Proposes 780414 for Review Completion of Util 780308 Rept SL-3629, Design Analysis & Installation of Driven H-Pile Foundations. Const Effort on safety-related Structures Suspended Pending Review of Proposal
ML19340C309
Person / Time
Site: Bailly
Issue date: 03/20/1978
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Gammill W, Knight J
Office of Nuclear Reactor Regulation
Shared Package
ML19340C304 List:
References
NUDOCS 8011140482
Download: ML19340C309 (1)


Text

/ T' V '.

.t"

~

Ous u o s' o ts

[ i 9 k

'D H t.E AR HEGULAT 19Y COMMISslON

~

W ASHING TON D. C. 205%

,* t.

l s

S

'i,,,, ;/

MAR 2 01978 Docket No:

50-367

,s..,.

MEMORANDUM FOR:

J. Knight, Assistant Director for Engineering Division of Systems Safety

[W. Gannill, Assistant Director for Site Technology 1 vision of Site Safety and Environmental Analysis FROM:

D. B. Vassallo, Assistant Director for Light Water Reactors Division of Project Management

SUBJECT:

REVIEW OF DESIGN CRITERIA FOR THE BAILLY FOUNDATION PILES filPSCO submitted its proposed design criteria for the Bailly foundation piles in a report which accompanied the transmittal letter, dated March 8, 1978.

This report SL-3629, " Design Analysis and Installation of Driven H-Pile Foundations," was hand carried to the SEB and GSB reviewers on fiarch 10, 1978.

Since this report is fairly extensive and will probably require-assistance from our consultants (e.g., Newmark et al), I propose that completion of the review of this report be scheduled for April 14, 1978.

If this tentative review schedule will adversely affect the review effort on other high priority matters, I suggest that we discuss this impact at a meeting in my office.

With regard to our review effort on the proposed design criteria for the Bailly foundation piles, I should like to note that essentially all con-struction effort on the safety-related structures at the Bailly site has been suspended pending staff review of this proposal.

This is in accordance with R. S. Boyd's letter of February 11,1978. (refer to enclosure 1).

In its letter of March 8,1978, NIPSCO requested that the staff complete its revi?s on a schedule which would permit them to resume installation of the safety-related piles in April 1978 (refer to enclosure 2).

)

m-9,.?

..) f;*[r : "; : ; 1 6 cf % J D. B. Vassallo, Assistant Director for Light Water Reactors Division of Project Management

Enclosures:

As stated 8011140YTA

.