ML20004G097

From kanterella
Jump to navigation Jump to search
Application to Amend Licenses DPR-24 & DPR-27,modifying Plant Organization & Position Titles,Submitted in 810406 Tech Spec Change Request 67
ML20004G097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/22/1981
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20004G098 List:
References
TAC-43742, TAC-43743, NUDOCS 8106290175
Download: ML20004G097 (2)


Text

____________ _____ __ __ _ _ _

A4 I I 1 %%

,pWK' N.

bh]) ".

'? %Q l Wisconsin Electnc powra courm 231 W. WICHIGAN, P.O. BOX 2046 MILWAUKEE, WI 5320s 7s j.

-g .

h4 '-

I June 22.//J 1 ,,,

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Attention: Mr. Robert A. Clark, Chief

. Operating Reactor Branch NuAber 3 Gentlemen:  !

DOCKET NOS. 50-266 AND 50-_301 MODIFICATION TO TECHNICAL SPECIFICATIONS i C11ANGE REQUEST HO. _6_7 POINT BEACli NUCLEAR PLANT UNITS 1 AND 2 ,

In our letter dated April 6,1961 Wisconsin Electric Power Company (Licensee) requested amendments to Facility ,

Operating Licenses DPR-24 and DPR-27 to permit changes to the Point Beach Nuclear Plant Technical Specifications. These changes, as described in that submittal, included modifications to the plant staff organization and staff position titles. i Subsequent to that submittal, the Licensee has changed the  ;

titles of three additional staff positions indicated on Technical '

Specification Figure 15.6.2-2. These changes consist of the j following l

1. The Reactor Engineer has become the Superintendent  ;

Reactor Engineering.  ;

2. The Instrumentation and Control Engineer has become ,

the Superintendent - Instrumentation and Control.

3. The Training Engineer position has been retitled l Superintendent - Training. ,

These revisions involve a change in position title only. i The responsibilities and reportability of these positions are not  !

changed froan those proposed in our change request Ir ter dated j April 6, 1981. A revised Figure 15.6.2-2 which reflected these title changes has been submitted for your convenience.

(  !

i ,,

810629 o l}[

I Mr. Barold R. Denton, Director June 22, 1981 s

It is requested that these title changes be reviewed l<

and issued along with your action on our change request number 67, t Should you have any questions regarding this modification to our E<

previously substitted license amendments request, please let us know. .,

Very truly yours,

/ -

Sol Burstein Executive Vice President Copy to NRC Resident Inspector Point Beach Nuclear Plant ,

t Sascribed and sworn to before me  !

This A N "' 0'cid *l a-w , llf! (

l.

. O Abh/. cb Ww4 Notary Public, State of Wisconsin My Commission Expires 7-I'-T I

i i

l sl 3

a Y

=

P00R BRGML

.