LER 81-002/03L-0:on 810101,more than 5 Gpm Leaked Into Drywell W/Reactor at 401 Mwe.Caused by Mechanical Seal Leaking Water from Reactor Recirculation pump,1B31-C001A. Seal Replaced
ML19341B657
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 01/27/1981
From: Nix R
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19341B656 List:
References
LER-81-002-03L, LER-81-2-3L, NUDOCS 8102030513
Download: ML19341B657 (2)


Text

PolLL F Uli I ' L I)

(1-77)

. LICENSEE EVENT REPORT CONT ROL ltLOCK: l l l I l l l (PLE ASE PRINT OH TYPE ALL HI OUlHED INF Onr.1ATION)

' 6

_ oIiIlGlAlElIlHlll@l0l0l-l0l0lOl0l0l-l0l0l@l4l1l1l1l1l@l

"'7 E 18 LICLNSE E COOL 14 IS LIC E NSE NUN'U$.H 24 /b LICE NSt i t f'E JO l

Si LAI a.a l@

l 7 m OsILi@lOl 00 t,1 5] 0] 0101312111GL01110111 DOC A E T NUYut H LA f>J EVENT DATL al 11@l01112171 a 1180I@

I4 15 HE POH T D A T E EVENT DESCHIPTION AND PROEI ABLE CONSEOUENCES l o 12 i l With the reactor at 401 fG!c, a leak of more than five (5) gpm developed l

[ o 13 l l in the Drywell . Per Tech Specs 3.6.G.1, the reactor was brought to cold [

FTG I shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. Thisisanon-r6petitiheevent. Safe plant l lo isi [ operation was not affected nor was there any effect on the health and l

[ o p, i l safety of the public. I I

1o171 1 r I

t ola 1 I

. ' C$EE ' CO

^ "o*E su'eTO5E COMPONENT CooE su'aEoE suTEot l0l9l l Cl Bl@ W@ W@ l P l U I ft l P l X l X l@ J@ [Zj @ 18 19 20 7 8 9 10 11 12 13 SE QUE N18 AL OCCURRENCE REPOnT REVISION LVLNT YE AR FIE POHT NO. CODE TVPE NO.

@ ,"LE H ROlaill g,La; L-J 1010121 1-1 I ol 31 LL_] L-J LO_J

_2l J/ 2J 24 26 21 28 23 30 31 J2 TAKER Acil

  • O fPL NT 1 ( HOURS S R ITT D FOR1 Uh. S PPLIE M A* 1JF A TUTEH C' LDJ@Lz_j@

JJ J4 lJ5A l@ lAl@

J6 l0l0l810l 3/ 40 W@ l il l@

el 42 l43fl l@ lB1518101@

44 4i CAUSE DESCRIPTION AND CORHECTIVE ACTIONS h IiloiI The cause of the event was a nechanical seal leaking water from the I li li1 i reactor recirc numo. 1B31-C001A. The seal was reDlaced. functionally I

[ ,121 l tested and returned to service. I I

11 111 l I

Ii lo i i 80 7 8 9

$T A s  % POWER OTHER ST ATUS ISC V fY DISCOVERY DESCRIPTION Operator observation I 7

i s 8

b_J@ l0l6l4l@l flA l [A_J@l A TlVITY CO TENT HF L E ASED OF HE LE ASF AMOJNT OF ACTIVITY LOCATION OF HEL EASE i o I I ti^ l i B 9 LU @ LZJ@l 10 11 r4A 44 45 80 PERSONNE L E xPOSUHES NUMHf R TYPE DE SCFH PTION I

IiI 71101010 l@l zl@l rtA

' " ' ,EnsONNJ'imuns

NUMeEn oEsCRIPTiON@

li la I 101010 j@l flA 80 l

7 ft 9 11 12 L OZ OF On D A*.' AGE 10 F ACILITY O TYPE DE SC HIP ilON ri^ l lWI IH Lz.1@l 7 9 10 B0 IZUC" L CniPTION ,

! ? I ol htJ@! tlA I I I I I I I I I I I I i 12 M 9 68 69 60 E e i 10

'810203 L L o gnc,,n,n n. T. tit x, Supt. of f*aint. pgoyg. 912-367-7781 {

3,

LER No.: 50-321/1981-002 O' Licensee: Georgia Power Company Facility Name: Edwin I. Hatch Docket No.: 50-321 Narrative Report for LER 50-321/1981-002 With the reactor at 402 fiue, a leak'of more than five (5) gallons per minute, (gpm), developed in the drywell . Per Tech Specs 3.6.G.1, the reactor was brought to cold shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.

The cause of the event was a mechanical seal leaking water from the "A" reactor recirc pump, 1831-C001A. The seal was replaced, functionally tested and returned to service. 3 A generic study revealed no inherent problems with recirc pump seals on Unit I and Unit II. This is a non-repetitive event. Safe plant operation was not affected nor was there any effect on the health and safety of the public due to this event.