Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-313/78-03. Response Inadequate;Requests Further Util Consideration
ML19326B686
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/25/1978
From: Randy Hall
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19326B679 List:
References
NUDOCS 8004170526
Download: ML19326B686 (2)


See also: IR 05000313/1978003

Text

?

c')

-

.

.

UNITED STATES

, (c

%[0

(f

\\j,,(3

s

)

NUCLEAR REGULATORY COMMISSION

g

2'

"

REGION IV

n

7 .9

j

611 RYAN PLAZA DRIVE. SUITE 1000

[t

ARLINGTON. TEXAS 76011

, , ,

. ' ,

April 25,1978

.

Docket No. 50-313

,

Arkansas Power and Light Company

AlTN: Mr. William Cavanaugh III

Executive Director of Generation

and Construction

P. O. Box 551

Little Rock, Arkansas 72203

'

Gentlemen:

We have received your reply dated March 20,1978,' in response.to our

Notice of Violation dated February 24, 1978.

We have also reviewed your

internal memorandum dated March 8,1978, and your company records relative

to the apparent item of noncompliance.

Based on our review, we have con-

cluded that your actions taken following reporting of internal pitting in

the decay heat removal and building spray systems, were equivalent to the

actions specified in your Quality Assurance Plan; however, these actions

were apparently not documented until after our citation.

In your reply you indicated that you do not consider the reported pitting

to be a deviation, deficiency, malfunction or other abnormal occurrence or

condition.

Our position is that detection of pitting type degradation of

stainless steel piping used in safety related systems would be a deficiency

or an abnormal condition.

L . r engineering review of February ll,1977, as

documented in your internal memorandum dated March 8,1978, which supported

the continued use of this pipe, appears 'to indicate that you likewise felt

' that the observed pitting was an area of concern. Accordingly, it is our

position that paragraph 16.2.1 of.your QA Manual was an appropriate basis

l

for documentation and disposition of this observed condition.

3

1e

.

.

8 0 04170f2 [

.

.

.

- .

.

..

'

'

Arkansas Power and Light Company

-2-

April 25, 1978

i

'

Since we continue to consider this item to be an infraction, please provide

the corrective steps which wi,11 be taken to avoid further noncompliance in

this area.

-

Sincerely,

<

M

'

R. E. Hall, Acting Chief,

Reactor Operations and

Nuclear Support Branch

cc:

J. Anderson, Plant Superintendent

i

Arkansas Nuclear One

P. O. Box 608

Russellville, Arkansas 73801

L. Alexander, QC Supervisor

O

(Same Address)

.

e

O

l

f

.

.

O

e

4

"'-#

e

=

--

, , . . ___ . .,..