MONTHYEARML19256G0641979-12-17017 December 1979 Discusses Review of NRC 791213 Request Re Commitment to Implement TMI Lessons Learned Task Force Category a Requirements by 800101.Intends to Implement Recommendations During Current Refueling Outage Project stage: Other ML19309A8581980-03-28028 March 1980 Forwards Documents Re Investigation Into Extended Outages at Facility.Documents Include Trial Staff Statement Before PA Public Util Commission,Consumer Advocate Statement & CN Dunn Testimony Project stage: Request ML19309H2151980-04-15015 April 1980 Notification of 800422 Meeting W/Util in Bethesda,Md to Discuss & Review Decay Heat Exchanger Sys Integrity & Operation Project stage: Request IR 05000334/19800081980-05-0707 May 1980 IE Insp Rept 50-334/80-08 on 800324-28.No Noncompliance Noted.Major Areas Inspected:Qa Program Review,Qa/Qc Administrative Design Change & Mod Control,Measurement & Test & Previous Insp Items Project stage: Request ML19310A4261980-06-0909 June 1980 Responds to & Schedule for Implementation of TMI-2-related Requirements.Discusses Shift Manning,Scope & Criteria for Licensing Exam,Procedures for Feedback of Operating Experience & Control Room Habitability Project stage: Other ML19338D4281980-08-20020 August 1980 Notification of Contract Execution,Mod 4 to Engineering Assistance Re Hearings for South Tx Antitrust & Comanche Peak Antitrust Proceedings Project stage: Other ML19338D7401980-09-16016 September 1980 Confirms 800909 Telcon Re Basis for Selecting Essential Sys Regarding Clarification of NUREG-0578 Item 2.1.4 Project stage: Other ML19338D5631980-09-17017 September 1980 Confirms 800904 Telcon Re Compliance w/NUREG-0578,Item 2.1.3.b Concerning Wide Range Pressure Inputs & Resistance Temp Detector Uncertainty.Util Will Upgrade nonsafety-grade Input to Safety Grade During Second Refueling Project stage: Other ML20002B1321980-10-31031 October 1980 Immediate Action Ltr 80-46 Enumerationg Actions Taken by Util.Requests Response If Such Actions Differ from Actions Actually Planned by Util Project stage: Other ML19341C8461981-02-11011 February 1981 Forwards Amend 39 to License DPR-66,safety Evaluation & Notice of Issuance & Availability Project stage: Approval 1980-05-07
[Table View] |
Text
- cM.
'% F Duquesne Lidit m.s..
433 $.stft Averse W. PS-DUQUESNE LIGHT COMPANY Beaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 September 16, 1980 BVPS/LC:JDS:396 Memorandum of Telephone Conversation Clarification of NUREG 0578 Item 2.1.4 Mr. William J. Ross, Licensing Project Manager United States Nuclear Regulatory Commissicn Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C.
20555
Dear l'. Ross:
This memorandum confirms our telephone conversation of September 9, 1980 concerning the basis for celecting the essential system in our submittal on the above reference. The following statement was given as our response to your question.
"The basis for selecting those systems which are designated as " Essential" for CIA and CIB isolation signals in our response to Item 2.1.4 of NUREG 0578 was a review of the accident analysis in Section 14 of the BVPS FSAR and the BVPS Emergency Operating Procedures.
Based on this review, those systems which are required.to operate or be operable to take the proper emergency actions to mitigate the consequences of an accifeat, prevent core damage or limit radioactive release to the environment were classified as essential for the particular containment isolation signal involvad."
If you have any questions, please contact me.
Q.10. a
[j0 J. D. Sieber Superintendent Licensing & Compliance RFB:ba 7//f 8009230
&