MONTHYEARML19256G0641979-12-17017 December 1979 Discusses Review of NRC 791213 Request Re Commitment to Implement TMI Lessons Learned Task Force Category a Requirements by 800101.Intends to Implement Recommendations During Current Refueling Outage Project stage: Other ML19309A8581980-03-28028 March 1980 Forwards Documents Re Investigation Into Extended Outages at Facility.Documents Include Trial Staff Statement Before PA Public Util Commission,Consumer Advocate Statement & CN Dunn Testimony Project stage: Request ML19309H2151980-04-15015 April 1980 Notification of 800422 Meeting W/Util in Bethesda,Md to Discuss & Review Decay Heat Exchanger Sys Integrity & Operation Project stage: Request IR 05000334/19800081980-05-0707 May 1980 IE Insp Rept 50-334/80-08 on 800324-28.No Noncompliance Noted.Major Areas Inspected:Qa Program Review,Qa/Qc Administrative Design Change & Mod Control,Measurement & Test & Previous Insp Items Project stage: Request ML19310A4261980-06-0909 June 1980 Responds to & Schedule for Implementation of TMI-2-related Requirements.Discusses Shift Manning,Scope & Criteria for Licensing Exam,Procedures for Feedback of Operating Experience & Control Room Habitability Project stage: Other ML19338D4281980-08-20020 August 1980 Notification of Contract Execution,Mod 4 to Engineering Assistance Re Hearings for South Tx Antitrust & Comanche Peak Antitrust Proceedings Project stage: Other ML19338D7401980-09-16016 September 1980 Confirms 800909 Telcon Re Basis for Selecting Essential Sys Regarding Clarification of NUREG-0578 Item 2.1.4 Project stage: Other ML19338D5631980-09-17017 September 1980 Confirms 800904 Telcon Re Compliance w/NUREG-0578,Item 2.1.3.b Concerning Wide Range Pressure Inputs & Resistance Temp Detector Uncertainty.Util Will Upgrade nonsafety-grade Input to Safety Grade During Second Refueling Project stage: Other ML20002B1321980-10-31031 October 1980 Immediate Action Ltr 80-46 Enumerationg Actions Taken by Util.Requests Response If Such Actions Differ from Actions Actually Planned by Util Project stage: Other ML19341C8461981-02-11011 February 1981 Forwards Amend 39 to License DPR-66,safety Evaluation & Notice of Issuance & Availability Project stage: Approval 1980-05-07
[Table View] |
Text
_ -.
745 ~
M (412) 4ss-sooo 435 Santh Avenue tracurgh Pa.
DUQUESNE LIGHT COMPANY Beaver Valley Power Etation Post Office Box 4 Shippingport, PA 15077 September 17, 1980 BVPS/LC:JDS:399 Memorandum of Telephone Conversation Compliance with NUREG 0578 Item 2.1.3.b Subcooling Meter Mr. William J. Ross, Licensing Project Manager United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C.
20555
Dear Mr. Ross:
This memorandum confirms a telephone conversation on September 4, 1980 with Mr. Mel Fields concerning the position of Beaver Valley Unit No. 1 with respect to the wide range pressure inputs and the RTD uncertainty.
~
The subcooling meter presently utilizes one safety grade range pressure input, the other wide range input is not considered safety grade. DLC will take the'necessary action to upgrade the non safety grade input to safety grade during the second refueling.
The uncertainty listed for the RTD's listed in tne table of our response takes into account all variables (i.e. calibration,. instrument drift, indi-cator accuracy, etc.) The overall uncertainty listed for the display is for the difference between the input to the subcooling meter and the meter display.
If you have any further questions, please contact me.
Very truly yours,
,2/ M 10
/M.D.Sieber g
Superintendent Licensing and Compliance