamer
- 8. Control Rod Ort we Mechanism Integrity VI-1 Organic Materials and Post Acctdent C heat st ry D. Stability of Slopes C. teradiation Damage. Use of Senstttred Stonpless Steel and F atigue Reststance II*2 A. Pressure-Suppression Type BWR Containments E. Dam Integrity
- 8. Subcogartment Analysts D. Core Supports and f uel lategrity F. Settleaent of Foundet tons and Burted C. Ice Condenser Containnent Equipment 111-9 Support Integrity D. Mass and Energ Release for Possible Pipe
!!!.10 A. Thermal-Overload Protection for Motors of 8reak inside Containment
!!I-I Classtf tcation of Structures. Cogonents and Motor-operated Walves Systems (Se.smic and Quality)
- 8. Pug Flywheel Integrity v13 Containment Pressure and Heat Reseval Ill-2 Wind and Tornado Loadtnys capability 111-3 A. Effects of High Water Level on Structures tion Pugs and Otscharge Valves VI-4 Conteinnent Isolation System Ill-11 Cogonent Integrity V I-5 Coseustible Gas Control
- 8. Structural and Other Consequences (e.g.
I luoding of SafetyJelated E quipment in W I-6 Containent Leak Testing Bewents) of f ailure of Underdrain Systens ill-12 Enustonnental Qualification of Safety Related I quipment C. Inservice Inspection of Water Control 5truc.
IV-1 A. Operatton with Less Than All Loops In-Servtce tures 1-2
SYSTEMATIC EVALUATION PROGRA,M TOPIC LIST TOPIC #
E Topic #
TITLL topic #
TITLE V I. F. A
- 1. ECC5 Re-evaluation to Account for increased VII.5 Instruments f or Monitoring Radiation and Process sv.5 Loss of Normal Fee &ater Flow Wessel Head f eaterature Vartables During Acctdents IV.6 Fee &ater System Pipe Breaas instde and Outstde
- 2. Upper Plenum inpction VII.6 Frequency Decay Containmeet (PWR) 3, ECCS Actuetton System Vll.T Acceptability of swing Bus Design on BwR-4 nV.7 Reactor Coolant Pug Rotor Seizure and Plants Reactor Coolant Pug Shaf t Break
- 4. Core Spray Norrie E t f ectiveness v ill.1 A. Pctential Equipment Fatlures Associated with 11-8 Control Rod Mtsoperation (System Malfunct ton V I. 7.B (5F Switchover f rom injectton to Rectreutation a Degraded Grid voltage or Operator Error)
Mode (Automattc (CC5 Realt9narnt)
Will-2 Dnstte Emergency Powsr Systems. Diesel IV-9 Startup or an inactive loop or Rectrcalation v !- T.C FCCS 5tngle Fat ture Criterion and Require-Generator Loop at an incorrect Tegerature, and Flow ments f or Locking Out Power to Valves Controller Malfunct ton Caustag an increase in including Independence of leterlocks on Vill-3 A. 5tation Battery Capacity Test Require.nents Be Core F low Rate AV-10 Cheatcal and Voluae Control System Malfunction
- 8. t'C Peer System Bus Voltage Monitoring and
- 1. Appendia K. E lectrical Instrumentation Annu nciat ion that Results in a Decrease in the Boron Concen-and Control (llc) Re-reviews tration in the Reactor Coolant (Ptet)
Vllt.4
[lectrical Penetrations of Reactor Contatnnent
- 2. Failure Mode Analysis - ECC5 IV.11 Inadvertent Loading and Operation of a Fuel 11-1 Fuel Storige Assently in an Igroper Position 3 The Effect of Pd loop Isolation Valve Closure During a LOCA on ELC5 Perf ormance a v.12 5pectrum of Rod EJectton Accidents (Pndt) 11 2 Overhead Handling Systems - Cranes V I-1.0 Long Term Cooling - Passive F a61ures (e.g..
IV.13 Spectrum of Rod Drop Accidents (BWR)
Flooding of Redundant Cogonents) 1A-3 Station service and Cooling Water systems n
0 W i-7.C FCC5 Sum Design and Test for Rectrculation 11 4 Boron Addition System y,
gon r 5s f nct on h 11-5 Ventt14tton Systems increases Reactor Coolant Inventory V I. T.F Accumulator Isolation Valves Power and Control System Deste 11 6 Fire Protectio't IV 15 Inadvertent Opentng of a Ptst Pressurtier Safety.
Relief Valve or a BWR Safety / Relief Valve VI.8 Control Room Habitabiltty 1
Austitary Fee &ater System IV-16 Radiological Consequences of Failure of Small V I-g Main Steam Line Isolation Seal System - Bw 11-1 Appendia !
Lines Carrying Primary Coolant Outstde Contatn-
,,ng VI-10 A. Testing of Reactor Trip System and Engineered XI-2 Radiological (Effluent and Pr, cess) Monitoring XV.17 Steam Generator Saf ety Features including desponse Tine Systems f esting Tube Failure (PWR) 1111-1 Conduct of Operations IV 18 tediological Consequences of Main Steam B. Shared Engineered Saf ety Features. On-site L 'ne Failure Outside Containment (82)
[mergency Power. and Service Systems for till-2 saf eguards/In&strial Security Multiple unit Facilittes IV.lg Loss-of Coolant Accidents Resulting f rom I V-1 Vll.1 A. Isolation of Reactor PKtection System f rom Decrease in Feedwater Tegerature. Increase in Spectrum of Postulated Piping Breaks Within F ee&at er F inw. Increase in Steam Flow and the Reactor Coolant Pressa Boundary Non-Safety Systems. Including Qualtitcations of Isolation Devices inadvertent Opening of a 5 team Generator kelief or safety valve IV-20 Radiological Consequences of Fuel Damagtag 4cct4ents ginside and Outside Containment)
P. Trip Uncertataty and Setpoint Analysts Reutew xv.2 Spectrum of Steam System Piping Fatlures inside of Lperating Data Base and Outside of Contatnnent (PWW)
X V-21 Spent Fuel Cask Drop Accidents VII-2
[ngineered Saf ety Features (E5F ) System Control XV-3 Loss of [ aternal Load. Turbin& Trip. Loss of XV-22 Anticipate Transtents Without Scram Logic and Dest %n Condenser Vacuum. Closure of mte Steam 15014' IV.23 Multiple Tube Fativres in Steam Generators VII.3 Systens Required f or Saf e Shutdown t non Valve (Bd). and Steam Pressure Replator Fat ture (closed)
XV.24 Loss of All A-C Pwer VII 4 if fects of Fatlure in Non-Saf ety Related yf
-taergency 4-C Power to the Station IVI Technical Specifications Systems on Selected Engineered safety Features XVl!
Operattonal QA Program 1-3
DESIGN BASIS EVENT REVIEWS i
I THIS SECTION DEFINES DESIGN BASIS EVENT (DBE) REVIEWS FOR THE ELEVEN SEP FACILITIES i
Pb8 DBE T0ric LIST twR DBE TOP!: LIST gwg 4 pwe Det TOPIC LIST Accidea.1_.and Transient Groups Accident _and Transient Grey.n
[
DBE TOPIC Tj_T]d LEE TOPIC TITi t j
DBE Yt8!C fl_Tg t
Group I Ib1 De.rease te feedwater temperature F L OOD5 4
Group I IW 1 Decrease in feedwater tarperature is.n1_
n y-1 Increase in feedwater flow F L OO95- ~ - - -
11-3. A Hydrologic description 4
LPwU IV 1 increase in feedneter flow Iv-1 lacrease in steam fla.
II-3.8 Flooding potential and protection sv-l lacrease te steer flow ab9 Start up of inactive loop and flow requirements (capability of operating 1
RV-1 Inadvertent opening of steam controller malfunction plant to cope witn design beats flooding
{
genervor reisef/ safety valve s v-3 Inadvertent closure of main steam condi tion) 58-9 Start-up of inactive loop tsolation value
!!-3.C Safety related water supply (ul tima te Ib 13 Syster malfu ction causing heat sink) n i
grouM]
Ib3 Lc s of enternal load j
Gr&!!
a d-3 Loss of enternal load av-3 Turbine trip SE !5PIC ll-4. A Tectonic province 38-3 Turbine trip I V-3 Loss of condenser vacue
' ' " ~
!! 4.8 Proataity of capable tectonic structures 3V-3 Loss of condenser vacuum au-3 Steam pressure regulator f ailure near plant 18-3 Ster pressure regulator f ailure sv-5 Loss of feedwater flow Il-4,C Historical seismicity atthin 200 miles 3 d-5 Loss of feedwater flow of plant j
I v -6 Fee 3=ater syster pipe breat Group !!!
Xt-18 Radiological Consequences of a 11-4.0 5tability of slopes
%1n Ster Line f ailure Dutside l
GroyG1 RW-2 Ster Itne break inside containment Containment P:55tt GEleEEATION I!!-4. A Tornado missiles i
IV-2 Ster tir.e break outside containment AND PROTECTION
!!!-4 8 Turbine missiles i
GrouG uv-4 Loss of AC power to station
- - - - - n g-4.C Internally generated missiles 1
Grod!
Ib4 Loss of AC power to station availiertes
!!!-a.D site pron tetty missiles (including 4
au t lier tes Id-24 Loss of all AC power aircraf t) j E W-24 Loss of all AC power
(
Group V IV-7 Less of forced coolant flo" W!ND5
!!!-2 Igind and tornado loading j
Gro_d Ib7 Loss of forced coolant flow Ev.7 Prmary pu p rotor seizure m
Xb7 Primary pep rotor seizure 34-7 Primary pu p shaf t break m
j Ib 7 Primary pu p shaf t break m
t Gro up_V I~~
Xb8 Uncontrolled rod assently witherawal i
GrC.dS 36-8 Uncontrolled rod assembly wite-at power 3
drawal at power Xb6 Uncontrolled rcd assembly withdrawal
}
Ib-S U%ontrolled rod assembly with-low power start-up drawal low power start-up I V-8 Control rod sisoperation j
Ib8 Control rod sisoperation XV-13 Spectre of rod drop accidents Rb12 Spectrum of rod ejection accidents j
5pectr m of loss of coolant accidents Gr.oup..Vil XV-19 u
9r04.111 Xbl9 Spectrum of loss of coolant accidents 4
I Group vi!!
s b21 Drop of cash or heavy equipment G_r_Np V!!!
Rv-21 Drop of cash or heavy equf oment s v-N Radiological Consequences of Fuel f
t v-23 Rastological Consequemes of Fuel Damaging Accidents (taside and i
Damagtng Accidents (inside and cuiside contrinnent) i outside containment)
Group th X v-li Inadvertent opening of BWR saf ety/
j GrWp,l t Ibl5 Inadvertent opening of pwa
-~ --
rettef valve pressurizer relie' valve f
Group X 2 t-14 Inadeertent operetton of ECCS Groo n u-14 Inadvertent operation of Ects or CvC5 malfu ction tnat canes an Groe sv-11 Inadvertent loadtag and operation of j
n tacrease in coolant inventory a fuel assembly in an improper posit ton GrC4. I_I.
hot ADD 11 Cable to PuEs Group ~X I I~~
Not applicable to BhRs Gr%p Ill I,-1?
5ter Generator Tube Fallure
~
l 1-4
}
i l
STATUS DEFINITIONS G - Generic 3 - Question Response Received by N RC These topics are being evaluated as part of on-going NRC generic review effort. Some of the The licensee has formally responded to the informa-generic topics will be resolved and implemented tion request issued by N RC regarding the topic.
independently of SEP activities, i.e., Unresolved Safety Issues (NUREG-0649), TMI Action Plan issces (NUREG 0660). However, for the plants 4 - Draft SE Received which are part of the SEP ef fort, the ongoin9 From Review Branch generic review and the SEP topic review will be closely integrated to improve the effectiveness This status is used for internal NRC tracking of and efficiency of these efforts and to minimize topic review progress. The status indicates that any impact on licensees. The status and conclu-a draf t topic safety evaluation is under mange-sions of generic SEP topics will be incorporated ment review.
in the final safety assessment for each plant.
5 - Draf t SE Sent to X - Deleted Utility These topics have been verified as not applicable A draft topic safety evaluation has been formally to the design of a specific plant.
transmitted to the licensee for their review and certification of the accuracy of the described f acility. Licensees may comment upon NRC 0 - Topic Not Started conclusions or propose alternatives to NRC posi-tions.
This status indicates that the review of the topic has not started.
6 - SE Response Received by NRC 1 - Questions Received From Review Branch The draf t SE has been reviewed and licensee comments if any have been formally transmitted This status is used for internal NRC tracking to the N RC.
of topic review progress. The status indicates that all information necessary to perform a topic evaluation is not available and that ques-7 - Topic Complete tions are being developed to be sent to the licensee.
The NRC topic, evaluation has been completed and a final safety evaluation issued. A topic is completed in several ways: (1) The licensee has responded 2 - Questions Sent to that the NRC draft safety evaluation (i.e. status 5)
Utility is correct, or (2) the licensees comments on the NRC draf t safety evaluation (i.e. status 6) have been re-The questions developed in the previous status viewed and if appropriate incorporated into the have been formally transmitted to the licensee final safety evaluation, or (3) the licensee has not as a request for additional information.
responded in the time requested, thus concurring that the draf t safety evaluation is correct.
15
SEP TOPlc STATUS
SUMMARY
REPORT i
MMM M
m DRAFT SE OUESTIONS GENERIC DELETED TOPIC NOT RECEIVED QUESTIONS QUESTION BECEf VED (G)
(X)
STARTED FROM SENT TO
RESPONSE
FROM DRAFT SE SE TOPIC R ESPONSE RE f ITY RE EIVED LETE PLANT NAME (0)
C
(
- g PALISADES 33 21 2
1 8
14 18 13 2
25 GINNA 33 20 27 2
1 14 2
12 12 14 i
DRESDEN 2 32 26 30 2
8 15 1
10 5
8 OYSTER CREEK 29 31 31 8
6 9
4 5
9 14 MILLSTONE 1 31 28 34 5
9 7
2 11 4
6
)
SAN ONOFRE 31 23 26 4
6 21 3
5 4
34 i
i BIG ROCK POINT 30 30 30 2
7 15 2
5 6
10 l
HADDAM NECK 32 21 40 1
5 16 0
5 5
12 i
l YANKEE ROWE 32 21 37 2
7 14 3
9 1
11 l
i l
LACROSSE 27 32 40 1
9 8
2 12 1
5 l
f DRESDEN 1 29 31 36 4
8 8
1 7
5 8
TOTALS This Month 339 284 333 32 74 141 38 i
TOTALS Last Month 94 45 121 340 285 341 26 94 160 56 48 36 121
\\
m mmM M
M-
{
1-6
i INTEGRATED ASSESSMENT SCHEDULE M
M I
Topic Overall _/
3 Draft lA Draft 60% Topic 80% Topic Completion Status Plant Name Internal SE R Remarb As Of 01/01/81 Completion Completion Distribution Il issue ii l
73 PALISADES 3/31/81 6/30/81 8/31/81 10/31/81
)
l 51 GINNA 6/30/81 7/31/81 9/30/81 11/30/81 This schedule reflects the 39 DRESDEN 2 6/30/81 8/31/81 10/31/81 12/31/82 l
direction of the program 39 OYSTER CREEK 6/30/81 9/30/81 11/30/81 1/31/82 which was provided in a j
36 MILLSTONE 6/30/81 10/31/81 12/31/81 2/28/82 letter dated January 14, 1981 from D. Eisenhut 43 SAN ONOFRE 6/30/81 12/31/81 2/28/82 4/30/82 to all SEP licensees.
T BIG ROCK POINT 6/30/81 1/31/82 3/31/82 5/31/82 34 HADDAM NECK 6/30/81 2/28/82 4/30/82 6/30/82 36 YANKEE ROWE 6/30/81 4/30/82 6/30/82 8/31/82 l
32 LACROSSE 6/30/81 5/31/82 7/31/82 9/30/82 l
35 DRESDEN 1 2/
Deferred Deferred Deferred Deferred
._M M
M MM ll includes rompletion of all topics and the draft integrated assessment.
8 The licensee has proposed deferring SEP review of Dresden 1. The j
facility is currently shutdown and will not restart until 1986.
Status Weighting Factor 3/ The plant topic overall completion status (percent complete) is calculated G, X Not included based upon the number of topic reviews to be performed (not including l
generic or deleted topics) and a weighted average of current topic review 0
0%
j status. The calculation is performed using the following formula:
1,2,3 35%
4 80 %
Sum of Topics in Status X Weighting Factor of Status 5, 6 90%
(Percent Complete) =
7 100%
Sum of Topics 17
--..m f
I e
l l
O 1
O Lu M
i BIG ROCK POINT FACILITY INFORMATION TOPm NO.
S W US m uS j
FACILITY: BIG ROCK POINT 1 Il-1 A.
7 CPCo to NRC 09/02/80 i
LICENSEE: CONSUMERS POWER j
11 1 B.
7 CPCo to NRC 09/02/80 l
REGION / LOCATION: 4 MILES NORTH EAST OF CHARLEVOIS. MICH.
H-1 C.
7 CPCo to NRC 09/02/80 DOCKET NO.: 05000155 POWER CAPACITY: 0240(THERMAL) 067(ELECTRICAL) 18-2 A.
G CPCo to NRC 01/23/81 OL NUMBER: DPR-6 11-2 B.
G NRC to CPCo 09/26/80 N.S.S.S.: GE.
A/E FIRM: BECH.
112 D.
G NRC to CPCo 09/26/80 KEY PERSONNEL _
SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL OPERATING REACTORS BRANCH CHIEF: D. CRUTCH FIE LD ll-3 B.
3 Site Visit 07/16/79 OPERATING REACTORS PROJECT MANAGER: W. PAU LSON 33 3 B.1.
3 Site Visit 07/16/79 l
Il 3 C.
3 NRC to CPCo 08/04/80 KEY FOR STATUS CODES H-4 5
NUREG/CR-1582 08/80 11-4 A.
5 NUREG/CR-1582 08/80 G - GENERIC 3 - QUESTION RESPONSE j
RECEIVED RY NRC 114 B.
5 NUREG/CR 1582 08/80 l
X - DELETED 4 - DR AFT SE RECEIVFD H
C.
5 NUREG/CR-1582 08/80 0 - topic NOT FROM REVIEW RRANCll l
2 NRC to CPCo 11/16/79 l
5 - DRAFT SE SENT 10 I
1 - OUESTIONS RECElVED UTILITY FROM REVIEW RRANCH Me Msit 07/1909 6 - SE RESPONSE RECEIVED 11 2
2 - OUESTIONS SENT TO RY NRC UTILITY Il 1(Med) 7 - TOPIC COMPLETE 5(Elec)
NRC to CPCo 10/29/80 j
11.- 2 3
CPCo to NRC 08/08/80 l
2-2 l
1 BIG ROCK POINT h
TOPIC NO.
STAT US RFMARKS TOPIC NO.
STATUS REMARKS I
til3 A.
3 CPCo to NRC 08/09/80 11110 B.
X NRC to CPCo 11/16/79 j
l j
111-3 B.
X NRC to CPCo 12/26/80 11110 C.
X NRC to CPCo 11/16/79 l
1 f
1113 C.
0 11111 3
J 1114 A.
0 31112 3
CPCo to NRC 10/31/80 1114 B-0 IV 1 A.
7 NRC to CPCo 10/09/79 1814 C.
O gy.2 2
NRC to CPCo 12/15/80 1114 D.
0 ly.3 X
NRC to CPCo 11/16/79 l
1115 A.
3 v.)
G NRC to CPCo 11/16/79 1
1115 B.
2 NRC to CPCo 01/04/80 V2 X
NRC to CPCo 11/16/79 Ill-6 2
NRC to CPCo 08/04/80 V3 G
NRC to CPCo 11/16/79 l
til-7 A-X NRC to CPCo 11/16/79 V4 G
NRC to CPCo 11/16/79 e
i i
Ill 7 B.
3 CPCo to NRC 08/08/80 V-5 4
1117 C.
X NRC to CPCo 11/16/79 V-6 7
NRC to CPCo 03/05/80 til 7 D.
3 NRC to CPCo 08/09/79 V-7 X
NRC to CPCo 11/16/79 l
l 111-8 A.
G NRC to CPCo 11/16/79 V-8 X
NRC to CPCo 11/16/79 Ill-8 B.
X NRC to CPCo 09/26/80 V-9 X
NRC to CPCo 11/16/79 111-8 C.
7 NRC to CPCo 02/05/80 V-10 A.
7 NRC to CPCo 10/09/79 111-8 D*
G NRC to CPCo 11/16/19 V.10 B.
4(Sys) i 111-9 G
NRC to CPCo 11/16/79 V 11 A.
7(Elec)
NRC to CPCo 07/03/80 0(Sys) 111-10 A.
6 CPCo to NRC 09/24/80 V-11 B.
4(Sys)
]
6(Elec)
CPCo to NRC 09/24/80 l
l BIG ROCK POINT TOPIC NO.
STATUS REMARKS topic NO.
STATUS IIEM AH KS V 12 A.
7 NRC to CPCo 10/09/7d VI 7 D.
G NRC to CPCo 11/16/79 f
V 13 G
NRC to CPCo 11/16/79 VI 7 E.
G NRC to CPCo 11/16/79 VI1 3
CPCo to NRC 07/12/79 VI 7 F.
X NRC to CPCo 11/16/79 I
VI-2 A.
X NRC to CPCo 11/16/79 VI 8 G
NRC to CPCo 09/26/80 VI 2 B.
G NRC to CPCo 11/16/79 VI-9 X
NRC to CPCo 11/16/79 l
l VI 2 C.
X NRC to CPCo 11/16/79 VI-10 A.
O 1
l VI-2 D.
3 CPCo to NRC 04/02/80 VI-10 B.
X NRC to CPCo 11/16/79 l
VI-3 3
CPCo to NRC 04/02/80 Vll1 A.
O V14 0(Sys)
Vil1 B.
G NRC to CPCo 11/16/79 f
2(Elec)
N RC to CPCo 12/02/80 l
VI-5 0(Sys)
Vll-2 0
0(Elec)
Vl4 G
NRC to CPCo 11/16/79 Vll-3 4(Sys) 5(Elec) NRC to CPCo 10/29/80 VI 7 A.1.
X NRC to CPCo 11/16/79 Vil4 G
NRC to CPCo 11/16/79 VI 7 A. 2.
X NRC to CPCo 11/16/79 Vil-5 G
NRC to CPCo 11/16/79 j
i VI-7 A. 3.
O Vil4 G
NRC to CPCo 11/16/19 i
VI-7 A. 4.
G NRC to CPCo 11/16/79 Vil 7 X
NRC to CPCo 11/16/79 1
VI 7 B.
O Vill 1 A.
G NRC to CPCo 11/16/79 i
VI-7 C.
O Vill-2 6
CPCo to NRC 09/24/80 VI-7 C.1.
6 CPCo to NRC 09/24/80 Vill 3 A.
7 4
VI-7 C. 2.
O Vill 3 B.
6 CPCo to NRC 09/24/80 VI 7 C. 3.
X NRC to CPCo 11/16/79 Vill 4 6
CPCo to NRC 09/24/80 24 i
4
i l
}
BIG ROCK POINT i
i topic NO.
STATUS HEMAHKS TOPIC NO.
STATUS REMARKS j
IX-1 2
NRC to CPCo 11/27/79 XV 10 X
NRC to CPCo 11/16/79 l
D' /
G NRC to CPCo 11/1609 XV-11 0
IX 3 2
XV 12 X
NRC to CPCo 11/16/79 IX4 X
NRC to CPCo 11/1609 XV 13 0(Sys)
O(Doses) j IX 5 0
XV 14 0
6 i
l IX-6 G
NRC to CPCo 11/16/79 XV 15 0
X X
NRC to CPCo 11/16/79 XV-16 0
}
XI1 G
NRC to CPCo 11/16/79 XV-17 X
NRC to CPCo 11/16/79 XI-2 G
NRC to CPCo 11/1609 XV-18 O(Sys)
O(Doses)
Xill-1 G
NRC to CPCo 11/1609 XV 19 0(Sys)
O(Doses)
Xill-2 G
NRC to CPCo 11/16/79 XV 20 0
1 XV1 0
XV 21 G
NRC to CPCo 11/1699 XV-2 X
NRC to CPCo 11/16T9 XV-22 G
NRC to CPCo 11/1609 XVJ 0
XV 23 X
NRC to CPCo 11/16/79 I
i XV4 0
XV-24 G
NRC to CPCo 11/16/79 l
XV-5 0
XVI X
NRC to CPCo 11/05/80 XV-6 X
NRC to CPCo 11/16/79 XVil G
NRC to CPCo 11/16/79 j
XV-7 0
XV-8 0
XV-9 0
I 2-5
DRESDEN1 FACILITY INFORMATION TOPIC NO.
S W US RUMRKS FACILITY: DRESDEN 1 Il-1 A.
O LICENSEE: COMMONWEALTH EDISON REGION / LOCATION: 9 MILES EAST OF MORRIS, ILL.
DOCKET NO.: 05000010 111 C.
O POWER CAPACITY: 700(THERMAL) 200(ELECTRICAL) 5 NRC to Ceco 12/15/80 11-2 A.
G NRC to CECO 09/11/80 j
3 g
l A/E FIRM: BECH.
11-2 C.
O KEY PERSONNEL 112 D.
G NRC to Ceco 09/11/80 l
l SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL OPERATING REACTORS BFIANCH CHIEF: D. CRUTCHFIELD 11-3 B.
3 Site Visit 11/09/79 OPERATING, REACTORS PROJECT MANAGER: P. O'CONNOR 113 B.1.
3 Site Visit 11/09/79 11-3 C.
3 Site Visit 11/09/79 l
V.CY FOR STATUS CODES 11-4 5
NUREG/CR-1582 08/80
(
)
G - GENERIC 3 - OUESTION f1ESPONSE II 4 A.
5 NUREG/CR 1582 08/80 l
f1ECEIVED RY NFIC 11-4 B.
5 NUREG/CR 1582 08/80 X - DELETED l
4 - DFIAFT SE HECEIVED 0 - TOPIC NOT FitOM REVIEW BRANCll H-4 C.
5 NUREG/CR-1582 08/80 STAft T E D 5 - DRAFT SE SENT TO Il4 D.
O 1 - QUESTIONS FIECEIVED UTILITY 11-4 E.
O l
FROM REVIEW RRANCH 6 - SE FIESPONSE RECEIVED 11-4 F.
O 2 - OUESTIONS SENT TO RY NRC I
UTILITY UI'l 8
7 - TOPIC COMPLETE Ill-2 1
l
- I 2-6 l
4
i 1
i DRESDEN 1 l.
i TOPIC NO.
STATUS REMARKS TOPIC NO.
STATUS REMARKS 1113 A.
1 11110 B.
X NRC to CECO 11/16/79 I
l 1113 B.
X NRC to CECO 11/16/79 11110 C.
X NRC to CECO 11/16/79 f
2 1113 C.
O 88111 0
til-4 A.
0(AEB) 11112 0
O(SEB) til-4 B.
0(MTEB)
IV.1 A.
7 NPC to CECO 11/05/79 1114 C.
0(AEB)
IV 2 2
N RC to CECO 12/15/80 O(RSB) 1114 D.
O IV-3 X
NRC to CECO 11/16/79 til-5 A.
2 NRC to CECO 01/04/80 v.1 G
NRC to CECO 11/TS/79 i
111-5 B.
2 NRC to CECO 01/04/80 v.2 X
NRC to Ceco 11/16/79 i
111-6 2
NRC to CECO 08/04/80 v.3 X
NRC to CECO 11/16/79 1
1117 A.
X NRC to Ceco 11/16/79 v4 G
NRC to CECO 11/16/79 l
1117 B.
1 v.5 6
CECO to NRC 09/02/80 l
l 111-7 C.
X NRC to CECO 11/16/79 V-6 7
NRC to CECO 03/05/80 l
l l
1117 D.
3 CECO to NRC 08/05/80 v.7 X
NRC to CECO 11/16/79 i
111-8 A.
G NRC to CECO 11/16/79 v.8 X
NRC to CECO 11/16/79 l
Ill-8 B.
X NRC to CECO 09/11/80 v.9 X
NRC to CECO 11/16/79 til-8 C.
6 CECO to NRC 03/10/80 v.10 A.
7 NRC to CECO 11/03/79 l
111-8 D.
G NRC to CECO 11/16/79 V.10 B.
4(Sys) i til-9 G
NRC to CECO 11/16/79 V.11 A.
6 CECO to NRC 09/26/80
{
11110 A.
7 CECO to NRC 10/06/80 V.1? B.
X NRC to CECO 09/11/80 i
i 2-7
l DRESDEN 1 TOPIC NO.
ST AT US ItE MAltKS TOPIC NO.
STATUS HEMARKS V 12 A.
6 CECO to NRC 08/12/80 VI-7 D.
G NRC to Ceco 11/16/79 V 13 G
NRC to CECO 11/16/79 VI-7 E.
G NRC to Ceco 11/16/79 VI-1 3
CECO to NRC 07/27/79 VI-7 F.
X NRC to CECO 11/16/79 VI 2 A.
X NRC to CECO 11/16/79 VI-8 G
NRC to Ceco 09/11/80 VI-2 B.
G NRC to CECO 11/16D9 VI-9 X
NRC to CECO 09/11/80 VI 2 C.
X NRC to Ceco 1T/16/79 VI 10 A.
O VI-2 D.
2 VI-10 B.
6(Sys)
CECO to NRC 05/02/79 i
7(Elec) i VI-3 2
Vll.1 A.
O I
j V14 0(Sys)
Vll.1 B.
G NRC to CECO 11/16/79 1(Elec) i VI-5 1
Vil-2 0
I I
Vl4 G
NRC to CECO 11/16/79 Vil 3 4(Sys)
(
O(Elec)
VI 7 A.1.
X NRC to CECO 11/16/79 Vil4 G
NRC to CECO 11/16/79 i
VI-7 A. 2.
X NRC to CECO 11/16/79 Val-5 G
NRC to CECO 11/16/79 VI-7 A. 3.
O Vil4 G
NRC to Ceco 11/16/79 VI 7 A. 4.
G NRC to CECO 11/16/79 Vll 7 X
NRC to CECO 11/16/79 VI 7 B.
X NRC to CECO 11/16/79 Vill 1 A.
G NRC to CECO 11/16/79 VI 7 C.
O Vill-2 7
VI 7 C.1.
7 Vill-3 A.
2 NRC to CECO 10/10/80 VI 7 C. 2.
7 Vill-3 B.
5 NRC to CECO 07/01/80 VI-7 C. 3.
X NRC to CECO 11/16/79 Vlil4 5
NRC to CECO 06/12/80 2-8 4
i
4 1
4 i
DRESDEN 1
{
TOPIC NO.
STATUS H[M AHKS TOPIC No.
STATUS HEM AH KS IX 1 3
CECO to NRC 06/02/80 XV-10 X
NRC to CECO 11/16/79 IX 2 G
NRC to CECO 11/16/79 XV 11 0
l IX 3 3
CECO to NRC 11/29/79 XV-12 X
NRC to CECO 11/16/79 I
i IX4 X
NRC to CECO 11/16/79 XV-13 O(Sys) l O(Doses)
IX 5 0
XV-14 0
IX-6 G
NRCao CECO 11/16/79 XV-15 0
X X
NRC to CECO 11/16/79 XV-16 0
I l
XI-1 G
NRC to CECO 11/16/79 XV-17 X
NRC to CECO 11/16/79 1
l XI-2 G
NRC to CECO 11/16/79 XV-18 O(Sys) s O(Doses)
{
Xill 1 G
NRC to CECO 11/16/79 XV.19 0(Sys) l 0(Doses)
XIll 2 G
NRC to CECO 11/16/79 XV-20 7
NRC to CECO 08/12/80 XV1 0
XV-21 G
NRC to CECO 11/16/79 XV-2 X
NRC to CECO 11/16/79 XV-22 G
NRC to CECO 11/16/79 XV-3 0
XV 23 X
NRC to CECO 11/16/79 XV4 0
XV-24 G
NRC to Ceco 11/16/79 XV-5 0
XVI X
NRC to CECO 11/05/80 i
XV-6 X
NRC to Ceco 11/16/79 XVil G
NRC to CECO 11/16/79 XV-7 0
XV-8 0
XV-9 0
j 2-9
l RESDEN 2 i
j FACILITY INFORMATION TOPIC NO.
STAT US REMARKS i
F ACILITY: DRESDEN 2 i
111 A.
O j
LICENSEE: COMMONWEALTH EDISON H 1 B-0 REGION / LOCATION: 9 MILES EAST OF MORRIS, ILL.
DOCKET NO.: 05000237 11 1 C.
o POWER CAPACITY: 2527(THE RM AL) 0794(ELECTRICAL) j ll 2 A.
5 NRC to CECO 12/15/80 OL NUMCER: DPR-19 l
11-B.
G NRC to CECO 09/11/80 N.S. S.S.: GE.
A/E FIRM: S&L 11-2 C.
O I
KEY PERSONNEL H 2 D.
G N9C to CECO 09/11/80 l
SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSE LL Si e Vis t 01/09/79 i
OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD 11-3 B.
3 CECO to NRC Site Visit 01/09/79 OPERATING REACTORS PROJECT MANAGER: P. O'CONNOR l33 B.1.
3 CECO to NRC l
Site Visit 01/09/79 l
H-3 C.
3 CECO to NRC Ste Msit 01/09/79 l
KEY FOR STATUS CODES H'4 j
5 NUREG/CR 1582 08/80 184 A.
5 G - GENERIC 3 - OllESTION RESPONSE NUREG/CR 1582 08/80 H5CEIVED BY NRC I
5 X - DELETED NUREG/CR 1582 08/80 4 - DRAFT SE RECEIVED 114 C.
5 0 - TOPIC NOT FROM REVIEW BRANCH NUREG/CR-1582 08/80 t
H O.
o 5 - DRAFT SE SENT TO 1 - OUESTIONS RECEIVED OTILITY 114 E.
O FROM REVIEW BRANCH 6 - SE RESPONSE RECElVED 114 F.
0 2 - QUESTIONS SENT TO BY NRC UTILITY gg g.1 7 - TOPIC COMPLETE gggy,y 3(Elec) Part of Vil-3 111 2 3
e 2-10 t
4+%%>
h
$<s' e
$$s
,.e. ev <e 1,.
TEST TARGET (MT-3) p I.0 l# Ha !!E y l} EM I
l.l l 5 lE
)
1.8 m
1.25 1.4 11.6 l~
/
6"
=
p%
+ gr
$ h)
l DRESDEN 2 TOPIC NO.
STATUS REMARKS TOPIC NO.
STATUS REMARKS Ill 3 A-3 CECO to NRC 09/28/79 til 10 B.
X NRC to CECO 11/16/79 l
I til-3 B.
X NRC to CECO 11/16/79 11110 C.
7 NRC to CECO 05/22/79 1113 C.
O 11111 3
)
1814 A.
0(AEB) 11112 3
Ceco to NRC 10/30/80 i
0(SEB) f 1114 B.
0(MTEB)
IV 1 A.
7 NRC to CECO 11/13/79 i
O(SEB) 1814 C.
0(RSB)
IV 2 2
NRC to CECO 12/15/80 O(SEB)
)
1814 D.
O IV 3 G
NRC to CECO 11/16/79 j
i 111-5 A.
2 NRC to CECO 01/04/80 V1 G
NRC to CECO 11/16/79 l
3 til-5 B.
6 CECO to NRC 03/21/80 V2 X
NRC to CECO 11/16/79 Ill-6 5
NRC to Ceco 05/20/80 V3 G
NRC to CECO 11/16/79 I
1117 A-X NRC to CECO 11/16/79 V4 G
NRC to CECO 11/16/79
}
l 111 7 B.
3 CECO to NRC 04/28/79 V5 6
CECO to NRC 09/02/80 1817 C.
X NRC to CECO 11/16/79 V-6 7
NRC to CECO 03/05/80 1
3 1117 D.
3 CECO to NRC 08/05/80 V-7 X
NRC to CECO 11/16/79 111-8 A.
G NRC to CECO 11/16/79 V-8 X
NRC to CECO 11/16/79 118-8 B.
G NRC to CECO 09/11/80 V-9 X
NRC to CECO 11/16/79 lil-8 C.
6 CECO to NRC 03/10/80 V 10 A.
7 NRC to CECO 11/08/79 til-8 D.
G NRC to CECO 11/16/79 V.10 B.
5(Sys) NRC to CECO 11/14/80 lil-9 G
NRC to CECO 11/16/79 V 11 A.
5 NRC to CECO 11/14/80 l
111-10 A.
7 ARC to CECO 01/26/81 V 11 B.
5(Sys) NRC to CECO 11/14/80 1
6(Elec) CECO to NRC 09/22/80 i
2 11
DRESDEN 2
}
TOPIC NO.
STATUS IIL MAR KS topic NO.
STAIUS IIL M AllKS V 12 A.
6 CECO to NRC 08/12/80 VI 7 D.
G NRC to CECO 11/16/79 i
V.13 G
NRC to CECO 11/16/79 VI-7 E.
x NRC to CECO 11/16/79
]
{
VI1 3
CECO to NRC 07/27/79 VI 7 F.
X NRC to CECO 11/16/79 I
j VI-2 A-G NRC to Ceco 11/16/79 VI-8 G
NRC to CECO 09/11/80 l
VI.2 B.
G NRC to Ceco 11/16/79 VI-9 X
NRC to Ceco 11/16/19 V;-2 C.
X NRC to CECO 11/16/79 VI-10 A.
3 CECO to NRC 09/24/80 VI-2 D.
3 Ceco.o NRC 11/20/80 VI 10 D.
6(Sys)
CECO to NRC 05/02/79 7(Elec)
NRC to CECO 01/30/81 VI-3 3
CECO to NRC 11/20/80 Vil1 A.
2 NRC to CECO 10/22/80
)
Vl4 O(Sys)
Vil1 8.
G NRC to CECO 11/16/79 1(Elec)
VI-5 i
Vll ?
3 CECO to NRC 09/22/80 q
l l
V14 G
NRC to CECO 11/16/79 Val-3 5(sys)
NRC to CECO 11/14/80 3(Elec)
VI 7 A.1.
X NRC to CECO 11/16/79 Vil4 G
NRC to Ceco 11/16/79 VI-7 A. 2.
X NRC to CECO 11/16/79 Vil 5 G
NRC to CECO 11/16/79 VI-7 A. 3.
3 Vil4 G
NRC to CECO 11/16/79 VI 7 A. 4.
G NRC to CECO 11/16/79 Vll 7 X
NRC to Ceco 11/16/79 VI-7 B.
X NRC to CECO 11/16/79 Vill 1 A.
G NRC to CECO 11/16/79 VI.7 C.
O Vill-2 7
NRC to CECO 12/31/80 l
l VI 7 C.1.
1 Vill-3 A.
7 NRC to CECO 11/08/79 6
i VI 7 C. 2.
O VillG D.
7 NRC to Ceco 01/26/81 VI-7 C. 3.
X NRC to Ceco 11/16/79 Vil14 5
NRC to CECO 06/12/80 I
\\,
2-12 1,
I
DRESDEN 2 IOPlc NO.
STATUS IIE M AltKS 10PIC NO.
STAIUS itLMAltKS t
XV 10 X
NRC to CECO 11/16/79 IX 1 3
Ceco to NRC 06/02/80 XV 11 o
IX 2 G
NRC to CECO 11/1609 IX 3 3
CECO to NRC 11/29/79 XV 12 X
NRC to CECO 11/1609 XV 13 ogsy,)
IX4 X
NRC to CECO 11/1609 OtDoses)
XV 14 o
IX 5 o
XV 15 0
IX4 G
NRC to CECO 11/16/79 XV 16 3
CECO to NRC 08/18/80 X
X NRC to CECO 11/16/79 XV 17 X
NRC to CECO 11/16/79 XI1 G
NRC to CECO 11/16/79 XV 18 XI-2 G
NRC to CECO 11/1609 0(Sys)
O(Doses)
XV-19 Xlil 1 G
NRC to CECO 11/16,79 og,y,)
O(Doses)
XV 20 Xill 2 G
NRC to CECO 11/16/79 0
XV 21 XV1 0
G NRC to CECO 11/16/79 XV 22 XV2 X
NRC to CECO 11/16/79 G
NRC to CECO 11/16/79 XV 23 XVG 0
X NRC to CECO 11/16/79 r
XV 24 XV4 0
G NRC to Ceco 11/16/79 XVI XV-5 0
X NRC to CECO 11/05/80 XVil G
NRC to Ceco 11/1699 XV-6 X
NRC to CECO 11/16/79 XV7 0
XV-8 o
XV9 0
2 13
IINNA FACILITY INFORMATIO_N-topic NO.
ST AT US REMARKS FACILITY: GINNA 111 A.
O LICENSEE: ROCHESTER GAS & ELECTRIC REGION / LOCATION: 15 MILES NORTH E AST OF ROCHESTER, NY.
DOCKET NO.: 05000244 11 1 C.
O COWER CAPACITY: 1520(THERMAL) 0490(ELECTRICAL) 11-2 A.
6 RGE to NRC 01/19/81 OL NUMBER: DPR 18 112 B.
G NHC to RGE 10/01/80 A/E FIRM: GIL 11-2 C.
6 RGE to NRC 01/30/79 11-2 D.
G NRC to RGE 10/01/80 KEY PERSONNEL l13 A.
5 NRC to RGE 12/12/80 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL l
OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIE LD l[.3 B.
5 NRC to RGE 12/12/80 i
OPERATING REACTOHS PROJECT MANAGER: R. SNAIDER l
113 B.1.
5 NRC to RGE 12/12/80 l
l ll-3 C.
5 NRC to RGE 12/12/80 l
KEY FOR STATUS CODES ll-4 5
NUREG/CR 1582 08/80 11-4 A-5 NUREG/CR 1582 08/80 G - GENERIC
- OUESTION FIESPONSE RECEIVED RY NRC X - DELETED 4 - DilAFT SE RECEIVED R
C.
5 NUREG/CR 1582 08/80 0 - TOPIC NOT FitOM REVIEW IIRANCll R
0 5 - DRAFT SE SFNT TO
}
1 - OUESTIONS RECEIVED UTILITY 9
FROM RFVIEW RRANCH I
G - SE RESPONSE RECEIVED p
2 - OUESTIONS SENT TO RY NRC UTILITY n g.j 2(Sys) NRC to RGE 01/13/81 7 - 10PIC COMPLETI 6(Elec) RGE to NRC 01/23/81 Ill-2 3
RGE to NRC 11/14/79 2 14 I
i GINNA l
10PIC NO.
ST Al tlS III M Alt KS IOPIC NO.
ST All)S lif MAltKS Ill3 A.
3 HGE to Ni1C 11/14/19 11110 B.
7 ftGE to NItC 08/79/79 til-3 B, X
NitC to itGE 12/31/80 181-10 C.
X NitC to itGE 11/16/79 111 3 C.
0 88111 5
NitC to itGE 01/07/81 1114 A.
0 lg312 3
ftGE to NHC 10/31/30 1114 B.
7 NitC to HGE 04/18/79 IV 1 A.
7 NHC to HGE 05/29/79 1114 C.
0 lV.2 3
ftGE to NitC 01/19/81 i
l 1114 D.
O IV 3 X
NitC to ItGE 11/16/19 I
i i
til 5 A.
O V.1 O
NitC to itGE 11/16/19 lil 5 B.
5 NitC to HGE 06/24/80 V.2 X
NitC to HGE 11/16/79 Ill 6 5
- :1C to TIGE 01/07/81 V.3 0
NitC to itGE 11/16/79 118 7 A.
X NitC to HGE 11/16/79 V4 G
NHC to itGE 11/16/79 l
i Ill'7 B.
3 HGE to NitC 11/14/79 V-5 4
l l
lil-7 C.
O V6 7
NitC to HGE 03/05/80 1
III'7 O-7 NitC to ItGE 05/014/B0 V7 G
NitC to itGE 11/16/79 lil 8 A.
G NitC to itGE 11/16/79 V8 G
NitC to HGE 11/16/79 t
til 8 B.
X NitC to HGE 10/01/80 V9 X
NHC to ItGE 11/16/19 j
1118 C.
7 ftGE to NHC 12/07/79 V 10 A.
7 NHC to HGI 02/02/19 Ill 8 D.
O NHC to ilGE 11/16/79 V.10 B.
6(Sys)
HGE to NHC 01/13/81 I
til 9 O
NitC to llGE 11/16/79 V 11 A.
6(Elec)
ItGE to NitC 01/08/01 6(Sys)
IIGE to NHC 01/13/81 I
11110 A.
6 HGE to NitC 01/08/81 V.11 B.
g(Sys)
ItGE to NltC 01/13/81 l
GIElec)
ItGE to NitC 91/08/81 M
2 16 I
GINNA I
topic NO.
STATUS REMAHKS TOPIC NO.
STATUS HEMAHKS V-12 A.
X NRC to H 3E 11/16/79 VI 7 D.
G NRC to RGE 11/16/79 l
V.13 G
NRC to RGE 11/16/79 VI 7 E.
G NRC to RGE 11/1699 i
VI-1 1
VI-7 F.
6 RGE to NRC 01/08/81 VI 2 A.
X NRC to RGE 11/16/79 VI-8 G
NRC to RGE 10/01/80 Vl-2 B.
G NRC to RGE 11/16/79 VI-9 X
NRC to RGE 11/16/79 i
l VI-2 C.
X NRC to RGE 11/16/79 VI-10 A.
7 NRC to RGE 12/15/%
l I
l l
VI 2 D.
3 VI-10 B.
X NRC to RGE 11/16/79 l
VI 3 3
Vll.1 A.
7 RGE to NRC 01/28/81 i
j j
vl4 O(Sys)
Vll 1 B.
G NRC to RGE 11/16/79 j
7(Elec) NRC to RGE 01/12/81 VI5 0
Val-2 6
RGE to NRC 01/23/81 V14 G
NRC to RGE 11/16/79 Vll-3 61Sys)
RGE to NRC 01/13/81 6(Elec) RGE to NRC 01/23/81 VI-7 A.1.
7 NRC to RGE 05/01/78 Vil4 G
NRC to RGE 11/16/79 i
VI-7 A. 2.
G NRC to RGE 11/16/79 Vil-5 G
NRC to RGE 11/16/79 VI-7 A. 3.
7 NRC to RGE 12/15/80 Vll4 G
NRC to RGE 11/16/79 VI 7 A. 4.
X NRC to RGE 11/16/79 Vil-7 X
NRC to RGE 11/16/79 VI-7 B.
2 NRC to RGE 09/16/80 Vill 1 A.
G NRC to RGE 11/16/79 1
i VI-7 C.
7 NRC to RGE 05/14/75 Vill 2 5
NRC to RGE 12/12/80 VI-7 C.1.
6 RGE to NRC 01/08/81 Vill-3 A.
7 NRC to RGE 04/18/79 VI-7 c. 2.
7 NRC to RGE 05/14/75 VHI-3 B.
6 RGE to NRC 01/08/81 VI 7 C. 3.
X NRC to RGE 11/16/79 Vill 4 6
RGE to NRC 07/21/80 2-16 I
I i
I
'l i
l GINNA i
topic NO.
STATUS REMAltKS lOPIC NO.
STATUS ItEMARKS IX 1 0
XV 10 0
{
IX 2 G
NRC to RGE 11/1649 XV 11 X
NRC to RGE 10/01/80 l
IX-3 3
XV-12 O(Sys)
O(Doses)
IX4 0
XV 13 X
NRC to RGE 11/16/79 IX-5 0
XV 14 0
IX4 G
NRC to RGE 11/16/79 XV 15 0
X 0
XV 16 3
RGE to NRC 06/18/80 XI 1 G
NRC to RGE 11/16/79 XV 17 O(Sys)
O(Doses)
XI-2 G
NRC to RGE 11/16n9 XV-18 X
NRC to RGE 03/11/80
-l 1
Xill 1 G
NRC to RGE 11/16/79 XV-19 0(Sys) 1 0(Doses)
Xill-2 G
NRC to RGE 11/16/79 XV-20 0
XV 21 G
NRC to RGE
.To/19 XV1 3
RGE to NRC 06/03/80 XV2 3(Sys)
RGE to NRC 06/03/80 XV-22 G
NRC to RGE 11/16/79 l
O(Doses)
XV3 3
RGE to NRC 06/03/80 XV 23 G
NRC to RGE 11/16179 l
XV4 0
XV-24 G
NRC to RGE 11/16/79 XV-5 0
XVI X
NRC to RGE 11/0540 XV-6 0
XVil G
NRC to RGE 11/16/79
?i XV7 3
RGE to NRC 06/03/80 XV-8 3
RGE to NRC 06/03/80 XV-9 0
2-17 1
HADDAM NECK j
FAClllTY INFORMATION 10PIC NO.
STATUS REMAllKS FACILITY: HADDAM NECK H.1 A.
O j
LICENSEE: CONNECTICUT YANKEE ATOMIC POWER H 1 B.
O
{
REGION / LOCATION: 13 MILES EAST OF MERIDEN, CT.
DOCKET NO.: 05000213 H.1 C.
O POWER CAPACITY: 1825(THERMAL 0575(ELECTRICAL) j 11-2 A.
6 CYAPCo to NRC 01/22/81 j
G NRC to CYAPCo 10/01/80 N.S.S.S.: WEST.
A/E FIRM: S&W 112 C.
7 CYAPCo to NRC 02/16/79 l
i KEY PERSONNEL H 2 D.
G NRC to CYAPCo 10/01/80 t
i SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD 11-3 B.
3 Site Visit OPERATING REACTORS PROJECT MANAGER: R. CARUSO n.3 B.1.
3 Site Visit 113 C.
3 Site Visit KEY FOR STATUS CODES H4 5
NUR EG/CR.1582 08/80 H4 A.
G - GEh F'itC 3 - OUESTION RESPONSE 5
NUREG/CR.1582 08/80 i
ilECEIVED ltY NilC H4 8-X - DELE TED 5
NUREG/CR.1582 08/80 4 - DilAFT SE RECElVED H-4 C.
5 NUREG/CR.1582 08/B0 h
0 - topic NOT IllOM llEVIEW IIR ANCH i
ST Af1T f D H4 D.
O 5 - DitAFT SE SINT TO t
1 - OUESTIONS RECEIVED UilLITY X
NRC to CYAPCo 04/16/79 FROM 11EVIEW IIR ANCH i
G - SE IlFSPONSE fit CEIVE D H
0
{
2 - OUESTIONS SENT TO IlY NRC I
U flLIT Y I
3(sys)
CYAPCo to NRC 09/28/79 7 - TOPIC COMPLETE 0(Elec)
III-2 3
CYAPCo to NRC 09/07/79 2 18 t
HADDAM NECK 10PIC NO.
STATUS REM AllKS TOPIC NO.
ST All3S REMARKS 1113 A.
3 CYAPCo to NRC 09/07/79 111-10 B.
7 NRC to CYAPCo 08/26/80 til 3 B.
O 11g.10 C.
X NRC to CYAPCo 04/1699 111-3 C.
O 11111 3
Ill-4 A.
0(AEB) 111-1 2 3
CYAPCo to NRC 10/31/80 1(SEB) 1814 B.
0(MTEB)
IV 1 A.
7 CYAPCo to NRC 06/25 # 9 0(SEB) 111-4 C.
0(RSB) qv.2 2
NRC to CYAPCo 12/15/80 0(SEB) til4 D.
O sv.3 X
NRC to CYAPCo 11/16/79 118-5 A.
3 CYAPCo to NRC 02/07/80 V1 G
NRC to CYAPCo 04/16/79 tilf B.
3 v.2 X
NRC to CYAPCo 04/16/79 111-6 2
NRC to CYAPCo 08/04/80 V-3 G
NRC to CYAPCo 04/16/79 til-7 A.
X NRC to CYAPCo 11/16/73 V-4 G
NRC to CYAPCo 11/16/79 til-7 B.
3 CYAPCo to NRC 09/07/79 V5 7
1187 C.
X NRC to CYAPCo 04/16D9 V-6 7
NRC to CYAPCo 03/05/80 t
1117 D.
O V.7 G
NRC to CYAl Co 04/16/79 til 8 A.
G NRC to CYAPCo 11/16/79 V-8 G
NRC to CYAPCo 04/16/79 111-8 3.
X NRC to CYAPCo 10/01/80 V-9 X
NRC to CYAPCo 11/16/79 lil 8 C.
6 CYAPCo to NRC 12/18/79 V-10 A.
7 NRC to CYAPCo 01/13/81 111-8 D.
G NRC to CYAPCo 11/16/79 V.10 B.
6(Sys)
CYAPCo to NRC 09/28/79 111-9 G
NRC to CYAPCo 11/16/19 V-11 A.
7 CYAPCO to NRC 09/04/80 l
11110 A.
CYAPCo to NRC 09/04/80 V 11 B.
6(Sys)
CYAPCo to NRC 09/28/79 l
4(Elect Part of Vil-3 l
2-19
l HADDAM NECK i
j i
10PIC NO.
SiATUS HfMAHKS IOPIC NO.
STATUS ItEMAltKS 1
I i
V.12 A.
X NRC to CYAPCo 04/16/79 VI 7 D.
G NRC to CYAPCo 11/16/79 V 13 G
NRC to CYAPCo 04/16/79 VI 7 E.
G NRC to CYAPCo 11/16/79 i
i l
VI-1 3
CYAPCo to NRC 10/31/79 VI 7 F.
X NRC to CYAPCo 04/16/19 i
l l
VI-2 A.
X NRC to CYAPCo 04/16/79 VI-8 G
NRC to CYAPCo 10/01/80 l
VI-2 B.
G NRC to CYAPCo 04/16/79 VI-9 X
NRC to CYAPCo 11/16/79 NRC to CYAPCc 04/16/79 VI 10 A.
O VI-2 C.
X VI-10 B.
X NRC to CYAPCo 04/16/79 VI-2 D.
2 Vil1 A.
O VI-3 2
Vll1 B.
G NRC to CYAPCo 04/16/79 Vl4 O(Sys) 7(Elec) CYAPCo to NRC 12/08/80 Vil-2 0
VI-5 3
CYAPCo to NRC 11/05/80 V14 o
NRC to CYAPCo 11/16/79 Vil 3 6(Sys)
NRC to CYAPCo 09/28/79 7(Eled CYAPCo to NRC 01/22/81 l
VI-7 A.1.
7 NRC to CYAPCo 10/22/77 Vil4 G
NRC to CYAPCo 04/16/79 VI 7 A. 2.
X NRC to CYAPCo 04/16/79 Val-5 G
NRC to CYAPCo 04/16/79 Vil4 G
NRC to CYAPCo 04/16/19 VI-7 A. 3.
O VI 7 A. 4.
X NRC to CYAPCo 04/16/19 VII-7 X
NRC to CYAPCo 04/16/79 l
f VHl 1 -
G NRC to CYAPCo 04/16/79 VI 7 B.
O 1
I Vill-2 6
CYAPCo to NRC 10/03/80 l
VI 7 C.
O Vill-3 A-7 CYAPCo to NRC 02/16/79 VI-7 C.1.
7 CYAPCo to NRC 09/04/80 Vill.3 8.
7 CYAPCo to NRC 01/22/81 VI-7 C. 2.
O l
WH4 0
vi-7 C. 3.
3 l
2 20 i
l L
l I
HADDAM NECK IOPIC NO.
SI AltJS fil M Alt kS IOPIC NO.
SI Alt)$
itL M AltKS l
IX 1 0
XV 10 0
(
IX 2 G
NRC to CYAPCo 11/10/19 XV 11 X
NRC to CYAPCo 10/01/80 i
l IX 3 2
XV 12 O(Sys) l O(Doses)
I IX4 0
XV 13 X
NRC to CYAPCo 11/16/19 I
I IX 5 0
XV 14 0
i I
)
IX4 G
NRC to CYAPCo 04/16/19 XV15 0
l X
0 XV 16 3
CYAPCo to NRC 06/20/80 XI1 G
NRC to CYAPCo 04/16/19 XV 17 o(sy,)
O(Doses)
XI2 G
NRP to CYAPCo 11/16/19 XV 18 X
NRC to CYAP'.;o 10/01/80 l
XIll i G
NRC to CYAPCo 11/16/19 XV 19 0(sy )
l 0(Doses)
Xill 2 O
NRC to CYAPCo 11/16fi9
!"/-20 0
XV1 0
XV-21 G
NRC to CYAPCo 11/16/19 XV2 0(Sys)
XV-22 G
NRC to CYAPCo 04/16/19
{
O(Doses) l XV-3 0
XV-23 G
NRC to CYAPCo 11/16/19 I
XV4 0
XV 24 G
NRC to CYAPCo 11/16/19 XV5 0
XVI X
NRC to CYAPCo 11/05/80 XV-6 0
XVil G
NRC to CYAPCo 11/16/19
}
XV7 0
xv-s 0
I l
XV9 0
i 2-21
LACROSSE - __ _
FACILITY INFOilMATION gopic no, sg 3 g g,s sig uasigs j
F ACILITY: LACItOSSE 111 A.
0 l
LICF.NSEE: DAlHYLAND POWEft 11 1 B.
O t
]
ftEGION/ LOCATION: 19 MILES SOUTH OF LACitOSSE, WISC.
Il 1 C.
O DOCKET NO : 05000409 I
POWEli C APACITY: 0105(T HEllM AL) 00bO(E LECTIllCAL) 112 A.
5 Nitr 1 DPC 12/15/80 l
OL NUMBEll: DPit 45 l
Il 211.
G Niit.o DPC 09/26/80
?
N.S.S S.: AC.
I 112 C.
O A/E FIFtM: S& L i
l I
11-2 D.
G NitC to DPC 09/25/110
- yv PEllSONNEL 113 A.
0 l
SYSTEMATIC EVALUATION PitOGilAM IIMANCH C141[Fr W. ItUSSELL OPEHATING HE ACTOllS HilANCH chi [F: D. CituTCHFIE LD OPEftATING ftE ACf0ftS PitOJECT MANAGEll: J. SHE A 113 D.1.
O i
113 C.
O KEY 0011 ST ATilS CODES 11 4 5
Nullf G/CH 1662 08/80 i
Il-4 A-5 NUllEG/CFt 1582 08/80 n, GE NI'fIIC 3 - 000 silon lll SPONSI.
f TIC [lVI D llY NltC H4 -
5 NUllEG/ Cit 1582 0 8/110 X - DilIIID 4 - Dit AF i St IIICI !VI O H 4 C.
5 NullLG/ Cit 1t,82 08/t50
'I TOPIC NOT F ltOM lti Vit W lill ANCl4 te su 01/10/19 5 - Dil AI 1 Sl' SE N I 10 l
1 - OUISilONS Ill Cl IVt U HIH ilY ll 4 [.
O t ItOM ltt Vil'W lill ANCil G - Si itt 5PONSI lit Cl IVI D p
2 - Olli S'lONS St N T TO ltY NitC I
I tiill'1
- g.1 itsy,)
j 7 ~ TOPIC COMPLI if O(flec)
)
lli 2 2
NitC to DPC 08/09/79 2 22 l
- i. -.
LACROSSE TDric NO.
ST AT US IlE M ARKS TOPIC NO.
SIA10S RIMARKS lil-3 A.
2 NRC to DPC 08/09/79 11110 B.
X NRC to DPC 10/29/79 I
111-3 B.
O 18110 C.
X NRC to DPC 10/29/19 Ill-3 C.
O 88111 3
DPC to NRC 06/11/79 1814 A.
0(AEB) 11112 3
DPC to NCC 10/31/80 O(SED) 1114 B.
0(MTE B)
IV 1 A.
7 NRC to DPC 04/19/79 O(SED) 1114 C.
O IV 2 2
NRC to DPC 12/15/80 til4 D.
O IVO X
NRC to DPC 10/29/79 i
181-5 A.
2 DPC to NFIC 01/04/80 V1 G
NRC to DPC 10/29/19 til 5 B.
2 NRC to DPC 01/04/80 V2 X
NRC to DPC 10/29/79 all 6 3
DPC to NRC 1 0/14/80 V4 X
NRC to DPC 10/29/79 118-7 A-X NRC to DPC 10/29/79 V4 G
NRC to DPC 10/20/79 lil 7 B.
2 NRC to DPC 08/09/19 V-5 4
Ill 7 C.
X NRC to DPC 10/29/79 V-6 7
NRC to DPC 03/05/80, til 7 D.
2 NRC to DPC 08/09/79 V7 X
NRC to DPC 10/29/79 lil-8 A.
G NRC to DPC 10/29/79 V-8 X
NRC to DPC 10/29/79 1118 B-X NRC to DPC 09/26/80 V-9 X
NRC to DPC 10/29/79 Ill 8 C.
5 NRC to DPC 12/15/80 V 10 A.
7 NRC to DPC 01/07/81 1118 D.
G NHC to DPC 10/29/79 V-10 B.
4(Sys) 111 9 G
NRC to DPC 10/29/79 V 11 A.
5 NRC to DPC 07/10/80 11110 A.
5 NRC to DPC 07/10/80 V 11 B.
4(Sys)
O(Elec) 2-23
i LACROSSE I
I j
TOPIC NO.
STATUS HEMARKS TOPIC NO.
STATUS HEMARKS I
i V 12 A.
7 NRC to DPC D4/30/79 VI-7 D.
G NRC to DPC 10/29/70 i
V.13 G
NRC to DPC 10/29/39 VI-7 E.
X NRC to DPC 10/29/79 I
1 VI-1 3
DPC to NRC 08/23/79 VI 7 F.
X NRC to DPC 10/29/79 VI 2 A.
X NRC to DPC 10/29/79 VI-8 G
NRC to DPC 09/26/80 l
l VI-2 B.
G NRC to DPC 10/29/79 VI-9 X
NRC to DPC 10/29/79 1
1 4
Il 2 C.
X NRC to DPC 10/29/79 VI 10 A.
O VI-2 D.
3 DPC to NRC 04/26/79 VI 10 B.
X NRC to DPC 10/29/79 VI 3 3
DPC to NRC 04/26/79 Vll1 A.
0 l
V14 0(Sys)
Vil 1 B.
G NRC to DPC 10/29/79 1
1(Elec)
VI5 1
Vll 2 0
Vl4 G
NRC to DPC 10/29/79 Vll 3 4(Sys) 3(Elec)
VI 7 A.1.
X NRC to DPC 10/29/79 Vil4 G
NRC to DPC 10/29/19 I
VI-7 A 2.
X NRC to DPC 10/29/79 Vil-5 g
NRC to DPC 10/29/79 VI-7 A. 3.
O Vil4 o
NRC to DPC 10/29/79 i
VI-7 A. 4.
X NRC to DPC 10/29/79 VH-7 X
NRC to DPC 10/29/79 f
10/*9/79 Vill-1 A.
c NRC to DPC 10/29/79 VI-7 B.
X NRC to DPC i
i e
VI-7 C.
O Vill 2 5
NRC to DPC 08/20/80
{
i VI 7 C.1.
5 NRC to DPC 07/10/80 Vill-3 A.
7 NRC to DPC 06/05/79 j
VI-7 C. 2.
O Vill-3 B.
5 NPC to DPC 07/10/80 i
VI 7 C. 3.
X NRC to DPC 10/20/79 Vill 4 6
DPC to NRC 10/08/80 I
2-24 4
i
i l
i LACROSSE l
f j
10f'IC NO.
ST AitJS ItL M Alt KS TOPIC NO.
ST AitJS flEMAHKS IX 1 0
XV 10 X
NRC to DPC 10/29/79 i
{
IX 2 G
NRC to DPC 10/29/79 XV-11 0
I l
l IX-3 2
XV 12 X
NRC to DPC 10/29/79 1
IX4 X
NRC to DPC 10/29/79 XV 13 es)
\\
IX-5 0
XV 14 0
IX4 G
NRC to DPC 10/29/79 XV 15 0
X X
NRC to DPC 10/29/79 XV 16 o
XI-1 G
NRC to DPC 10/29/79 XV-17 X
NRC to DPC 10/29/79 XI2 G
NRC to DPC 10/29/79 XV-19 O(Doses) l O(Sys!
l XIll-1 G
NRC to DPC 10/29/79 XV 19 O(Doses)
O(Sys) j XIll 2 G
NRC to DPC 10/29/79 XV-20 o
XV1 XV 21 G
NRC to DPC 10/29/79 u
l' XV2 X
NRC to DPC 10/29/79 XV-22 G
NRC to DPC 10/29/79 i
XV4 o
XV-23 X
NRC to DPC 10/29/79 XV4 0
XV-24 G
NRC to DPC 10/28/79 XV-5 0
XVI X
NRC to DPC 11/05/PO XV 6 X
NRC to DPC 10/29/79 XVil G
NRC to DPC 10/29/79 t
XV7 0
XV-8 o
XV-9 o
~
2-25 4
l MILLSTONE 1 I
FACILITY INFOi1MATION topic NO.
ST Aitis llEMAltKS FACILITY: MILLSTONE 1 g
LICENSEE: NORTHEAST NUCLEAR ENERGY ITEGION/ LOCATION: 5 MILES SOUTH WEST OF NEW LONDON, CONN.
DOCKET NO.: 05000245 11 1 C.
O POINEft CAPACITY: 2011(THEllM ALI 0600(E LECT FilCAL) 112 A.
6 NU to NitC 01/22/81 OL NUMBER: DPil-21 it 2 B.
O NRC to NU 09/26/80 N.S.1S.: GE.
H 2 C.
O A/E FIFtM: EBASCO 18-2 D.
G NitC to NU 09/26/80 KEY PEllSONNEl.
H-A.
0 SYSTEMATIC EVALUATION PflOGRAM BilANCH CHIEF: W. ItUSSELL l
}
OPEftATING 11EACTORS BRANCH CHIEF: D. CitU TCH FIE LD l13 R.
O I
OPERATING ItE ACTORS PROJECT MANAGEft: J. SHE A i
11-3 C.
O KEY Foil STATUS CODES 13 4 5
NUREG/ Cit 1582 08/80 114 A.
5 NUREG/ Cit-1582 08/80 G Of NIltlC 3 - OtllSilON fil' PONSE d
l fif Cf IVE D lh NRC 184 B-5 NUREG/CH 1582 08/80 X - DiL E IID 4 - Dit AT I Si lif CElVID 114 C.
5 NURc G/ Cit.1582 08/80 0 - TOPIC NOT ritOM ltEVil W 1111 ANCil l
l ST AlliF D R
0 l
5 - Dit Ar i SE Si N T TO tiittlIY l
1 - OtlISilONS It[CLIVE D FitOM HLVIIW lift ANCit I 2-OtlFSilONS SINT 10 6 St Ill SPONSI Ill Cl IVF D llY NItc tiill I T Y H31 O(Elec,)
1 - 10Pic COMPI f II y g3g lH 2 3
NU to NitC 08/29/79 2 26 l
k
~
l MILLSTONE 1 TOPIC NO.
STAT US HEMARKS TOPlc No.
STATUS RFMARKS i
w-j 1113 A.
4 lll 10 8.
X NRC to iw 11/16/79 818-3 B-X NRC to NU 12/26/80 11110 C.
6 NU to NRC 08/29/79 l
1 i
I6.-3 C.
O 881 11 3
v i
118-4 A.
3(SEB)
NU to NRC 12/05/80 11112 3
NU to NRC 10/31/80 O(AEB) 118-4 B.
3(SEB)
NU to NRC 12/05/80 IV.1 A.
7 NU to NRC 02/12/79 j
0(MTEB)
I 1884 C.
3(SE B)
NU to NRC 12/05/80 IV 2 2
NRC to NU 12/15/80 l
0(RSB) l 1814 D.
O IV-3 G
NRC to NU 11/16/79 I
i 118-5 A.
3 NU to NRC 11/08/79 V1 G
NRC to NU 11/16/79 f
lil-5 B.
1 V-2 X
NRC to NU 11/16/79 113 4 2
NRC to NU 09/02/80 VG X
NRC to NU 11/16/79 j
1 til-7 A-X NRC to NU 11/16/79 V4 G
NRC to NU 16/16/79 i
118-7 B.
3 NU to NRC 08/29/79 V-5 4
til 7 C.
X NRC to NU 11/16/79 V-6 7
NRC to NU 03/05/80 l
!II 7 D.
5 NRC to NU 01/07/81 V7 X
NRC to NU 11/16/19 i
111-8 A.
G NRC to NU 11/16/79 V-8 X
NRC to NU 11/16/79 i
j til-8 B.
G NRC to NU 09/26/80 V-9 X
NRC to NU 11/16/79 i
111-8 C.
6 NU to NRC 01/31/80 V-10 A.
7 NU to NRC 03/05/79
[
111-8 D.
G NRC to NU 11/16/79 V-10 B.
5(Sys)
NRO to NU 11/14/80 i
lil-9 G
NRC to NU 11/16/79 V-11 A.
5(Sys)
NRC to NU 11/14/80 5(Elec) NRC to NU 01/13/80 11110 A.
5 NRC to NU 01/13/80 V-11 B.
5(Sys)
NRC to NU 11/14/80 0(Elec) f 2 27
I MILLSTONE 1 i
i TOPIC NO.
STATUS HEMAltKS TOPIC NO.
STATUS IIEMARKS V 12 A.
7 NRC to NU 12/17/79 VI 7 D.
G NRC to NU 11/16/79 l
V 13 G
NRC to NU 11/16/79 VI-7 E.
X NRC to NU 11/16/79 I
\\
l VI1 3
NU to NRC 10/10/80 VI-7 F.
X NRC to NU 11/16/79 l
VI-2 A.
G NRC'sNU 11/16/79 VI-8 G
NRC 'o NU 09/26/80 I
VI-2 8.
G NRC to NU 11/16/79 VI-9 X
NRC to NU 11/16/79 l
VI 2 C.
X NRC to NU 11/16/79 VI 10 A.
O
{
VI-2 D.
2 VI 10 B.
6(Sys)
NU to NRC 04/27/79 1
7(Elec)
{
VI-3 2
Vil-1 A.
2 NRC to NU 01/24/81 l
V14 g(sy,)
Vll 1 B.
G NRC to NU 11/16/79 l
2(Elec)
NRC to NU 12/08/80 l
VI-5 3
NU to NRC 11/28/79 Vll 2 2
NRC to NU 01/24/81 l
i Vl4 G
NRC to NU 11/16/79 Val 3 5(Sys)
NRC to NU 11/14/80 l
O(Elec)
VI-7 A.1.
X NRC to NU 11/16/79 Vil4 G
NRC to NU 11/16/79 VI-7 A. 2.
X NRC to NU 11/16/79 Val-5 G
NRC to NU 11/16/79 VI-7 A. 3.
O Vil4 G
NRC to NU 11/16/79 VI-7 A. 4.
G NRC to NU 11/16/79 Vil 7 X
NRC to NU 11/16/79 VI 7 B.
X NRC to NU 11/16/79 Vlli-1 A.
G NRC to NU 11/16/79 VI 7 C.
o Vill 2 5
NRC to MU 03/20/80 Vill 3 A.
7 NRC to NU 04/18/79 VI 7 C.1.
5 NRC to NU 01/13/81 VI 7 C. 2.
o Vill 3 B.
5 NRC to NU 01/13/81 VI-7 C. 3.
X NRC to NU 11/16/79 Vill 4 7
NRC to NU 10/30/80
{
2 28 l
t i
1
h 9
9 9
9 9
9 9
0 9
7 7
7 7
7 7
8 7
0
/
/
/
/
/
/
/
/
6 6
6 6
6 6
6 5
6 1
1 1
1 1
1 1
0 1
/
/
/
/
/
/
/
/
/
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
U U
U U
U U
U U
U S
N N
N N
N N
N N
N K
H o
o o
o o
o o
o o
t t
t t
t t
t t
t A
C C
C C
C C
C C
C M
R R
R R
R R
R R
R N
N N
N N
N N
N N
E H
)
)
)
s s
s e
e e
S
)
s
)
s
)
s s
s s
U yo yo yo T
goo (
o 0
0 X
(SD( (0O( 0 G
G X
G X
G sD SD A
X 0
X OO T
S O.N 0
1 2
3 4
5 6
7 8
9 0
1 2
3 4
C 1
1 1
1 1
1 1
1 1
1 2
2 2
2 2
l P
I i
I V
V V
V V
V V
V V
V V
V V
V V
V V
O X
X X
X X
X X
X X
X X
X X
X X
X X
T i
. 92
-2 9
9 9
9 9
9 9
9 9
9
/
/
/
/
/
0 7
7 7
7 7
7 7
7 7
/
/
/
/
6 6
6 6
6 6
6 6
6 6
1 1
1 1
1 1
1 1
1 1
/
/
/
/
/
/
/
/
/
/
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
S U
U U
U U
U U
U U
U K
N N
N N
N N
N N
N N
H o
o o
o o
o o
o o
o A
t t
t t
t t
t t
t t
M C
C C
C C
C C
C C
C E
R R
R R
R R
R R
R R
H N
N N
N N
N N
N N
N S
1 U
T A
0 G
2 X
0 G
X G
G G
G 0
X 0
0 0
X 0
0 0
T E
S N
O O
N T
CI 1
2 3
4 5
4 3
X X
X X
X X
X X
X X
X X
l 2
T I
X X
2 I'
l 1
2 J
4 5
6 7
8 9
P X
1 i
S O
I XI I
X I
I X
X I
U l
V V
V V
V V
V V
V X
LL l
i.
l OYSTER CREEK FACILITY INFORMATION topic NO.
STATUS REMARKS FACILITY: OYSTER CREEK 1 g,3 g
i LICENSEE: JERSEY CENTRAL POWER & LIGHT 1
111 B.
0 REGION / LOCATION: 9 MILES SOUTH OF TOMS RIVER, NJ.
DOCKET NO.: 05000219 111 C.
O POWER CAPACITY: 1930(THERMAL) 0650(ELECTRICAL) 112 A.
5 NRC to JCPL 12/17/80 OL NUMBER: DPR.16 112 B.
G NRC to JCPL 09/26/80 N.S.S.S.: GE.
H-O A/E FIRM: B&R KEY PERSONNEL 112 D.
G NRC to JCPL 09/26/80 R 3 A.
1 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL i
OPERATING REACTORS BRANCH CHIEF: D. CRUTCH FIE LD ll.3 B.
1 1
OPERATING RE ACTORS PROJECT MANAGER: W. PAULSON l
11-3 B.1.
1 l
113 C.
1 l
KEY FOR STATUS CODES 11-4 5
NUREG/CR-1582 08/80 i
G - GENE"lC 3 - OUESTION RESPONSE 114 A.
5 NUREG/CR 1582 08/80 RECEIVED BY NRC 4 - DR AFT SE RECEIVED 11-4 C.
5 NUR EG/CR-1582 OP ' ')
0 - TOPIC NOT FROM REVIEW RHANCH ST AR T E D H
D.
0 5 - DRAFT SE SENT TO 1 - OUESTIONS RECEIVED UTILITY FROM REVIEW BR ANCH l
6 - SE RESPONSE RECEIVED 114 F*
0 2 - OUESTIONS SENT TO BY NRC UTILITY lil 1 3(3ys) 7 - TOPIC COMPLETE 0(Elec) lil-2 3
JORLas NRC 12/07/79 2-30 l
OYSTER CREEK I
TOPIC NO.
STATUS REM AflKS TOPIC NO.
ST ATIJS IIE M AllV.S 1113 A.
3 JCPL to NRC 12/0709 11110 B.
X NRC to JCPL 11/16/79 1810 B.
X NRC to JCPL 12/26/80 111-10 C.
O l
lil 3 C.
O Hl.11 3
i 1814 A.
0 31112 3
JCPL to NRC 10/28/80 I
Ill4 B-0 IV 1 A.
7 NRC to JCPL 07/10/79 1
1114 C.
2 NRC to JCPL 01/19/81 IV 2 2
NRC to JCPL 12/15/80 18I4 D.
O IV.3 X
NRC to JCPL 11/16/79 111-5 A.
1 V1 G
NRC to JCPL 11/16/79 Ill-5 B.
7 NRC to JCPL 07/10/80 V2 X
NRC to JCPL 11/16/79 Ill-6 4
V4 X
NRC to JCPL 11/16/79 4
IH-7 A X
NHC to JCPL 11/16/79 V4 G
NFIC to JCPl.
11/16/79 l
Ill 7 B.
3 JCPL to NRC 12/07/79 V5 4
111-7 C.
X NRC to JCPL 11/16/79 V-6 7
NRC to JCPL 03/05/80 til 7 D.
3 JC"L to NRC 12/07/19 V7 X
NRC to JCPL 11/16/79 i
IH8A o
j NRC to JCPL 11/16/79 V-8 X
NRC to JCPL 11/16/79 IH-8 B.
X NRC to JCPL 09/26/80 V-9 X
NRC to JCPL 11/16/79 111-8 C.
7
,- HC to JCPL 10/30/80 V 10 A.
7 JCPL to NRC 05/15/79 til-8 D.
G NRC to JCPL 11/16/79 V 10 B.
7(Sys)
NRC to JCPL 09/25/B0 111-9 o
NRC to JCPL 11/16/79 V 11 A.
7 NRC to JCPL '12/15/80 lH 10 A.
7 NRC to JCPL 12/15/80 V 11 B.
7(Sys)
NRC to JCPL 09/25/80 O(Elec) 2-31 i
I
OYSTER CREEK TOPIC No.
S T A I LIS lit Malt KS TOPIC NO.
SI Al t1S tit Malt KS i
V 12 A.
4 VI 7 D.
G NRC to JCPL 11/16/79 V 13 G
NRC to JCPL 11/16/79 VI-7 E.
X NilC to JCPL 11/16/79 Vl1 2
NRC to JCPL 06/06/79 VI 7 F.
X NRC to JCPL 11/16/79 I
t i
VI-2 A.
G NRC to JCPL 11/16/79 VI 8 G
NRC to JCPL 09/26/80 VI-2 B-G NRC to JCPL 11/16/79 VI-9 X
Nf1C to JCPL 11/16/79 VI-2 C.
X NRC to JCPL 11/16/19 VI-10 A-0 VI 10 B.
X NRC to JCPL 11/16/79 VI-2 D.
2 VI-3 2
Vll1 A.
2 NFIC to JCPL 12/26/80 V14 0(Sys)
Vil1 B.
G NitC to JCPL 11/16/79 2(Elec) NRCt o JCPL 12/08/80 j
VI-5 1
Vil 2 0
VI-6 G
NFIC to JCPL 11/16/79 Vll 3 7(Sys)
NFIC to JCPL 09/25/80 l
O(Elec)
VI 7 A.1.
X NRC to JCPL 11/16/79 Vil4 G
NitC to JCPL 11/16/79 i
VI-7 A. 2.
X NFIC to JCPL 11/16/79 Vil-5 G
NFIC to JCPL 11/16/79 VI-7 A. 3.
O Vil6 G
NRC to JCPL 11/16/79 VI 7 A. 4.
G NRC to JCPL 11/16/79 Vll 7 X
NRC to JCPL 11/16/19 VI-7 B.
X NRC to JCPL 11/16/79 Vill 1 A.
G NRC to JCPL 11/16/79
)
VI-7 C.
O Vill 2 7
NilC to JCPL 12/26/80 VI 7 C.1.
7 NRC to JCPL 12/15/80 Vill 3 A.
7 NRC to JCPL 01/16/81 l
VI-7 C. 2.
7 Vill-3 B.
7 NflC to JCPL 12/15/80 VI 7 C. 3.
X NRC to JCPL 11/16/79 Vill 4 7
NRC to JCPL 12/15/80 2-32 i
i OYSTER CREEK t
l IOl*lC NO.
$1 AltlS lit M AltKS lOl'IC NO.
SI AltlS lit MAltKS i
IX 1 3
JCPL to NHC 12/14/79 XV 10 X
NHC to JCPL 11/16/79
)
IX 2 o
NHC to JCPL 11/16/79 XV 11 0
l IX 3 4
XV 12 X
NRC to JCPL 11/16/79 IX4 X
NHC to JCPL 11/16/79 XV 13 0(Doses)
O(Sys)
IX 5 0
XV 14 0
4 IX-6 G
NHC to JCPL 11/16/79 XV15 0
X X
NHC to JCPL 11/16f/9 XV 16 0
XI 1 a
NHC to JCPL 11/16/79 XV 17 X
NilC to JCPL 11/16/79 XI-2 G
NilC to JCPL 11/16/79 XV 18 0(Doses)
O(Sys)
XHl1 G
NHC to JCPL 11/16/79 XV 19 Ohioses)
O(Sys)
XIH 2 O
NilC to JCPL 11/16/79 XV 20 0
XV1 0
XV-21 G
NHC to JCPL 11/16/79 XV 2 X
NHC to JCPL 11/16/79 XV-22 G
Ni1C to JCPL 11/16/79 XV3 0
XV 23 X
NHC to JCPL 11/16/79 i
XV4 0
XV-24 O
NHC to JCPL 11/16/79 XV5 0
XVI X
NHC to JCPL 11/05/80 I
XV6 X
NHC to JCPL 11/16/79 XV l G
NitC to JCPL 11/1G/79 XV 7 0
l XV8 0
j 4
XV-9 0
2 33 I
-ALISADES i
{
r ACit.lTY INI Ol1MATION ggp,c go, sg3 ills lig unligs 1
FACILITY: PALISADES 11 1 A.
7 CPCo to NitC 12/28/79 LICENSEE: CONSUMEllS POWIll 111 D.
7 CPCo to NHC 12/28/10 HEGION/ LOCATION: 5 MILES SOUTH OF SOUTil ll AVENv Mt.
1 DOCK E T NO.i 00000255 11 1 C.
7 CPCo to NitC' 12/28/19 POWEll CAPALITY: 2f>30(IllEllMAL) 000$(ELE CTitl CAL) 112 A.
5 NitC to CPCo 11/21/80 1
OL NUMilEla: ppil.20 g
N.S.S S.
CE 112 C.
6 CPCo to NltC 04/06/19 A/E FiftM: DE Cil.
Il2 D.
G NHC to CPCo 10/01/80 KE Y_ l'I:llSONNijt.
"' ^'
SYSTEMATIC EVALUATION PHOGilAM fillANCH CHl[I: W. ItOSSE L L CPEll ATING llE ACTOll5 lift ANCH CillEF: D. ClluiCHi lE LD 113 B 4
OPEllATING HE ACTORS PHOJECT MANAGEll: T. WAMDACil gg 3 gg, y, 4
1 i
113 C.
4 KEY I'Olt ST A1US CODI:S 11 4 b
N Ulti G/ Cit.1582 08/H0 l
1 114 A.
5 NUllEG/CH 15n2 011/80 0 GI NIIHC 3 - 000 silon Ill SPONSI 111 ClIVI O HY NitC 114 11.
6 N Ulti G/ Cit -1f,82 08/80 4 - Dit AF i St Ill ClIVE D Il 4 C.
G N UHI G/ Cit.1bil2 08/80 0 - TOPIC NOT T HOM 141 Vil'W lill ANCil SI Altil D H 4 D.
3 fi - Dil Al T SI St NI 10 1 - Olli SilONS fil Cl IVI D 1811111 Y f itOM lli Vil W lilt ANCll is - Si iti SPONSI Ill Cl IVI O 3
2 - Out SIIONS S1 NI IO ltY NHC O I H. II Y 111 1 7(Iloc) NitC to CPCo 11/12/00 i
1 - TOPIC COMPI I il 2(Sys) NitC to Clw 12/15/U0 lil 2 3
CPCo to NHC 12/14/19
(
2 34 i
I'.
}
i 1
l PALISADES TOPIC NO.
STATUS HLMARKS TOPIC NO.
STATUS IIEMARKS
]
Ill-3 A.
3 CPCo to NRC 12/04/80 18110 B.
7 NRC to CPCo W31/80
]
181-3 B.
X NRC to CPCo 12/26/80 11110 C.
X NRC to CPCo 11/16/79 1113 C.
O 11111 5
NRC to CPCo 01/19/81 i
1114 A.
4(AEB) 11112 3
CPCo to NRC 10/07/80 1
3(SEB) CPCo to N RC 12/04/80 ii til-4 B.
3(MTEB) CPCo to NRC 12/04/80 IV 1 A.
7 CPLo to NRC 02/08/79 1
3(SEB) CPCo to NRC 12/04/80 1114 C.
2(RSB) NRC to CPCo 12/26/80 IV.2 2
3(SEB) CPCo to NRC 12/04/80 1114 D.
5 NRC to CPCo 01/13/81 IV 3 X
NRC to CPCo 11/16/79 l
181-5 A.
2 NRC to uPCo 01/11/79 V.1 G
NRC to CPCo 11/16/79 111-5 B.
1 V.2 X
NRC to CPCo 11/16/79 til-6 5
NRC to CPCo 01/19/81 V-3 G
NRC to CECO 11/16/79
{
lll7 A.
G NRC to CPCo 11/16/79 V4 G
NRC to CPCo 11/16/79 l
l Ill 7 B.
3 CPCo to NRC 12/14/79 V5 4
i j
til 7 C.
3 CPCo to NRC 12/14/79 V-6 7
NRC to CRCo 03/0?i/80
{
111-7 D.
3 CPCo to NRC 12/14/79 V.7 G
NRC to CPCo 11/16/79 y
1118 A.
G NRC to CPCo 11/16/79 V-8 G
NRC to CPCo 11/16/79 111-8 B-X V.9 X
NRC to CPCo 11/16/19 l
j 111-8 C.
7 CPCo to NRC 12/28/79 V 10 A.
7 NRC to CPCo 04/21/79 j
111-8 D.
G NRC to CPCo 11/16/79 V 10 B.
7(Sys) NRC to CPCo 11/05/80 111-9 G
NRC to CPCo 11/16/79 V 11 A.
7(Sys) NRC to CPCo 11/05/80 7(Elec) NRC to CPCo 09/15/80 11110 A.
7 N RC to CPCo 12/31/80 V 11 B.
7(Sys) NRC to CPCo 11/05/80 7(Elec) NRC to CPCo 09/15/80 l
2-35
-. - ~. - - _ _ -
I PALISADES i
10riC NO.
STATUS Iti MAllKS TOPIC NO STA!US itEMAltKS t
V 12 A X
NRC to CPCo 11/16D9 VI 7 D.
O NRC to CPCo 11/16/79 l
1 V 13 G
NRC to CPCo 11/16/79 VI 7 E.
G NRC to CPCo 11/1609 l
i l
VI-1 4
VI-7 F.
7 NRC to CPCo 12/31/80
)
f
{
VI-2 A.
X NRC to CPCo 11/16/79 VI8 G
l VI-2 B.
G NRC to CPCo 11/16D9 VI9 X
NRC to CPCo 11/16# 9 I
VI 2 C.
X NRC to CPCo 11/16/79 VI 10 A.
7 NRC to CPCo 11/12/80 VI-2 D.
3 CPCo to NRC 04/02/80 VI-10 8.
X NRC to CPCo 11/16R9 Vl3 2
CPCo to NRC 04/02/80 Vll.1 A.
7 NRC to CPCo 11/12/80 Vl4 4(El&C)
Vll.1 B.
G NRC to CPCo 11/16/79 3(MECH) CPCo to P,PC 10/16/80 VI-5 2
NRC *J CPCo 04/30/79 Vll 2 7
NRC to CPCo 11/12/80 7(Sys)
NRC to CPCo 11/05/80 i
Vl4 G
NFIC to CPCo 11/16/79 Vil 3 5(Elec) NRC to CPCo 01/24/81 l
VI 7 A.1.
X NRC to CPCo 11/16/79 Vil4 G
NRC to CPCo 11/1609 i
VI.7 A. 2.
X NflC to CPCo 11/16/79 Vll 5 n
NRC to CPCo 11/16/79 VI-7 A. 3.
7 NRC to CPCo 11/12/80 Vil4 o
NRC to CPCo 11/16/79 VI 7 A. 4.
X NRC to CPCo 11/16n9 Vll 7 X
NRC to CPCo 11/16/79 VI 7 B.
7(Elec) NRC to CPCo 11/12/80 Vill 1 A.
O NRC to CPCo 11/16/79 j
O(Sys) l VI 7 C.
7 Amendnwnt 21 to DPR 20 Vill-2 7
NRC to CPCo 09/15/80 i
VI 7 C.1.
5 NRC to CPCo 11/18/80 Vill 3 A.
7 NilC to CPCo 01/28/81 VI-7 C. 2.
7 Amendment 21 to Vill 3 B.
7 N RC to CPCo 12/31/80 j
DPR-20 j
VI 7 C. 3.
X CFJo to NRC 12/12/79 Vill 4 7
NRC to CPCo 12/31/80 2-36 1
r.
y_.-,_._-_
J i
i PALISADES 1
1 i
i TOPIC NO.
ST A T US ItLMAltKS TOPlc NO.
STATUS ltEMAltKS l
IX 1 2
NRC to CPCo 01/29/81 XV 10 4
IX 2 G
NRC to CPCo 11/16/79 XV 11 X
NRC to CPCo 10/01/80 j
IX 3 3
CPCo to NRC 12/27/79 XV 12 7(Doces) NRC to CPCo 01/29/80
)
4(Syst)
IX4 2
NRC to CPCo 12/26/80 XV-13 X
NRC to CPCo 11/16/79 IX-5 2
NRC to CPCo 01/29/81 XV 14 4
IX4 G
NRC to CPCo 11/16/79 XV 15 4
X 0
XV 16 7
NRC to CPCo 12/31/80 XI-1 G
NRC to CPCo 11/16/79 XV 17 7(Doses) NRC to CPCo 01/29/80 4(Syst)
XI 2 G
NRC to CPCo 11/16/79 XV 18 X
NRC to CPCo 10/01/80 X1tl 1 G
NRC to CPCo 11/16/79 XV-19 7(Doses) NRC to CPCo 11/21/80 4(Syst)
Xill-2 G
NRC to CPCo 11/16/79 XV 20 7
NRC to CPCo 11/21/80 XV-1 4
XV-21 G
NRC to CPCo 11/16/79 XV2 7(Doses) NRC to CPCo 01/29/80 XV-22 G
NRC to CPCo 11/16/79 4
XV3 4
XV-23 G
NRC to CPCo 11/16/79 XV4 4
XV-24 G
NRC to CPCo 11/16/79 XV-5 4
XVI X
NRC to CPCo 11/05/80 XV-6 4
XVil G
NRC to CPCo 11/16/39 XV7 4
i XV-8 4
i XV-9 4
1, 2-37
l SAN ONOFRE_- -
FACilli'Y INFOilMATION Toric NO.
SIATUS IIL M AllKS l
l FACILITY: SAN ONOFRE 1 Il 1 A.
7 NRC to SCE 11/07/79 LICENSEE: SOUTHERN CALIFORNIA EDISON l
11 1.a.
7 NRC to SCE 11/07/19 REGION / LOCATION: 5 MILES SOUTH OF SAN CLEMENTE, CA, I
t 0709 OOCKET NO.: 05000206 i
l POWER CAPACITY: 1347(THERMAL) 0430(ELECTRICAll 11-2 A.
6 SCE to NRC 01/26/81 i
OL isaMBE R: Dres.13 Il-2 B.
G NRC to SCE 10/01/80 N.S.S.S. : WEST.
l Il 2 C.
6 SCE to NRC 04/23/19
(
A/E FIRM; DECH.
l.2 O.
O NRC to SCO 10/01/30 SOMQ R-3 Ste Visit 07/18/78 SYSTEMATIC EVALUAT iN PROGFIAM DRANCH CHIEF: W. FIUSSELL OPERATING REACTORS BRANCH CHIEF: D. t AUTCHFIELD 11-3 B.
3 Site Visit 07/18/78 OPERATING REACTORS PROJECT MANAGER: S. NOWICK1 113 D.1 3
Site Visit 07/18/78 i
113 C.
3 Site Visit 07/18/78 KEY FOR STA1US CODES 11 4 5
NUREG 0712 12/80 G - GE N[IllC 3 - OlliSilON lit SPONSE' lit CEIVFD fly NitC 114 B.
5 NUllEG 0712 12/80 X - DELE TED 4 - Dil AI T SF flICFIVID 114 C.
5 NUREG 0712 12/80 0 - topic NOT FIlOM llFVlf W lill ANCH ST AllT E D 144 D.
O r - DilAF i SF St NT TO 1 - OUIST10NS flIC[lVf f)
IJ14LIIY ll 4 E.
X NRC to SCE 11/16/19 filOM llEVit W Illl ANCil j
G. SL fil.SPONSE flI CflVID l
114 F.
O 2 OtJESilONS St N T TO RY NRC UilLITY lil 1 3(Sysl SCE to NFIC 08/29/79 7
Toric COMPI E 80 0(ICS) til 2 3
SCE to NFIC 09/08/80 2 38 l
i
SAN ON0FRE l
l TOPIC NO.
STATUS REMARKS TOPIC NO.
STATUS REMARKS l
lil-3 A.
3 SCE to NRC 09/DE/80 11110 B.
7 NRC to SCE 11/08/79
[
111-3 B.
X NRC to SCE 11/16/79 11110 C.
X NRC to SCE 11/16/79 I
1113 C.
O 11111 3
~
lil4 A.
3 SCE to NRC 08/14/79 nl.12 3
SCE to NRC 10/31/80 llW B.
6 SCE to NRC 03/05/79 IV-1 A.
7 NRC to SCE 07/19/79 d
1814 C.
OIRSB)
IV.2 2
NRC to SCE 12/15/80 O(SEB) 1184 D.
O X
NRC to SCE 11/16/79 IV.3 1115 A.
1 V.1 G
NRC to SCE 11/16/79 111-5 B.
2 NRC to SCE 01/04/80 v.2 X
NRC to SCE 11/16/79 ll14 3
V-3 G
NRC to SCE 11/16/79 1117 A.
X NRC to SCE 11/16/79 V4 G
NRC to SCE 11/16/79 lil-7 B.
3 SCE to NRC 09/08/80 v.5 4
til 7 C.
X NRC to SCE 11/16/79 V4 7
NRC to SCE 03/05/80 l
l lil 7 D.
O V7 G
NRC to SCE 11/16/79 l
lil-8 A.
G NRC to SCE 11/16/79 v.8 G
NRC to SCE 11/16/79 111-8 B.
X NRC to SCE 10/01/80 v.9 X
NRC to SCE 11/16/79 111-8 C.
7 NRC to SCE 01/29/80 v.10 A.
7 NRC to SCE 01/07/81 lil-8 D.
G NRC to SCE 11/16/79 v.10 B.
6(Sys)
SCE to NRC 07/31/80 111 9 G
NRC toECE 11/16/79 v.11 A.
5(Elec)
NRC to SCE 01/07/81 6(Sys)
SCE to NRC 07/31/80 11110 A.
7 SCE to NRC 09/22/80 v.11 B.
6(Sys)
SCE to NRC 07/31/80 O(Elec) 2-39
SAN ONOFRE TOPIC NO.
STATUS It[MAltKS TOPIC NO.
ST ATUS HLMAHKS l
V 12 A.
X NRC to SCE 11/16/79 VI 7 D.
G NRC to SCE 11/16/79 l
V 13 G
NRC to SCE 11/1609 VI 7 E.
G NRC to SCE 11/16/79 l
VI.1 3
SCE to NRC 08/03/79 VI-7 F.
X NRC to SCE 11/16/79 VI-2 A.
X NRC to SCE 11/16/79 VI8 G
NRC to SCE 10/01/80 VI-2 B.
G NRC to SCE 11/16/79 VI9 X
NRC to SCE 11/16/79 VI-2 C.
X NRC to SCE 11/16/79 VI 10 A.
0 l
VI-2 D.
2 V110 B.
7(Sys)
NRC to SCE 11/15/79
(
7(Elec)
NRC to SCE 11/15/79 VI 3 2
Vll-1 A-0 VI-4 O(Mech)
Vil 1 B.
G NRC to SCE 11/16/79 k
l 7(Elec)
VI-5 1
Vll-2 0
l Vl4 G
NRC to SCE 11/16/29 Vil-3 6(Sys)
SCE to NRC 07/31/80 1(Elect VI 7 A.1.
7 NRC to SCE 04/01/77 Vil4 G
NRC to SCE 11/16/79 VI 7 A. 2.
X NRC fa SCB 11/16/79 Vil-5 G
NRC to SCE 11/16/79 VI.7 A. 3.
O Vil4 G
NRC to SCE 11/1609 VI-7 A. 4.
X NRC to SCE 11/16/79 Vil 7 X
NRC to SCE 11/1609
}
VI 7 B.
3(Sys)
Vill 1 A.
G NRC to SCE 11/16R9 2tElec)
NRC to SCE 09/16/80 j
VI-7 C.
O Vill 2 4
VI-7 C.1.
7 SCE to NRC 09/22/80 Vill 3 A.
7 NRC to SCE 11/07/79 VI 7 C. 2.
O Vill-3 B.
7 NRC to SCE 01/28/81 i
l VI-7 C. 3.
X NPC to SCE 11/16D9 Vill 4 4
240 t
i
i SAN ON0FRE l
IOl'IC NO.
STAllis ill M Alt K S IOl*lC NO.
SI AlllS fil M Alt K S
}
IX 1 3
SCE to NitC 10/05/19 XV 10 0
l IX 2 G
NFIC to SCE 11/16/19 XV.11 X
NitC to SCE 10/01/80 l
IX-3 2
XV 12 O(Sys) j 7(Doses) NitC to SCE 01/29/80 l
f IX4 0
XV 13 X
NftC to SCE 11/16/79 i
IX 5 0
XV 14 0
[
IX C G
NitC to SCE 11/16/79 XV 15 0
X 0
XV 16 1
l i
XI.1 G
NitC to SCE 11/16/79 XV 17 O(Sys) 7(Doems) NitC to SCE 01/29/80 j
i XI 2 O
Pr.' to SCE 11/16/79 XV 18 X
NItC to SCE 10/01/80 4
i Xill.1 G
NitC to SCE 11/16/19 XV 19 0(Sys) l 7(Doses) NitC to SCE 01/29/80 Xill-2 O
NitC to SCE 11/14/79 XV 20 7
NitC to SCE 03/28/80 XV1 0
XV-21 G
NitC to SCE 11/16/79
]
i XV 2 O(Sys)
XV 22 G
NitC to SCE 11/16/79 7(unes) NitC to SCE 01/29/80 1
XV.3 0
XV 23 X
NltC to SCE 11/16/19 l
XV4 0
XV 24 G
NItC to SCE 11/16/19 l
XV5 0
XVI X
NitC to SCE 11/05/80
(
l XV6 0
XVil G
NitC to SCE 11/16/19 i
f j
XV7 0
[
l I
xvs 0
j t
XV9 0
l l
l j
2 41 I
i
)
YANKEE R0WE
]
FACILITY INFORMATION TOPIC NO.
STATUS REMARKS jl FACILITY: YANKEE ROWE 1 11-1 A.
O l
t LICENSEE: YANKEE ATOMIC ELECTRIC H-1 B.
O REGION / LOCATION: 25 MILES NORTH EAST OF PITTSFIELD, MASS.
DOCKET NO.: 05000029 Il 1 C.
O POWER CAPACITY: 600(THERMAL) 175(ELECTRICAL) 11-2 A.
5 NRC to YAEC 12/17/80 j
1 112 B.
G NRC to YAEC 10/01/80 N.S.S.S.: WEST.
1I 2 C.
O A/E FIRM: S&W 11-2 D.
G NRC to YAEC 10/01/80 KEY PERSONNEL 11-3 A.
4 l
I l
SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL OPERATING REACTORS BRANCH CHIEF: D. CRUTCH FIE LD 113 B.
4 OPERATING REACTORS PROJECT MANAGER: R.CARUSO 18-3 B. 1.
4 113 C.
3 Site Visit KEY FOR STATUS CODES 11-4 5
NUREG/CR 1582 08/80 114 A-5 NUREG/CR 1582 08/80 G - GENERIC 3 - OUESTION RESPONSE flECEIVED BY NRC 11-4 B.
5 NUREG/CR 1582 08/80 X ~ DELETED 4 - DRAFT SE RECEIVED 114 C.
5 NUREG/CR-1582 08/80 0 - TOPlL NOT FROM REVIEW RRANCH ST ARTE D H4 D.
3 Site Visit 5 - DRAFT SE SENT TO 1 - OUEST10NS ;'tECEIVED U TILITY FROM REVIEW BRANCH 6 - SE flESPONSE flECEIVED I
Ste Visit 2 - OUEST10NS SENT TO BY NRC UTILITY lil 1 0(EICS) 7 - TOPIC COMPLETE 3(Sys)
YAEC to NRC 01/31/79 l
188 0 3
YAEC to NRC 09/06/79
~
1 I,
2-42 l
YANKEE R0WE TOPIC NO.
STATUS flEM AR KS TOPIC NO.
STA1US REMARKS til 3 A.
- l YAEC to NRC 09/06/79 11110 B.
X NRC to YAEC 11/16/79 til-3 B.
3:
NRC to YAEC 12/26/80 11110 C.
X NRC to YAEC 11/16/79 til-3 C.
0 11111 3
1914 A.
0(AEB) 111-1 2 3
YAEC to NRC 10/31/80 O(SEB) 1814 B.
0(MTEB)
IV 1 A.
7 NRC to YAEC 04/18/79 O(SEB) 1814 C.
0(RSB)
IV-2 2
NRC to YAEC 12/15/80 0(SEB) 1814 D.
O IV 3 X
NRC to YAEC 11/16/79 til.5 A.
2 NRC to YAEC 01/04/80 V.1 G
NRC to YAEC 11/16/79 til-5 B.
1 V-2 X
NRC to YAEC 11/16/79 111-6 2
NRC to YAEC 08/04/80 V3 G
NRC to YAEC 11/1609 til-7 A.
X NRC to YAEC 11/16/79 V4 G
NRC to YAEC 11/1609 111-7 B-3 YAEC to NRC 09/06/19 V5 5
NRC to YAEC 01/24/80 1117 C.
X NRC to YAEO
? f /16/79 V-6 7
NRC to YAEC 03/05/80 1117 D.
3 NRC to YAEC 11/16/79 V-7 G
NRC to YAEC 11/16/79 111-8 A.
G NRC to YAEC 11/16/79 V-8 G
NRC to YAEC 11/16/19 lil-8 B.
X NRC to YAEC 10/01/80 V9 X
NRC to YAEC 11/1609 181-8 C.
7 NRC to YAEC 11/15/79 V 10 A.
7 NRC to YAEC 11/05/79 111-8 D.
G NRC to YAEC 11/16/79 V 10 B.
6(Sys)
YAEC to NRC 04/13/79 111-9 G
NRC to YAEC 11/16/79 V-11 A.
7 NRC to YAEC 12/08/80 111-10 A.
7 NRC to YAEC 12/08/80 V 11 B.
6(Sys)
YAEC to NRC 04/1309 O(Elec) 243
YANKEE R0WE i
i f
TOPIC NO.
STATUS HLMAHKS TOPIC fJO.
STATUS HEMARKS V 12 A-X NRC to YAEC 11/16/79 VI-7 D.
G NRC to YAEC 11/16/79 I
I V.13 G
NRC to YAEC 11/16/M VI 7 E.
G NRC to YAEC 11/16/79
[
VI1 3
YAEC to NRC 06/26/79 VI 7 F.
7 NRC to YAEC 12/08/80 l
VI-2 A.
X NRC to YAEC 11/16/79 VI-8 G
NRC to YAEC 10/01/80
}
j VI-2 B.
G NRC to YAEC 11/16/79 VI-9 X
NRC to YAEC 11/16/79 VI 2 C.
X NRC to YAEC 11/16/79 VI 10 A.
O s
I i
VI-2 D.
2 VI 10 B.
X NRC to YAEC 11/16/79 l
l VI3 2
Vll 1 A.
O i
Vi4 O (Sys)
Vll 18-G NRC to YAEC 11/16/79 f
7(Elec)
NRC to YAEC 12/08/80 VI-5 2
NRC to YAEC 05/01/79 Vll 2 0
V14 G
NRC to YAEC 11/16/79 Vil 3 6(Sys)
YAEC to NRC 04/13/79 O(Elec)
VI 7 A.1 7
NRC to YAEC 01/10/77 Vil4 G
NRC to YAEC 04/16/79 VI-7 A. 2.
X NRC to YAEC 11/16/79 Vil-5 G
NRC to YAEC 04/1609 i
VI-7 A. 3.
O Vil4 G
NRC to YAEC 04/16/79 i
VI 7 A. 4 X
NRC to YAEC 11/16/79 Vil 7 X
NRC to YAEC 11/16/79 VI 7 B.
O Vill 1 A.
G NRC to YAEC 04/16/79 l
t VI-7 C.
O Viti-2 7
NRC to YAEC 12/08/80 VI-7 C.1.
7 NRC to YAEC 12/08/80 Vill-3 A.
7 NRC to YAEC 11/07/79 VI-7 C. 2.
O Vill-3 B.
5 NRC to YAEC 12/15/80 VI-7 C. 3.
5 NRC to YAEC 07/24/80 Vill 4 0
s 244 I
YANKEE RGWE l
topic NO.
STATUS HLMAltKS IOPIC NO.
ST AltJS itLM AH KS IX 1 0
XV 10 o
I*'
G NRC to YAEC 11/16/79 XV 11 X
NRC to YAEC 10/01/80 IX 3 2
XV 12 o(sys) 0(Doses)
IM XV 13 X
NRC to YAEC 11/16/79
(
0 IX-5 0
XV-14 0
G NRC to YAEC 04/16/79 XV15 o
l X
XV 16 0
0 G
NRC to YAEC 04/16/79 XV 17 o(Sys)
O(Doses)
XV 18 X
NRC to YAEC 10/01/80 G
NRC to YAEC 11/16/79 XUI'I XV 19 0(Sys)
G NRC to YAEC 11/16/79
- ~
0(Doses)
Xill-2 XV 20 5
NRC to YAEC 03/07/80 G
NRC to YAEC 11/16/79 XV-1 XV 21 G
NRC to YAEC 11/16/79 0
XV1 XV 22 G
NRC to YAEC 11/16/79 O(Sys)
O(Doses) 0 XV 23 G
NRC to YAEC 11/16/79 0
XV 24 G
NRC to YAEC 11/16/79 XV-5 XVI X
NRC to YAEC 11/05/80 0
XV-6 0
XVil G
NRC to YAEC 11/16/79 XV7 0
XV8 0
XV-9 0
2-45 I
[;[,*" E '
u.s. NUCLEAR REGULATORY COMMISSION BIBLIOGRAPHIC DATA SHEET NUREG-0485, Vol. 3, No. 3 1 TITLE AND SUBTITLE (Ada Vodume Na, #f appecones)
- 2. (Leare blanti Systematic Evaluation Program Status Summary Report
- 3. RECIPIENT'S ACCESSION NO.
- 7. AUTHOR (SI
- 5. DATE REPORT COMPLETED M ON TH l YEAR February 1981
- 9. PERFO?. MING ORGANIZATION N AME AND MAILING ADDRESS (Include lea Codel DATE REPORT ISSUED MONTH l YEAR Office of Management and Program Analysis February 1981 Office of Nuclear Reactor Regulation s
rt,,,,,,,,,
U.S. Nuclear Regulatory Comission Washington. D.C.
20555
- 8. (te, e u.ani
- 12. SPONSORING ORGANIZ ATION N AME AND M AILING ADDRESS I/nctuar I<a Coor) p Office of Management and Program Analysis Office of Nuclear Reactor Regulation
- u. CONTRACT NO.
U.S. Nuclear Regulatory Commission Washington, D.C.
20555
- 13. TYt'E OF REPORT PE RIOD COV E RE D (Ine/usive ases)
January 2,1981 thru February 1,1981
- 15. SUPPLEMENTARY NOTES 14 (Leave Nant/
- 16. ASSTRACT 000 words or less)
The Systematic Evaluation Program is intended to examine many safety related aspects of eleven of the older light water reactors.
This document provides the existing status of the review process including individual topic and overall completion status.
- 17. KEY WORDS AND DOCUMENT AN ALYSIS 17a DLSCRIPTORS 17e IDENTIFIE RS/OPEN-ENDE D TERMS l18. AV AILABILITY STATEMENT 19 SE CURITY CLASS (Th,s reportl 21 NO OF PAGES l
Unclassifind Unlimited 2Ynclassified ECuRiry CtASS tra,s o,,,i 22 Price s
'mCFORM 335 (7 77b u
l