ML20004G099
ML20004G099 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 06/22/1981 |
From: | WISCONSIN ELECTRIC POWER CO. |
To: | |
Shared Package | |
ML20004G098 | List: |
References | |
TAC-43742, TAC-43743, NUDOCS 8106290177 | |
Download: ML20004G099 (1) | |
Text
- _ - _ _ _ -_-___. __ _
a.
v u N .
O 'm CONDUCT OF PIMF OPERATICIIS * *'
O FIGURE 15.6.2-2 e
M ~ Manager - (1)
.D Nuclear Operations
- O g---------------_.------- r am i Manager's g lg V Supervisory j l
3 Staff ?
l .
't l
l
- I
- l' I OPERATIONS & SUPPORT I l I ADMINISTRATIVE & ErIGINEERItoG SERVICES 3 General (1) .
1 Superintendent i
g I;
, e I I I l I $ULifffENANCE & C00sSTRuCSION I
' - TEO'HICAL SERVICES OPERATIONS TRJ.!NING '
l l i I I
~
i Superintendent - (1)
Superintendent -(1) Iuperintendent-Engineering, Quality f,uperintendent - (1) , Superintendent- Maintenance & k I Technical Services Operations (SRO) Construction (1) {
l & Regulator y' Ir81Rin9 (1) l i e l I i Assistant to Maintenance Superintendent- l Supervisors I l (
CitEMISTRY & HEALTH 814YSICS RF% R D8 Git 4EERING INSTRUMEt#T & CONTROL g i
g f i l I .
l _!
- Superintendent- I L
- Superintendent - ' Superintendent-g Ch*"15t'Y ' Health Reactor Engineering l Instrumentation and Shift Superviso" Duty Technical i Physics (1) (1) COntrO] (1) One per shift ($RO) -
- Advisors g b t
i "UIE88 i Nuclear Plant Technicians 3 ,
The Operations Group shift makeup is I 1.
Engineers dmmm the minimame size far operation in all [
l
- s. . Health (1)
Physfclet g I Beach Unit Nos. 1 & 2. The 0g= -
control Operator
- tions group shif t makeup suy t.o less .
-2.Ir ada bistrative matters & routine HP Ona por shift-one that the minimum reiluirements for a f
- Radnoc h ist concerns the HP reporte directly to the period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ggg unit Supt.-Chtaistry & Itealth Ptiysics. In Two Por shift-two in order to accessedate onespecteJ matters of radiological health & safety units FRO) absence of on-duty shift crew members, l'olicy determinati n intetPretation, or e
provided immediate action is taken to Nuclear Plant implementation, the HP (based on HP judg= l restore the shift makeup to within the
_ g g ,,
rient) reporta directly to the Manager - Aux 11tary Operatore
"I Y # @ "*"*"*
, Nuclear Operations Two p r shift-one unit An unexpocted absence of a Duty 3. SRO = NRC Senior Reactor Operator License eSee Specification 15.6.2.2 '
- 4. RO = NRC Reactor Operator 1.icense Three per shift-two Q
es**zam Technical Advisor shall be treated similar to Note 1. The Duty Technical units
.s me7 Advisor is located on-site on ten
.A
(* sinute call to the control room.
U A== _