05000321/LER-1981-007-03, /03L-0:on 810203 & 19,unit 1 Cable Spread Room Sprinkler Sys Was Inoperable for Period Greater than 14 Days & Special Repts Were Not Issued.Caused by Personnel Error. Personnel Reinstructed

From kanterella
(Redirected from ML19341C256)
Jump to navigation Jump to search
/03L-0:on 810203 & 19,unit 1 Cable Spread Room Sprinkler Sys Was Inoperable for Period Greater than 14 Days & Special Repts Were Not Issued.Caused by Personnel Error. Personnel Reinstructed
ML19341C256
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/19/1981
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19341C255 List:
References
LER-81-007-03L-01, LER-81-7-3L-1, NUDOCS 8103020545
Download: ML19341C256 (2)


LER-1981-007, /03L-0:on 810203 & 19,unit 1 Cable Spread Room Sprinkler Sys Was Inoperable for Period Greater than 14 Days & Special Repts Were Not Issued.Caused by Personnel Error. Personnel Reinstructed
Event date:
Report date:
3211981007R03 - NRC Website

text

-

u NRC FORM 306 U.S. NUCLEAR RECULATORY COMMISSION d (7 771 LICENSEE EVENT REPORT con Trol block: l l

l ', l l

l I

(PLEASE PRINT O'1 TYPE ALL REQUIRED INFORMATION) 6

__ g8 I G l A l E l I l H I I l@l 0< l0 l-1010101010 l-1010 l@i4 l1 11 11 I l l@l l

l@

9 LICENSEE COOE 14 15 LICENSE NuveER 26 26 LICENSE TvPE Jo ti CAT be waN'T 5ZR% LLJ@l 01 s 101010131211 1@l 01210131 a 11_l@l 012 l 1 l 918 l 1 l@

o '

7 8

60 64 OOCKET NUMBER bd 63 EVENT DATE

  1. 4 75 REPORT DATE 80 EVENT oESCRIPTION AND pro 8ABLE CONSEQUENCES h O 2 10n 2-3-81, wi th Uni t 1 in steady state pnwer operation at 1929 MWT and I

O a l on 2-19-81, wi th Uni t 2 in refuel, the cable spread room sprinkler sys-l iltems had been -inoperable for a period of greater than 14 33ys and Spec-I; 0 4

~ 10151lial Reports had not been issued as requi're-d by Tech Specs sections 3.13.31 anonrepetitiveoccurrence,hnd there were no 1-1~IOisI_1and 3.7.6.2.

This is

- IO l71 leffects on public health or safety.

I;

- Lo_UU l I

80 7

8g E

CO E S BC E COMPONENT CODE SUB C dE S

E 8

I A l B l@ [A_j@ l XI@ l Z l Z l Z I Z I Z l Z l@ [Z_j@. LZ_l @

7 8

9 to 11 12 13 18 19 20 i

SEQUENTIAL OCCURRENCE REPORT REVISION M '*

LER EVENT YE AR REPORT NO.

COOE TYPE' N O.

@,agg/RO I 81 Il l-l 10 10 17 i M

I013i LL_]

L--J LO_J 21 22 23 24 26 27 28 29 30 31 32 n

T N AC O ON PL NT M

HOURS

~ SS IT D FOR 8.

SU L R MANUFACTURER [H_j@lH l@

l Zl@

M@

l 01 0l 01 01 l Yl@

! N i@

IZ l@

lZ 19 19 19 l @ '

22 24 as w

ai

.0 di 42 A2-a 47 CAUSE oESCRIPTioN AND CORRECTIVE ACTIONS 27 E ISorinkler system.s for the cable scread room had been isolated to allow I

\\

i i Imodification work to be performed.

There wasia failure to track the LCol Icondition to_ insure submittal of a Special -Report within the required I

-._i ?

h@.1 time frame.. Pers66~h51 were reinstructed wi th recard to res ponsibil;i t'ies f r *

. 8 Ifor trackina LCO conditions.

I 7

8 LD 80 A

% POWE R OTHP.1 STATUG is O RY

. DISCOVERY OESCRIPTION LE.}@ I01719 l@l NA l

l Zl@l l

i s u

o a

4s 80 S g,,,,,,

cgg,,,,

7 RELEASED OF RELEASE AMOUNT OF ACTIVITY

~

LOCATION OF RELEASE h['TlT) L7J @ LZ_l@l NA l

l NA l

,ERSO~~Et Ex,OSSES DESCRiPTice@

NUMBER Tv,E l ITTT110101 Ol@[ Zj@l NA l

I

,ERSO~~Et'.~;uns OtSCR PTiO~@

NUMBER l0101Ol@l NA l

8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY TYPE DESCRsPTION

[ [ TIT} [Z_j@l NA

,_j.

7" 8 9

'to 90 ITI o l_ LN_j@DESCRtPTION NA I

I l l l J_1 l l'1 I I I l.5_

ISSUE

~

[

8'f 0 3 0't07/P L

u sam t

m

t

)

O LER f:

50-321/1981-007 Licensee:

Georgia Power Company Facility Name:

Edwin I. Hatch Dccket #:

50-321

. Narrative Report for LER 50-321/1981-007

~

On 2-3-81, with the Unit 1 in steady state power operation at

- --- 19 29 MWt and on 2-19-81, with-. Unit _2 mode switch in refuel, the sprinkler systems providing protection for the cable spread room had been isolated for a period greater than 14

. days, and a Special Report had.not been submitted.

The Unit 1 sprinkler system was isolated on 1-20-81, and.the Unit 2

sprinkler system was isolated on 2-5-81, in order to implement design modifications.

.There was a failure to track the LCO condition to insure submittal of a Special Report within the O

required time frame.

Tecn Specs section 3.13.3 and 3.7.6.2 require.a Special Report if.a_.. system is not restored to opera-V Lble status within 14 days.

This is a nonrepetitive occur-e rence.

There were. no effects on public health or safety due

~

to.-this event. -


Correcti ve action consisted _of _.reinstructing... personnel with regard to responsibilities for tracking and reporting LCO

._ conditions.

l

..~

- - r -- -

l

~

7 l

n N