ML20004G099
| ML20004G099 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/22/1981 |
| From: | WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20004G098 | List: |
| References | |
| TAC-43742, TAC-43743, NUDOCS 8106290177 | |
| Download: ML20004G099 (1) | |
Text
- _ - _ _ _
a.
v u N
O
'm CONDUCT OF PIMF OPERATICIIS O
e FIGURE 15.6.2-2 M
.D
~
Manager -
(1)
Nuclear Operations
- O g---------------_.-------
r am i Manager's g lg Supervisory j
V 3
Staff
?
l l
l
't l
I l'
I OPERATIONS & SUPPORT I
l ADMINISTRATIVE & ErIGINEERItoG SERVICES I
3 General (1) 1 Superintendent i
I; g
e I
I I
I l
- TEO'HICAL SERVICES OPERATIONS TRJ.!NING
$ULifffENANCE & C00sSTRuCSION I
l i
I l
I i
Iuperintendent-
~
Superintendent -
(1) k I
Engineering, Quality f,uperintendent - (1)
Superintendent -(1)
, Superintendent-Maintenance &
Technical Services Operations (SRO)
Ir81Rin9 (1)
Construction (1)
{
l
& Regulator y' i
l l
I e
i Maintenance Assistant to Superintendent-l Supervisors I
l
(
CitEMISTRY & HEALTH 814YSICS RF% R D8 Git 4EERING INSTRUMEt#T & CONTROL i
g i
f g
l I
- Superintendent-I L
l
' Superintendent-g
- Superintendent -
Ch*"15t'Y ' Health Reactor Engineering l Instrumentation and Shift Superviso" Duty Technical Physics (1)
(1)
COntrO] (1) i
- Advisors One per shift ($RO) b g
t i
"UIE88 i
Nuclear Plant Technicians 3
1.
The Operations Group shift makeup is I
dmmm the minimame size far operation in all
[
Engineers l
shaft (SRO or RO) undes except cold shutdowr. of Point l
- s..
Health (1)
I Beach Unit Nos. 1 & 2.
The 0g= -
Physfclet
- Ir ada bistrative matters & routine HP that the minimum reiluirements for a f
g control Operator
- tions group shif t makeup suy t.o less 2.
Ona por shift-one Radnoc h ist concerns the HP reporte directly to the period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> In unit ggg Supt.-Chtaistry & Itealth Ptiysics.
in order to accessedate onespecteJ matters of radiological health & safety Two Por shift-two units FRO) absence of on-duty shift crew members, l'olicy determinati n intetPretation, or Nuclear Plant implementation, the HP (based on HP judg=
l provided immediate action is taken to e
restore the shift makeup to within the g g rient) reporta directly to the Manager -
Aux 11tary Operatore
"I Y # @ "*"*"*
Nuclear Operations Two p r shift-one unit 4.
An unexpocted absence of a Duty 3.
SRO = NRC Senior Reactor Operator License Three per shift-two eSee Specification 15.6.2.2 Q
Technical Advisor shall be treated RO = NRC Reactor Operator 1.icense units similar to Note 1.
The Duty Technical
.s es**zam me7 Advisor is located on-site on ten
(*
sinute call to the control room.
.A U A==
_