ML20004G097

From kanterella
Jump to navigation Jump to search

Application to Amend Licenses DPR-24 & DPR-27,modifying Plant Organization & Position Titles,Submitted in 810406 Tech Spec Change Request 67
ML20004G097
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/22/1981
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20004G098 List:
References
TAC-43742, TAC-43743, NUDOCS 8106290175
Download: ML20004G097 (2)


Text

____________ _____ __ __ _

A4 I I 1 %%

,pWK' N.

bh])

'? % h4 l

Q Wisconsin Electnc powra courm 231 W. WICHIGAN, P.O. BOX 2046 MILWAUKEE, WI 5320s 7 j.

I

-g.

s June 22.//J 1,,,

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Attention:

Mr. Robert A. Clark, Chief Operating Reactor Branch NuAber 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-_301 MODIFICATION TO TECHNICAL SPECIFICATIONS i

C11ANGE REQUEST HO. _6_7 POINT BEACli NUCLEAR PLANT UNITS 1 AND 2 In our letter dated April 6,1961 Wisconsin Electric Power Company (Licensee) requested amendments to Facility Operating Licenses DPR-24 and DPR-27 to permit changes to the Point Beach Nuclear Plant Technical Specifications.

These changes, as described in that submittal, included modifications to the plant staff organization and staff position titles.

i Subsequent to that submittal, the Licensee has changed the titles of three additional staff positions indicated on Technical Specification Figure 15.6.2-2.

These changes consist of the j

following l

1.

The Reactor Engineer has become the Superintendent Reactor Engineering.

2.

The Instrumentation and Control Engineer has become the Superintendent - Instrumentation and Control.

3.

The Training Engineer position has been retitled l

Superintendent - Training.

These revisions involve a change in position title only.

i The responsibilities and reportability of these positions are not changed froan those proposed in our change request Ir ter dated j

April 6, 1981.

A revised Figure 15.6.2-2 which reflected these title changes has been submitted for your convenience.

(

i 810629 o l}[

I Mr. Barold R. Denton, Director June 22, 1981 s

It is requested that these title changes be reviewed l<

and issued along with your action on our change request number 67, t

Should you have any questions regarding this modification to our E<

previously substitted license amendments request, please let us know.

Very truly yours,

/

Sol Burstein Executive Vice President Copy to NRC Resident Inspector Point Beach Nuclear Plant t

Sascribed and sworn to before me This A N "'

0'cid

  • l a-w llf!

(

l.

O Abh/. cb Ww4 Notary Public, State of Wisconsin My Commission Expires 7-I'-T I

i i

lsl 3

a Y

=

P00R BRGML

.