Text
____________ _____ __ __ _
A4 I I 1 %%
,pWK' N.
bh])
'? % h4 l
Q Wisconsin Electnc powra courm 231 W. WICHIGAN, P.O. BOX 2046 MILWAUKEE, WI 5320s 7 j.
I
-g.
s June 22.//J 1,,,
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.
20555 Attention:
Mr. Robert A. Clark, Chief Operating Reactor Branch NuAber 3 Gentlemen:
DOCKET NOS. 50-266 AND 50-_301 MODIFICATION TO TECHNICAL SPECIFICATIONS i
C11ANGE REQUEST HO. _6_7 POINT BEACli NUCLEAR PLANT UNITS 1 AND 2 In our letter dated April 6,1961 Wisconsin Electric Power Company (Licensee) requested amendments to Facility Operating Licenses DPR-24 and DPR-27 to permit changes to the Point Beach Nuclear Plant Technical Specifications.
These changes, as described in that submittal, included modifications to the plant staff organization and staff position titles.
i Subsequent to that submittal, the Licensee has changed the titles of three additional staff positions indicated on Technical Specification Figure 15.6.2-2.
These changes consist of the j
following l
1.
The Reactor Engineer has become the Superintendent Reactor Engineering.
2.
The Instrumentation and Control Engineer has become the Superintendent - Instrumentation and Control.
3.
The Training Engineer position has been retitled l
Superintendent - Training.
These revisions involve a change in position title only.
i The responsibilities and reportability of these positions are not changed froan those proposed in our change request Ir ter dated j
April 6, 1981.
A revised Figure 15.6.2-2 which reflected these title changes has been submitted for your convenience.
(
i 810629 o l}[
I Mr. Barold R. Denton, Director June 22, 1981 s
It is requested that these title changes be reviewed l<
and issued along with your action on our change request number 67, t
Should you have any questions regarding this modification to our E<
previously substitted license amendments request, please let us know.
Very truly yours,
/
Sol Burstein Executive Vice President Copy to NRC Resident Inspector Point Beach Nuclear Plant t
Sascribed and sworn to before me This A N "'
0'cid
- l a-w llf!
(
l.
O Abh/. cb Ww4 Notary Public, State of Wisconsin My Commission Expires 7-I'-T I
i i
lsl 3
a Y
=
P00R BRGML
.